05000413/FIN-2013405-03
Jump to navigation
Jump to search
Site: | Catawba |
---|---|
Report | IR 05000413/2013405 Section 4OA5 |
Date counted | Mar 31, 2013 (2013Q1) |
Type: | Violation: Green |
cornerstone | Physical Protection |
Identified by: | NRC identified |
Inspection Procedure: | IP 2201/004 |
Violation of: | 10 CFR 73, PHYSICAL PROTECTION OF PLANTS AND MATERIALS |
INPO aspect | |
' | |