MONTHYEAR0CAN102401, Response to Request for Additional Information - Arkansas Nuclear One – Units 1 and 2, Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzle2024-10-16016 October 2024 Response to Request for Additional Information - Arkansas Nuclear One – Units 1 and 2, Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles 2CAN102401, Cycle 31 Core Operating Limits Report (COLR)2024-10-14014 October 2024 Cycle 31 Core Operating Limits Report (COLR) 1CAN082401, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 1 Thirty-First Refueling Outage (1R312024-08-13013 August 2024 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 1 Thirty-First Refueling Outage (1R31 2CAN072401, Proposed Alternative for Implementation of Extended Reactor Vessel In-Service Inspection Interval (ANO2-ISI-24-02)2024-07-19019 July 2024 Proposed Alternative for Implementation of Extended Reactor Vessel In-Service Inspection Interval (ANO2-ISI-24-02) 0CAN072401, Annual 10 CFR 50.46 Report for Calendar Year 2023 Emergency Core Cooling System Evaluation Changes2024-07-0808 July 2024 Annual 10 CFR 50.46 Report for Calendar Year 2023 Emergency Core Cooling System Evaluation Changes 1CAN072401, Request for Review and Approval of Changes to the Safety Analysis Report and to a Confirmatory Order Clarifying an Alternate Means of Compliance for Pressurizer Heaters Emergency Power Supply2024-07-0202 July 2024 Request for Review and Approval of Changes to the Safety Analysis Report and to a Confirmatory Order Clarifying an Alternate Means of Compliance for Pressurizer Heaters Emergency Power Supply 0CAN062403, Groundwater Protection Initiative - Voluntary Special Report for Tritium Levels2024-06-25025 June 2024 Groundwater Protection Initiative - Voluntary Special Report for Tritium Levels 0CAN062402, Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles2024-06-0606 June 2024 Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles 0CAN052401, – Units 1 and 2, Submittal of Annual Radiological Environmental Operating Report for 20232024-05-13013 May 2024 – Units 1 and 2, Submittal of Annual Radiological Environmental Operating Report for 2023 1CAN052401, Cycle 32 Core Operating Limits Report2024-05-0404 May 2024 Cycle 32 Core Operating Limits Report 2CAN042403, Response to the Request for Additional Information Regarding ANO-2 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended C2024-04-24024 April 2024 Response to the Request for Additional Information Regarding ANO-2 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended C 0CAN042402, Annual Occupational Radiation Exposure Report for 20232024-04-23023 April 2024 Annual Occupational Radiation Exposure Report for 2023 0CAN042401, Radioactive Effluent Release Report for the 2023 Calendar Year2024-04-15015 April 2024 Radioactive Effluent Release Report for the 2023 Calendar Year 2CAN042402, Special Report of Non-functional Main Steam Line Radiation Monitor2024-04-11011 April 2024 Special Report of Non-functional Main Steam Line Radiation Monitor 2CAN042401, Request to Revise Typographical Errors in Arkansas Nuclear One, Unit 2 Technical Specifications2024-04-0404 April 2024 Request to Revise Typographical Errors in Arkansas Nuclear One, Unit 2 Technical Specifications 2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol 2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42024-01-11011 January 2024 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN012401, Registration of Cask Use2024-01-10010 January 2024 Registration of Cask Use 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 0CAN102303, Registration of Cask Use2023-10-24024 October 2023 Registration of Cask Use 0CAN102301, Evacuation Time Estimate (ETE) Study2023-10-0404 October 2023 Evacuation Time Estimate (ETE) Study 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2023-09-14014 September 2023 Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2CAN092301, Reply to a Notice of Violation2023-09-0808 September 2023 Reply to a Notice of Violation 0CAN092301, Emergency Plan Implementing Procedure Revision2023-09-0505 September 2023 Emergency Plan Implementing Procedure Revision 0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 0CAN072301, Registration of Cask Use2023-07-18018 July 2023 Registration of Cask Use 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN062301, Status of Actions to Return to Compliance2023-06-26026 June 2023 Status of Actions to Return to Compliance 0CAN062302, Submittal of Revision 22 of the ANO Fire Hazards