| Q | CCA | Title |
---|
05000454/FIN-2014004-01 | 2014Q3 | H.7 | Inadequate Evacuation Time Estimate Submittals |
05000454/FIN-2014005-01 | 2014Q4 | H.8 | failure to Measure Interpass Temperature |
05000454/FIN-2014005-02 | 2014Q4 | H.3 | Liquid Penetrant Testing Procedure Did Not Meet ASME Code |
05000454/FIN-2014005-03 | 2014Q4 | H.7 | Welding Procedure Specification Variables Changed Without Revision or Amendment Contrary to ASME Code |
05000455/FIN-2014005-04 | 2014Q4 | H.14 | Failure to Evaluate Operability of a TS SSC Upon Discovery of a Support System Degraded Condition |
05000455/FIN-2014005-05 | 2014Q4 | H.5 | Containment Penetration Isolation Valves Rendered Inoperable for Operational Convenience |
05000455/FIN-2015001-01 | 2015Q1 | P.2 | Failure to Provide Work Instructions that Appropriately Address Foreign Material Exclusion from Safeguards Relays |
05000454/FIN-2015001-02 | 2015Q1 | | Failure to Report Loss of Emergency Assessment Capability Following Seismic Monitoring System Failure |
05000454/FIN-2015403-01 | 2015Q2 | | Security |