| | Q | CCA | Title |
|---|
| 05000364/FIN-2017003-01 | 2017Q3 | H.14 | Failure to perform adequate corrective maintenance on the 2B EDG |
| 05000348/FIN-2017009-01 | 2017Q4 | | Failure to Report a Condition Which was Prohibited by Technical Specifications |
| 05000364/FIN-2017004-01 | 2017Q4 | P.2 | Failure to Evaluate Impacts on the 2C RCP Oil Collection System |
| 05000364/FIN-2017004-02 | 2017Q4 | H.6 | Failure to maintainan operable Oil Collection System on RCP 2B |
| 05000348/FIN-2017004-03 | 2017Q4 | H.12 | Failure to Follow Procedure Resulted in Inoperable TDAFW pump |
| 05000348/FIN-2017009-02 | 2017Q4 | H.8 | Failure to Complete Corrective Action to Preclude Repetition of a Significant Conditions Adverse to Quality |
| 05000364/FIN-2018001-03 | 2018Q1 | | Enforcement Action (EA)-18-026:Unit 2 Pressurizer Safety Valve Lift Pressure Outside of Technical Specification Tolerance Band |
| 05000364/FIN-2018001-02 | 2018Q1 | | Enforcement Action (EA)-18-025:Unit 2 Main Steam Safety Valve (MSSV) Lift Pressure Outside of Technical Specification Limits |
| 05000364/FIN-2018001-01 | 2018Q1 | | Failure to conduct an In-Service Testing (IST)surveillance on the 2B charging pump discharge check valve |
| 05000348/FIN-2018002-01 | 2018Q2 | H.1 | High vibrations on the 1B Charging pump |
| 05000348/FIN-2018002-02 | 2018Q2 | P.3 | Failure to develop adequate PM for diesel generator relays |
| 05000348/FIN-2018002-05 | 2018Q2 | H.1 | Failure of a Main Steam Isolation Valve on the C Steam Line |
| 05000348/FIN-2018002-03 | 2018Q2 | H.1 | Failure to Calibrate Portable Radiation Survey Instruments |
| 05000348/FIN-2018002-04 | 2018Q2 | H.10 | Failure to implement timely corrective actions for charging pump discharge check valves |
| 05000348/FIN-2018013-01 | 2018Q2 | H.5 | Interference with the operation of a respirator |
| 05000348/FIN-2018014-01 | 2018Q2 | | Failure to Complete System Operator Rounds as Required per Procedures |
| 05000348/FIN-2018014-02 | 2018Q2 | | Failure to Provide Complete and Accurate Information Related to System Operator Rounds |