05000348/FIN-2013009-01 | 2012Q1 | | Deliberate Failure to Conduct Fire Watches |
05000348/FIN-2012003-01 | 2012Q2 | P.2(b) | Failure to Perform ISI General Visual Examinations of Containment Moisture Barrier Associated with Containment Liner Leak Chase Test Connection Threaded Pipe Plugs |
05000348/FIN-2012003-02 | 2012Q2 | | Failure to Implement Design Control Measures to Verify the Adequacy of CST Design |
05000348/FIN-2012003-03 | 2012Q2 | H.1 H.2(d) | Failure to Monitor for Auxiliary Building Airborne Radioactivity Levels as Described in the FSAR |
05000348/FIN-2012003-04 | 2012Q2 | H.5 | Inadvertent transfer of approximately 5000 gallons of borated water from the RWST to the RCS refueling cavity and spent fuel pool |
05000348/FIN-2012403-01 | 2012Q2 | H.8 | Security |
05000348/FIN-2012403-02 | 2012Q2 | H.1 | Security |
05000348/FIN-2012004-01 | 2012Q3 | H.7 | Damaged Wiring and Resistors in the Static Exciter and Voltage Regulator Circuit of 1C EDG |
05000348/FIN-2012004-02 | 2012Q3 | H.7 | Loss of Shutdown Cooling due to an Unplanned Loss of Train A 4160v Safety Related Switchgear |
05000348/FIN-2012004-03 | 2012Q3 | | LER 05000348/2012-0015-00 Unit Shutdown Required by Technical Specification 3.8.1 |
05000348/FIN-2012406-01 | 2012Q4 | H.8 | Security |