2CAN102401, Cycle 31 Core Operating Limits Report (COLR)
ML24288A014 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear ![]() |
Issue date: | 10/14/2024 |
From: | Keele R Entergy Operations |
To: | Office of Nuclear Reactor Regulation, Document Control Desk |
References | |
2CAN102401 | |
Download: ML24288A014 (1) | |
Text
- ) entergy 2CAN102401 October 14, 2024 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
ANO-2 Cycle 31 Core Operating Limits Report (COLR)
Arkansas Nuclear One, Unit 2 NRC Docket No. 50-368 Renewed Facility Operating License No. NPF-6 Riley D. Keele, Jr.
Manager, Regulatory Assurance Arkansas Nuclear One Tel 479-858-7826 Arkansas Nuclear One - Unit 2 (ANO-2) Technical Specification 6.6.5 requires the submittal of the Core Operating Limits Report (COLR) for each reload cycle. Attached is Revision O of the ANO-2 Cycle 31 COLR. This completes the reporting requirement for the referenced specification.
This submittal contains no commitments.
If there are any questions or if additional information is needed, please contact Riley Keele, Manager, Regulatory Assurance, Arkansas Nuclear One, at 479-858-7826.
Respectfully, RDK/mar
Enclosure:
ANO-2 Core Operating Limits Report (COLR) for Cycle 31 Entergy Operations, Inc. 1448 SR 333, Russellville, AR 72802
2CAN102401 Page 2 of 2 cc:
NRC Region IV Regional Administrator NRC Senior Resident Inspector - Arkansas Nuclear One NRC Project Manager - Arkansas Nuclear One Designated Arkansas State Official
Enclosure 2CAN102401 ANO-2 Core Operating Limits Report (COLR) for Cycle 31 (13 pages)
ANO-2 Cycle 31 COLR Revision 0 1
ENTERGY OPERATIONS ARKANSAS NUCLEAR ONE - UNIT 2 CORE OPERATING LIMITS REPORT FOR CYCLE 31 REVISION 0
ANO-2 Cycle 31 COLR Revision 0 2
CORE OPERATING LIMITS REPORT FOR CYCLE 31 Revision 0 INDEX PAGE I.
INTRODUCTION........................................................................................................ 3 II.
SUMMARY
OF CHANGES......................................................................................... 3 III.
AFFECTED TECHNICAL SPECIFICATIONS............................................................ 3 IV.
APPROVED METHODOLOGIES USED TO DETERMINE LIMITS........................... 4 V.
CORE OPERATING LIMITS....................................................................................... 7 VI.
LIST OF FIGURES..................................................................................................... 8
ANO-2 Cycle 31 COLR Revision 0 3
ARKANSAS NUCLEAR ONE - UNIT 2 CORE OPERATING LIMITS REPORT FOR CYCLE 31 I.
INTRODUCTION This CORE OPERATING LIMITS REPORT (COLR) has been prepared in accordance with the requirements of Arkansas Nuclear One - Unit 2 (ANO-2) Technical Specification 6.6.5 for ANO-2's Cycle 31. This is Revision 0 of the Cycle 31 COLR.
II.
SUMMARY
OF CHANGES There were no changes to any limits from the latest revision of the Cycle 30 COLR.
III. AFFECTED TECHNICAL SPECIFICATIONS
- 1) 3.1.1.1 Shutdown Margin - Tavg > 200 °F
- 2) 3.1.1.2 Shutdown Margin - Tavg 200 °F
- 3) 3.1.1.4 Moderator Temperature Coefficient
- 4) 3.1.3.1 CEA Position
- 5) 3.1.3.6 Regulating and Group P CEA Insertion Limits
- 6) 3.2.1 Linear Heat Rate
- 7) 3.2.3 Azimuthal Power Tilt - Tq
- 8) 3.2.4 DNBR Margin
- 9) 3.2.7 Axial Shape Index
ANO-2 Cycle 31 COLR Revision 0 4
IV. APPROVED METHODOLOGIES USED TO DETERMINE LIMITS Provided below are the analytical methods used to determine the core operating limits addressed by the individual Technical Specifications. These methods have been reviewed and approved by the NRC.
