| Q | CCA | Title |
---|
05000354/FIN-2012004-01 | 2012Q3 | | Operation with the Potential to Drain the Reactor Vesse |
05000354/FIN-2012005-01 | 2012Q4 | P.3 | Failure to Follow Procedures to Ensure Cables Within the Scope of the Cable Monitoring Program Do Not Remain Submerged |
05000354/FIN-2013002-01 | 2013Q1 | H.8 | A Technical Specification Surveillance Procedure for Remote Shutdown Panel Instrumentation was Inadequately Implemented |
05000354/FIN-2013007-01 | 2013Q1 | H.5 | Failure to Conduct Maintenance on the CR HVAC System in Accordance with the Procedure |
05000354/FIN-2013007-02 | 2013Q1 | | Failure to Take Timely Corrective Action for an Identified Design Deficiency with the CR HVAC System |
05000354/FIN-2013008-01 | 2013Q1 | H.7 | Inadequate Post-Fire Safe Shutdown Procedures |