Analysis2023-06-20020 June 2023 Submittal of Revision 22 of the ANO Fire Hazards Analysis 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) 0CAN052303, Annual 10 CFR 50.46 Report for Calendar Year 20222023-05-24024 May 2023 Annual 10 CFR 50.46 Report for Calendar Year 2022 0CAN052302, Emergency Plan Rev. 482023-05-11011 May 2023 Emergency Plan Rev. 48 0CAN052301, Units 1 and 2 - Annual Radiological Environmental Operating Report for 20222023-05-0909 May 2023 Units 1 and 2 - Annual Radiological Environmental Operating Report for 2022 2CAN052301, Cycle 30 Core Operating Limits Report (COLR)2023-05-0303 May 2023 Cycle 30 Core Operating Limits Report (COLR) 0CAN042302, Annual Occupational Radiation Exposure Report for 20222023-04-27027 April 2023 Annual Occupational Radiation Exposure Report for 2022 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032304, Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-0352023-01-30030 January 2023 Responses to Request for Additional Information for Request for Relief ANO1-ISI-035 2CAN012303, U.S. Additional Protocol2023-01-23023 January 2023 U.S. Additional Protocol 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN122202, Registration of Cask Use2022-12-21021 December 2022 Registration of Cask Use 0CAN122201, Reply to a Notice of Violation; EA-22-0992022-12-0808 December 2022 Reply to a Notice of Violation; EA-22-099 0CAN112201, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2022-11-10010 November 2022 Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2024-08-13
[Table view] Category:Licensee Response to Notice of Violation
MONTHYEAR2CAN092301, Reply to a Notice of Violation2023-09-0808 September 2023 Reply to a Notice of Violation 0CAN122201, Reply to a Notice of Violation; EA-22-0992022-12-0808 December 2022 Reply to a Notice of Violation; EA-22-099 ML20239B0482020-07-31031 July 2020 RSP_IA-20-028_Johnson ML20239B0472020-07-31031 July 2020 RSP_IA-20-029_Spivey 2CAN031703, Reply to a Notice of Violation; EA-16-2472017-03-29029 March 2017 Reply to a Notice of Violation; EA-16-247 0CAN091501, Units 1 and 2, Response to Non-cited Violation in NRC Integrated Inspection Report 05000313/2015002 and 05000368/20150022015-09-0303 September 2015 Units 1 and 2, Response to Non-cited Violation in NRC Integrated Inspection Report 05000313/2015002 and 05000368/2015002 0CAN021504, Reply to Notice of Violation; EA-14-0882015-02-23023 February 2015 Reply to Notice of Violation; EA-14-088 0CAN071402, Units 1 and 2, Reply to Notice of Violation; EA-14-0082014-07-18018 July 2014 Units 1 and 2, Reply to Notice of Violation; EA-14-008 0CAN041301, Units 1 and 2: Response to an Apparent Violation in Inspection Report Nos. 05000313-13-503 and 05000368-13-503; EA-12-2752013-04-10010 April 2013 Units 1 and 2: Response to an Apparent Violation in Inspection Report Nos. 05000313-13-503 and 05000368-13-503; EA-12-275 0CAN011101, Reply to Notice of Violation, EA-10-2332011-01-10010 January 2011 Reply to Notice of Violation, EA-10-233 2023-09-08
[Table view] |
Text
Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4704 Stephenie L. Pyle Manager, Regulatory Assurance Arkansas Nuclear One 2CAN031703 March 29, 2017 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Reply to a Notice of Violation; EA-16-247 Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6
REFERENCES:
- 1. NRC Letter to Entergy, Arkansas Nuclear One, Unit 2 - Final Significance Determination of a White Finding and Notice of Violation, NRC Inspection Report 05000368/2017014, dated February 27, 2017 (2CNA021703) (ML17055A727)
- 2. Entergy Letter to NRC, Licensee Event Report 50-368/2016-001-00, dated November 15, 2016 (2CAN111602) (ML16320A437)
- 3. NRC Letter to Entergy, Arkansas Nuclear One - NRC Inspection Report 05000368/2016011 and Preliminary White Finding, dated January 19, 2017, (2CNA011701) (ML17019A288)
Dear Sir or Madam:
In Reference 1, the NRC transmitted a White Finding and a Notice of Violation to Entergy Operations, Inc. (Entergy). The White Finding was associated with the failure to ensure an emergency diesel generator bearing was provided with adequate lubrication. Reference 2 provided Entergys Licensee Event Report related to this White Finding which was closed by Reference 3.
Pursuant to 10 CFR 2.201, Entergys response to the Notice of Violation is provided in the attachment to this letter.
2CAN031703 Page 2 of 2 This letter contains no new regulatory commitments. If you have any questions concerning this submittal, please contact me.