- 1)
"Qualification of the PHOENIX-P / ANC Nuclear Design System for Pressurized Water Reactor Cores," (WCAP-11596-P-A), June 1988, "ANC: A Westinghouse Advanced Nodal Computer Code" (WCAP-10965-P-A), September 1986, and "ANC: A Westinghouse Advanced Nodal Computer Code: Enhancements to ANC Rod Power Recovery" (WCAP-10965-P-A, Addendum 1), April 1989 (Methodology for Specifications 3.1.1.1, 3.1.1.2 for Shutdown Margins, 3.1.1.4 for MTC, 3.1.3.6 for Regulating and Group P CEA Insertion Limits; and 3.2.4.b for DNBR Margin)
- 2)
"CE Method for Control Element Assembly Ejection Analysis," CENPD-0190-A, January 1976 (Methodology for Specification 3.1.3.6 for Regulating and Group P CEA Insertion Limits, and 3.2.3 for Azimuthal Power Tilt)
- 3)
"Modified Statistical Combination of Uncertainties," CEN-356(V)-P-A, Revision 01-P-A, May 1988 (Methodology for 3.2.4.c and 3.2.4.d for DNBR Margin, and 3.2.7 for ASI)
- 4)
"Calculative Methods for the CE Large Break LOCA Evaluation Model," CENPD-132-P, August 1974 (Methodology for Specifications 3.1.1.4 for MTC, 3.2.1 for Linear Heat Rate, 3.2.3 for Azimuthal Power Tilt, and 3.2.7 for ASI)
- 5)
"Calculational Methods for the CE Large Break LOCA Evaluation Model," CENPD-132-P, Supplement 1, February 1975 (Methodology for Specifications 3.1.1.4 for MTC, 3.2.1 for Linear Heat Rate, 3.2.3 for Azimuthal Power Tilt, and 3.2.7 for ASI)
- 6)
"Calculational Methods for the CE Large Break LOCA Evaluation Model," CENPD-132-P, Supplement 2-P, July 1975 (Methodology for Specifications 3.1.1.4 for MTC, 3.2.1 for Linear Heat Rate, 3.2.3 for Azimuthal Power Tilt, and 3.2.7 for ASI)
- 7)
"Calculative Methods for the CE Large Break LOCA Evaluation Model for the Analysis of CE and W Designed NSSS," CENPD-132, Supplement 3-P-A, June 1985 (Methodology for Specifications 3.1.1.4 for MTC, 3.2.1 for Linear Heat Rate, 3.2.3 for Azimuthal Power Tilt, and 3.2.7 for ASI)
- 8)
"Calculative Methods for the CE Nuclear Power Large Break LOCA Evaluation Model,"
CENPD-132-P, Supplement 4-P-A, Revision 1, December 2000 (Methodology for Specifications 3.1.1.4 for MTC, 3.2.1 for Linear Heat Rate, 3.2.3 for Azimuthal Power Tilt, and 3.2.7 for ASI)
ANO-2 Cycle 31 COLR Revision 0 5
- 9)
"Calculative Methods for the CE Nuclear Power Large Break LOCA Evaluation Model - Improvement to 1999 Large Break LOCA EM Steam Cooling Model for Less Than 1 in/sec Core Reflood," CENPD-132, Supplement 4-P-A, Addendum 1-P and Final Safety Evaluation for Westinghouse Electric Company (Westinghouse) Topical Report (TR)
CENPD-132, Supplement 4-P-A, Addendum 1-P, "Calculative Methods for the CE Nuclear Power Large Break LOCA Evaluation Model - Improvement to 1999 Large Break LOCA EM Steam Cooling Model for Less Than 1 in/sec Core Reflood," (Methodology for Specification 3.1.1.4 MTC, 3.2.1 for Linear Heat Rate, 3.2.3 for Azimuthal Power Tilt, and 3.2.7 for ASI)
- 10) "Calculative Methods for the CE Small Break LOCA Evaluation Model," CENPD-137-P, August 1974 (Methodology for Specifications 3.1.1.4 for MTC, 3.2.1 for Linear Heat Rate, 3.2.3 for Azimuthal Power Tilt, and 3.2.7 for ASI)
- 11) "Calculative Methods for the CE Small Break LOCA Evaluation Model," CENPD-137, Supplement 1-P, January 1977 (Methodology for Specifications 3.1.1.4 for MTC, 3.2.1 for Linear Heat Rate, 3.2.3 for Azimuthal Power Tilt, and 3.2.7 for ASI)
- 12) "Calculative Methods for the CE Small Break LOCA Evaluation Model," CENPD-137, Supplement 2-P-A, April 1998 (Methodology for Specifications 3.1.1.4 for MTC, 3.2.1 for Linear Heat Rate, 3.2.3 for Azimuthal Power Tilt, and 3.2.7 for ASI)
