05000424/FIN-2017003-04
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Licensee-Identified Violation |
Description | 10 CFR 50, Appendix B, Criterion XI, Test Control stated, in part, that test programs shall be established to assure that all testing required to demonstrate that structures, systems and components will perform satisfactorily in service. UFSAR Section 8.1.4.3.C.2 stated that the onsite electrical system was designed in accordance with IEEE 308 -1974, Criteria for Class 1E Power System at Nuclear Generating Stations. IEEE 308 -1974 Section 6.3 recommended periodic tests be performed at scheduled intervals to detect deterioration of equipment to demonstrate operability of the components that are not exercised during normal operation. Contrary to the above, the licensee did not establish adequate test control measures to assure that the protective function of all 1E lockout relays were periodically verified. Specifically, there was no preventative maintenance to test the 1E lockout relays for non- MSPI loads. This condition has existed since plant initial operation and was identified during a licensee Nuclear Oversight audit on July 13, 2017. The inspectors determined this finding was of very low safety significance (Green) because the inspectors found no documented history of in- service failures of 1E lockout relays rendering safety -related equipment inoperative. This issue was documented in the licensees corrective action program as CR 10381797. |
Site: | Vogtle |
---|---|
Report | IR 05000424/2017003 Section 4OA7 |
Date counted | Sep 30, 2017 (2017Q3) |
Type: | NCV: Green |
cornerstone | Initiating Events |
Identified by: | Licensee-identified |
Inspection Procedure: | |
Inspectors (proximate) | M Endress A Alen D Retterer R Williams S Downey B Collins W Pursley A Nielsen S Sandal |
Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion XI |
INPO aspect | |
' | |
Finding - Vogtle - IR 05000424/2017003 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Vogtle) @ 2017Q3