Finding | |
---|---|
Title | Failure to Satisfy 10 CFR 50.73 Reporting Requirements for Primary Containment Isolation Valve Actuations |
Description | The inspectors identified a Severity Level IV NCV of the NRCs reporting requirements Title 10 of the Code of Federal Regulations (CFR), Part50.73(a)(1), Licensee Event Report [LER] System. The licensee failed to submit a required LER or provide a telephone notification within 60 days after discovery on March 24, 2017, of a condition that resulted in the invalid actuation of containment isolation signals affecting containment isolation valves in more than one system. The licensee entered this issue into its corrective action program to evaluate the cause for its failure to satisfy the reporting requirements and to identify appropriate corrective actions.Subsequently, the licensee made a telephone notification on July 14, 2017 to the NRC Operations Center via the Emergency Notification System to report the event (Event Notice 52859).Consistent with the guidance in IMC 0612, Power Reactor Inspection Reports, Appendix B, Issue Screening, dated September 7, 2012, the inspectors determined the performance deficiency was of minor significance based on No answers to the more-than-minor screening questions. In accordance with Section 6.9.d.9 of the NRC Enforcement Policy, this violation was categorized as Severity Level IV because the licensee failed to report as required by 10 CFR 50.73(a)(1). No cross-cutting aspect is associated with this traditional enforcement violation because the associated performance deficiency was determined to be of minor significance and therefore not a finding. |
Site: | Fermi |
---|---|
Report | IR 05000341/2017003 Section 1R15 |
Date counted | Sep 30, 2017 (2017Q3) |
Type: | TEV: Severity level IV |
cornerstone | Other |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.15 |
Inspectors (proximate) | J Nance B Kemker P Smagacz B Dickson |
Violation of: | 10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation |
INPO aspect | |
' | |
Finding - Fermi - IR 05000341/2017003 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Fermi) @ 2017Q3