Sincerely, ORIGINAL SIGNED BY STEPHENIE L. PYLE SLP/nbm
Attachment:
Reply to a Notice of Violation EA-16-247 cc: Mr. Kriss Kennedy Regional Administrator U. S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas Wengert MS O-08B1A One White Flint North 11555 Rockville Pike Rockville, MD 20852
Attachment to 2CAN031703 Reply to a Notice of Violation EA-16-247
Attachment to 2CAN031703 Page 1 of 3 NOTICE OF VIOLATION Entergy Operations, Inc. Docket No.: 05-368 Arkansas Nuclear One, Unit 2 License No.: NPF-6 EA-16-247 During an NRC inspection conducted from September 16 to December 21, 2016, a violation of NRC requirements was identified. In accordance with the NRC Enforcement Policy, the violation is listed below:
Technical Specification 6.4.1.a requires, in part, that written procedures shall be established, implemented, and maintained covering the applicable procedures recommended in Regulatory Guide 1.33, Quality Assurance Program Requirements, Revision 2, Appendix A, February 1978. Regulatory Guide 1.33, Appendix A, Section 9.a, states, in part, that maintenance that can affect the performance of safety-related equipment should be properly pre-planned and performed in accordance with written procedures, documented instructions, or drawings appropriate to the circumstances.
Contrary to the above, on November 11, 2014, and on June 22, 2016, the licensee failed to properly pre-plan and perform maintenance that can affect the performance of safety-related equipment in accordance with written procedures, documented instructions, or drawings appropriate to the circumstances. Specifically, on November 11, 2014, while performing Work Order 356569, and on June 22, 2016, while performing Work Order 52656389, the licensee failed to provide adequate documented work instructions for maintenance on the Unit 2 emergency diesel generator (EDG) A inboard generator bearing, a safety-related component, such that the minimum bearing oil level was correctly marked and maintained to ensure adequate lubrication to the bearing. As a result, the Unit 2 EDG A failed on September 16, 2016, during a 24-hour endurance test.
This violation is associated with a White significance determination process finding.
Attachment to 2CAN031703 Page 2 of 3 Reply to a Notice of Violation EA-16-247 Entergy Operations, Inc. (Entergy) concurs with the violation as cited in the Notice of Violation regarding the failure to ensure the Arkansas Nuclear One, Unit 2 (ANO-2) EDG bearing was provided with adequate lubrication.
As documented in Reference 2 of the cover letter, the ANO-2 Licensee Event Report (LER) provided details of the EDG A bearing failure. The LER was closed by Reference 3 of the cover letter. Entergy performed a root cause evaluation (RCE), and insights from the RCE are provided in the following sections.
(1) The reason for the violation The direct cause of this event is the ANO-2 EDG A inboard bearing had insufficient lubrication.
This cause is supported by the identified bearing damage and the Failure Modes Analysis.
The root cause of this event was determined to be inadequate Work Planning Standards associated with EDG inboard bearing sight glass maintenance. Specifically, there were no detailed instructions for performing as-left measurements following repair of the inboard bearing oil sight glass.
A contributing cause of this event was that the craft failed to identify the critical parameters of the sight glass scribe mark and, therefore, did not recognize that the work order lacked sufficient instruction to take measurements after maintenance was completed.
(2) The corrective steps that have been taken and the results achieved The extent-of-condition for safety-related equipment or equipment used for safe shutdown of either unit with the potential of a similar sight glass configuration issue was completed. Sight glasses were verified to have the markings at the appropriate level. Also, where available, temperature monitoring, vibration, and oil analysis, along with past equipment performance was reviewed. No equipment issues or adverse trends were identified during the review.
As part of the extent-of-condition, the ANO-1 EDGs were verified to be of dissimilar design, i.e.,
ANO-1 EDG bearings are greased bearings and not oil lubricated. Therefore, the ANO-1 EDG bearings do not utilize sight glasses or scribe marks.
Detailed instructions for measuring the EDG bearing sight glass elevation in support of future bearing-related work order development have been implemented to ensure that when repairs are completed on the sight glass, the as left measurements of the sight glass scribe mark are verified per the vendor technical documents.
If the sight glass is manipulated during preventative maintenance, the ANO-2 EDG maintenance procedure has been revised to verify the inboard and outboard sight glass scribe mark locations following corrective maintenance in order to ensure the scribe marks were not inadvertently altered during maintenance.
A corrective action to prevent recurrence has been completed to create information labels to be added to the end bells of the ANO-2 EDGs near the inboard and outboard bearings, stating that
Attachment to 2CAN031703 Page 3 of 3 the bearing oil level sight glass scribe mark is established in accordance with a site procedure, and if the sight glass or associated piping is disturbed, the scribe mark must be verified per the site procedure. In addition, procedures that allow removal of the end bells have been revised to add guidance to re-measure these scribe marks if the end bells are removed.
(3) The corrective steps that will be taken Training is in progress for the craft and planning department. The intent of this action is to ensure that critical steps are identified in work instructions and that proper guidance is included to ensure a successful outcome.
(4) The date when full compliance will be achieved The ANO-2 EDG was returned to operable status on October, 22, 2016. Full compliance was achieved by February 16, 2017, when the ANO-2 EDG maintenance procedure and work order instructions were revised.