- 13) "Technical Manual for the CENTS Code," WCAP-15996-P-A, Rev. 1, March 2005 (Methodology for Specifications 3.1.1.1 and 3.1.1.2 for Shutdown Margin, 3.1.1.4 for MTC, 3.1.3.1 for CEA Position, 3.1.3.6 for Regulating and Group P Insertion Limits, and 3.2.4.b for DNBR Margin)
CENPD-404-P-A, Revision 0, November 2001 (Modifies CENPD-132-P and CENPD-137-P as methodology for Specifications 3.1.1.4 for MTC, 3.2.1 for Linear Heat Rate, 3.2.3 for Azimuthal Power Tilt, and 3.2.7 for ASI)
- 15) "Qualification of the Two-Dimensional Transport Code PARAGON," WCAP-16045-P-A, August 2004 (May be used as a replacement for the PHOENIX-P lattice code as methodology for Specifications 3.1.1.1 and 3.1.1.2 for Shutdown Margins, 3.1.1.4 for MTC, 3.1.3.6 for Regulating and Group P CEA Insertion Limits, and 3.2.4.b for DNBR Margin)
- 16) "Implementation of Zirconium Diboride Burnable Absorber Coatings in CE Nuclear Power Fuel Assembly Designs," WCAP-16072-P-A, Revision 0, August 2004 (Methodology for Specifications 3.1.1.4 for MTC, 3.2.1 for Linear Heat Rate, 3.2.3 for Azimuthal Tilt, and 3.2.7 for ASI)
- 17) Letter: O.D. Parr (NRC) to F.M. Stern (CE) dated June 13, 1975 (NRC Staff Review of Combustion Engineering ECCS Evaluation Model). NRC approval for items 4, 5, and 9 methodologies.
- 18) Letter: O. D. Parr (NRC) to A.E. Scherer (CE), dated December 9, 1975 (NRC Staff Review of the Proposed Combustion Engineering ECCS Evaluation Model changes). NRC approval for item 6 methodology.
ANO-2 Cycle 31 COLR Revision 0 6
- 19) Letter: K.Kniel (NRC) to A. E. Scherer (CE), dated September 27, 1977 (Evaluation of Topical Reports CENPD-133, Supplement 3-P and CENPD-137, Supplement 1-P). NRC approval for item 10 methodology.
- 20) Letter: 2CNA038403, dated March 20, 1984, J.R. Miller (NRC) to J.M. Griffin (AP&L),
"CESEC Code Verification." NRC approval for item 12 methodology.
- 21) "CE 16 x 16 Next Generation Fuel Core Reference Report," WCAP-16500-P-A, Revision 0, August 2007 and Final Safety Evaluation for Westinghouse Electric Company (Westinghouse) Topical Report (TR) WCAP-16500-P, Revision 0, "CE [Combustion Engineering] 16 x 16 Next Generation [(NGF)] Core Reference Report," (Methodology for Specifications 3.1.1.4 for MTC, 3.2.1 for Linear Heat Rate, 3.2.3 for Azimuthal Power Tilt, 3.2.4.b, 3.2.4.c, and 3.2.4.d for DNBR Margin, and 3.2.7 for ASI)
WCAP-16500-P-A, Supplement 1, Revision 1, December 2010, (Methodology for Specifications 3.2.4.b, 3.2.4.c, and 3.2.4.d for DNBR Margin)
- 23) "Evolutionary Design Changes to CE 16X16 Next Generation Fuel and Method for Addressing the Effects of End-of-Life Properties on Seismic and Loss of Coolant Accident Analyses," WCAP-16500-P-A, Supplement 2, June 2016.
- 24) "Optimized ZIRLOTM," WCAP-12610-P-A and CENPD-404-P-A Addendum 1-A, July 2006 (Methodology for Specifications 3.1.1.4 for MTC, 3.2.1 for Linear Heat Rate, 3.2.3 for Azimuthal Tilt, and 3.2.7 for ASI)
- 25) "Westinghouse Correlations WSSV and WSSV-T for Predicting Critical Heat Flux in Rod Bundles with Side-Supported Mixing Vanes," WCAP-16523-P-A, Revision 0, August 2007, and Final Safety Evaluation for Westinghouse Electric Company (Westinghouse) Topical Report (TR), WCAP-16523-P, "Westinghouse Correlations WSSV and WSSV-T for Predicting Critical Heat Flux in Rod Bundles with Side-Supported Mixing Vanes,"
(Methodology for Specifications 3.2.4.b, 3.2.4.c, and 3.2.4.d for DNBR Margin)
- 26) "ABB Critical Heat Flux Correlations for PWR Fuel," CENPD-387-P-A Revision 0, May 2000 (Methodology for Specifications 3.2.4.b, 3.2.4.c, and 3.2.4.d for DNBR Margin and 3.2.7 for ASI)
ANO-2 Cycle 31 COLR Revision 0 7
V.
