05000456/LER-2010-003
Jump to navigation
Jump to search
Braidwood Station | |
Event date: | 09-15-2010 |
---|---|
Report date: | 11-15-2010 |
Reporting criterion: | 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |
4562010003R00 - NRC Website | |
A. Plant Operating Conditions Before The Event:
Event Date: September 15, 2010� Event Time: 0758 CDT Unit: 1 MODE: 1� Reactor Power: 100 percent Unit 1 Reactor Coolant System (RC) [AB]:� Norma