| Q | CCA | Title |
---|
05000395/FIN-2017003-02 | 2017Q3 | | Violation of NRC Examination Security as Required by 10 CFR 55.49 |
05000395/FIN-2017003-03 | 2017Q3 | H.5 | Failure to Adequately Assess the Risk for an Activity with Consequent Loss of Core Cooling |
05000395/FIN-2017003-01 | 2017Q3 | H.1 | Inadequate Procedures for Inspection of Fire Barriers |
05000395/FIN-2017004-01 | 2017Q4 | H.1 H.1(e) | Failure to Accomplish Station Procedures for Severe Weather |
05000395/FIN-2017004-02 | 2017Q4 | P.3 | Failure to Implement Corrective Actions to Restore Compliance for Previous NRC-identified Green NCV 05000395/2005007-01 |
05000395/FIN-2017004-03 | 2017Q4 | P.2 | Failure of an Emergency Feedwater Auto Start Actuation Signal |
05000395/FIN-2017007-03 | 2017Q4 | | Failure to Identify a CAQ for Power Shield Catalog #609903-T501N |
05000395/FIN-2017007-02 | 2017Q4 | | Failure to Establish a Testing Program for Inverter XIT5904 and Time Delay Relay in the EFW/SW Crosstie Valve Actuation Circuitry |
05000395/FIN-2017007-01 | 2017Q4 | | Failure to Verify the Adequacy of Design for the EFW system when Supplied by SW |
05000395/FIN-2018010-01 | 2018Q1 | | Failure to Justify Activation Energy for Valcor SOV XVX06050A |
05000395/FIN-2018010-02 | 2018Q1 | | Failure to Verify the Seismic Qualification of Valcor Solenoid Operated Valve XVX06050A |
05000395/FIN-2018010-03 | 2018Q1 | | Inadequate Radiation Harsh Environmental Qualification of Reactor Building Spray Pump A |
05000395/FIN-2018010-04 | 2018Q1 | | Unjustified Qualified Life for ASCO Valves |
05000395/FIN-2018010-05 | 2018Q1 | | Potential High Radiation Dose Areas with Unqualified Components |
05000395/FIN-2018010-06 | 2018Q1 | | Potential Unjustified Activation Energy for Barton Transmitters |
05000395/FIN-2018001-01 | 2018Q1 | | Failure to Perform an Adequate Risk Assessment With Consequent Reactor Trip |
05000395/FIN-2018411-01 | 2018Q2 | H.13 | Security |