CORE OPERATING LIMITS The cycle-specific operating limits for the specifications listed are presented below.
- 1) 3/4.1.1.1 - SHUTDOWN MARGIN-Tavg > 200 °F The SHUTDOWN MARGIN shall be greater than or equal to 5.0% k/k in Modes 1, 2, 3, and
- 4.
NOTE: Above refers to required subcritical margin in terms of absolute value. Reactivity balance calculations that treat core excess reactivity as positive and boron reactivity as negative will satisfy the requirement when SHUTDOWN MARGIN is -5.0% k/k or more negative.
- 2) 3/4.1.1.2 - SHUTDOWN MARGIN - Tavg 200 °F The SHUTDOWN MARGIN shall be greater than or equal to 5.0% k/k in Mode 5.
NOTE: Above refers to required subcritical margin in terms of absolute value. Reactivity balance calculations that treat core excess reactivity as positive and boron reactivity as negative will satisfy the requirement when SHUTDOWN MARGIN is -5.0% k/k or more negative.
- 3) 3.1.1.4 - MODERATOR TEMPERATURE COEFFICIENT The Moderator Temperature Coefficient (MTC) shall be in accordance with Figure 1 except as follows. The upper COLR MTC limit line of Figure 1 applies from BOC to 140.0 EFPD.
From 380.0 EFPD to End of Cycle (EOC), the upper COLR MTC limit shall be linear between 0.0E-4 k/k/°F at 0% power and -1.0E-4 k/k/°F at 100% power. Between 140.0 EFPD and 380.0 EFPD, the upper MTC limit may be linearly interpolated with burnup between these two upper limits.
- 4) 3.1.3.1 - CEA POSITION With one or more CEAs trippable but misaligned from any other CEAs in its group by more than the Technical Specification 3.1.3.1 allowed value, the minimum required core power reduction for Modes 1 and 2 is specified in Figure 2.
- 5) 3.1.3.6 - REGULATING CEA INSERTION LIMITS The regulating CEA groups and Group P shall be limited to the withdrawal and insertion limits shown on Figure 3. Figure 3 assumes that Groups 1 through 5 are maintained at or above the Programmed Insertion Limit.
- 6) 3/4.2.1 - LINEAR HEAT RATE With COLSS out of service, the linear heat rate shall be maintained 13.7 kW/ft.
- 7) 3.2.3 - AZIMUTHAL POWER TILT-Tq The measured AZIMUTHAL POWER TILT shall be maintained 0.03.
ANO-2 Cycle 31 COLR Revision 0 8
a)
With COLSS in service and neither CEAC operable - Maintain COLSS calculated core power less than or equal to COLSS calculated core power operating limit based on DNBR decreased by 10%.
b)
With COLSS out of service and at least one CEAC operable - Operate within the Region of Acceptable Operation shown on Figure 4, using any operable CPC channel.
c)
With COLSS out of service and neither CEAC operable - Operate within the Region of Acceptable Operation shown on Figure 5, using any operable CPC channel.
- 9) 3.2.7 - AXIAL SHAPE INDEX The core average AXIAL SHAPE INDEX (ASI) shall be maintained within the following limits:
a)
COLSS IN SERVICE
- 0.27 ASI + 0.27 b)
- 0.20 ASI + 0.18 VI. LIST OF FIGURES Figure 1 Moderator Temperature Coefficient Figure 2 Required Power Reduction After Inward CEA Deviation Figure 3 CEA Insertion Limits Versus Thermal Power Figure 4 DNBR Margin Operating Limit Based on Core Protection Calculators (COLSS Out of Service, CEAC Operable)
Figure 5 DNBR Margin Operating Limit Based on Core Protection Calculators (COLSS Out of Service, Both CEACs Inoperable)
ANO-2 Cycle 31 COLR Revision 0 9
FIGURE 1 Note:
Per Technical Specification 3.1.1.4.a. and b., the Moderator Temperature Coefficient (MTC) maximum upper design limit shall be less positive than +0.5 x 10-4 k/k/°F whenever THERMAL POWER is 70% of RATED THERMAL POWER and less positive than 0.0 x 10-4 k/k/°F whenever THERMAL POWER is > 70% of RATED THERMAL POWER. Therefore, the actual MTC must be less than the COLR upper limit at zero power. At all other powers, the actual MTC may be equal to the COLR upper limit.
