05000416/LER-2017-002

From kanterella
Jump to navigation Jump to search
LER-2017-002, Loss of Secondary Containment and Inoperability of the Standby Gas Treatment Systems as a result of a damages power supply.
Grand Gulf Nuclear Station, Unit 1
Event date: 2-28-2017
Report date: 10-03-2017
Reporting criterion: 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications

10 CFR 50.73(a)(2)(v)(C), Loss of Safety Function - Release of Radioactive Material
4162017002R01 - NRC Website