1CAN031303, Unit 1, Generic Letter 2004-02 Refueling Outage Information Follow-up

From kanterella
(Redirected from 1CAN031303)
Jump to navigation Jump to search
Unit 1, Generic Letter 2004-02 Refueling Outage Information Follow-up
ML13080A347
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/20/2013
From: Jeremy G. Browning
Entergy Operations
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
1CAN031303, GL-04-002
Download: ML13080A347 (4)


Text

Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802 Tel 479-858-3110 Jeremy G. Browning Vice President, Operations Arkansas Nuclear One 1CAN031303 March 20, 2013 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Generic Letter 2004-02 Refueling Outage Information Follow-up Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51

REFERENCE:

Entergy letter to NRC, Generic Letter (GL) 2004-02 Refueling Outage Information, dated December 21, 2011 (1CAN121101)

(ML120040124)

Dear Sir or Madam:

In accordance with the above reference Entergy Operations, Inc. (Entergy) committed to inform the NRC of the final plans for disposition of the fibrous insulation that was discovered between the Arkansas Nuclear One, Unit 1 (ANO-1) pressurizer and its restraint/support beams by March 24, 2013. Entergy plans to remove the insulation during the upcoming ANO-1 refueling outage (1R24); if conditions do not support complete removal, then Entergy will document the acceptability of the as-left condition.

This letter contains a new regulatory commitment, which is identified in the attachment.

Should you have any questions concerning this submittal, please contact Stephenie Pyle at 479.858.4704.

I declare under penalty of perjury that the foregoing is true and correct. Executed on March 20, 2013.

Sincerely, Original signed by Jeremy G. Browning JGB/nbm

Attachment:

List of Regulatory Commitments

1CAN031303 Page 2 of 2 cc: Mr. Elmo E. Collins Regional Administrator U. S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Kaly Kalyanam MS O-8 B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852

Attachment to 1CAN031303 List of Regulatory Commitments to 1CAN031303 Page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document.

Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.

TYPE SCHEDULED (Check One) COMPLETION COMMITMENT DATE ONE-TIME CONTINUING (If Required)

ACTION COMPLIANCE Entergy plans to remove the insulation; if X 1R24 Spring 2013 conditions do not support complete removal, then Entergy will document the acceptability of the as-left condition.