05000440/FIN-2009004-04 | 2009Q3 | H.7 | Moister Separator Reheater Level Switch Maintenance Caused Unit Trip |
05000440/FIN-2009004-03 | 2009Q3 | H.5 | Unexpected Half SCRAM Due to Faulty Troubleshooting Plan |
05000440/FIN-2009004-02 | 2009Q3 | H.4 H.5 | Maintenance Errors Cause Loss of Division I ECCS Electical Powers |
05000440/FIN-2009004-01 | 2009Q3 | H.14 | Failure to Perform an Adequate POST-MAINTENANCE Test Following Installation of New Emergency Diesel Generators Carbon Dioxide System Control Panels |
05000440/FIN-2009005-04 | 2009Q4 | H.5 | Excess Dose Incurred for the Alternate Decay Heat Removal Project |
05000440/FIN-2009005-02 | 2009Q4 | H.11 H.12 | Unposted High Radiation Area at the TIP Machines |
05000440/FIN-2009005-01 | 2009Q4 | H.11 H.12 | Failure to Adhere to Maintenance Instructions Resulted in Loss of Recirculation Pump \'A\' |
05000440/FIN-2010001-01 | 2010Q1 | H.2 | Failure to Perform Adequate Evaluation of Crane Support Structure Elements |
05000440/FIN-2010002-02 | 2010Q1 | P.5 P.2(b) | Failure to Make an Accurate Immediate Operability Determination |
05000440/FIN-2010002-01 | 2010Q1 | H.14 | Failure to Correctly Assess Risk During Post-Maintenance Activities |
05000440/FIN-2010003-02 | 2010Q2 | H.8 | Failure To Work In High Radiation Areas Within The Bounds Of The Radiological Briefing Resulting In Entry Into Areas Without Knowledge Of The Radiological Conditions |
05000440/FIN-2010003-01 | 2010Q2 | H.5 | Failure to Adequately Establish the Radiological Conditions In A Locked High Radiation Area to Allow Workers to Be Properly Briefed Prior to Entry |
05000440/FIN-2010003-05 | 2010Q2 | H.5 | Failure To Effectively Use The Intended Radiological Engineering Controls During Cavity Drain-Down In Preparation For Its Decontamination |
05000440/FIN-2010003-04 | 2010Q2 | H.7 | Failure To Evaluate The Need For Radiological Engineering Measures To Control Contamination During Installation Of A Cover Over The Drywell Head |
05000440/FIN-2010003-03 | 2010Q2 | H.5 | Inadequate ALARA Planning And Radiological Controls That Did Not Prevent Unplanned, Unintended Dose For Several Work Activities In Refuel Outage 12 |
05000440/FIN-2010402-01 | 2010Q2 | | Security |
05000440/FIN-2010003-06 | 2010Q2 | | Failure to Perform a Hydrostatic Test in Accordance with ASME Code |