Moderator Temperature Coefficient
-3.80 E-04
-4.00E-04
-3.50E-04
-3.00E-04
-2.50E-04
-2.00E-04
-1.50E-04
-1.00E-04
-5.00E-05 0.00E+00 5.00E-05 0
10 20 30 40 50 60 70 80 90 100 Core Power (% of Rated Thermal Power)
MTC (Delta K/K/Degree F)
Acceptable Operating Region Unacceptable Operating Region (0, 0.50)
(20, 0.32)
(60, 0.00)
(100, -0.20)
(50, 0.05)
Unacceptable Operating Region
ANO-2 Cycle 31 COLR Revision 0 10 FIGURE 2 REQUIRED POWER REDUCTION AFTER INWARD CEA DEVIATION*
- When core power is reduced to 60% of rated power per this limit curve, further reduction is not required 0
5 10 15 20 25 30 0
15 30 45 60 75 90 105 120 Time After Deviation (minutes)
Minimum Required Power Reduction (% of Rated Power)
(28% @ 120 min.)
ANO-2 Cycle 31 COLR Revision 0 11 FIGURE 3 CEA INSERTION LIMITS VERSUS THERMAL POWER Note: Regulating Groups 1 through 5 at or above Programmed Insertion Limit SHUTDOWN MARGIN NOT SATISFIED (62.5, 0)
(82.5, 60)
(100, 112.5)
Short Term Steady State Actions Apply Long Term Steady State Actions Apply Short Term Steady State Actions Apply Long Term Steady State Actions Apply SHUTDOWN MARGIN NOT SATISFIED SHUTDOWN MARGIN NOT SATISFIED Transient Insertion Limit Transient Insertion Limit GROUP 6 PDIL GROUP P PDIL (74, 135)
(65, 112.5)
(44, 60)
(20, 0)
Power (%)
Power (%)
Group P CEA Position, Inches Withdrawn Group 6 CEA Position, Inches Withdrawn 150 135 120 105 90 75 60 45 30 15 0
150 135 120 105 90 75 60 45 30 15 0
0 10 20 30 40 50 60 70 80 90 100 0
10 20 30 40 50 60 70 80 90 100
ANO-2 Cycle 31 COLR Revision 0 12 FIGURE 4 DNBR MARGIN OPERATING LIMIT BASED ON CORE PROTECTION CALCULATORS ANO-2 Cycle Independent COLSS OOS Limit Lines Minimum One CEAC Operable NOTE: DNBR greater than that indicated at the top of the figure is acceptable, provided the indicated ASI limits remain between the bounds that are shown for lower DNBR.
3.4 3.3 3.2 3.1 3.0 2.9 2.8 2.7 2.6 2.5 2.4 2.3 2.2 2.1 2.0 1.9 1.8 1.7 1.6 CPC Indicated Core Average ASI (CPC Point ID 268)
-0.3
-0.2
-0.1 0.0 0.1 0.2 0.3 UNACCEPTABLE OPERATION Any Power Level ACCEPTABLE OPERATION Power at or above 90%
ACCEPTABLE OPERATION Power at or above 80%
(-0.20, 2.01)
(-0.20, 2.25)
(-0.20, 2.49)
(0.18, 2.17)
(0.18, 2.46)
(0.18, 2.72)
(0.06, 2.17)
(0.06, 2.46)
ACCEPTABLE OPERATION Any Power Level CPC-Calculated DNBR (CPC Point ID 169 or 406)
(0.02, 2.72)
ANO-2 Cycle 31 COLR Revision 0 13 FIGURE 5 DNBR MARGIN OPERATING LIMIT BASED ON CORE PROTECTION CALCULATORS ANO-2 Cycle Independent COLSS OOS Limit Both CEACs Inoperable NOTE: DNBR greater than that indicated at the top of the figure is acceptable, provided the indicated ASI limits remain between the bounds that are shown for lower DNBR.
-0.3
-0.2
-0.1 0.0 0.1 0.2 0.3 4.2 4.1 4.0 3.9 3.8 3.7 3.6 3.5 3.4 3.3 3.2 3.1 3.0 CPC-Calculated DNBR (CPC Point ID 169 or 406)
CPC Indicated Core Average ASI (CPC Point ID 268)
UNACCEPTABLE OPERATION Any Power Level
(-0.20, 3.05)
(0.18, 3.31)
(0.00, 3.31)
ACCEPTABLE OPERATION Any Power Level