/01P-0:between 810601 & 0705,two Open Unattended Fire Doors Were Found in Primary Auxiliary Bldg.Caused by Defective Maint Work Procedure Used by Const Dept.Procedure Will Be Revised & Const Personnel Informed of Revision
ML20010C696
Person / Time
Site: Beaver Valley
Issue date: 08/11/1981
From: Williams H
DUQUESNE LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
LER-81-068-01P, LER-81-68-1P, NUDOCS 8108200322
Download: ML20010C696 (3)


LER-1981-068, /01P-0:between 810601 & 0705,two Open Unattended Fire Doors Were Found in Primary Auxiliary Bldg.Caused by Defective Maint Work Procedure Used by Const Dept.Procedure Will Be Revised & Const Personnel Informed of Revision
Event date:
Report date:
3341981068R01 - NRC Website

text

..

.,j,. Se t,

Q 14 9 12) 456-6000.

=.:=-

m, DUQUESNE LIGHT COMPANY Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077 August 11, 1981 i5VPS:HPW:362 Beaver Valley Power' Station, Unit No. 1 Q

Docket No. 50-334, License No. DPR-66 Si i

LER 81-68/01P

/'

gp

' /gg S

0Q y

5 Au u

cy BOT A Q

% u.s, gN fa[ @ rcer Mr. B. H. Grier, Director Q

'/

Uniteu States Nuclear Regulatory Commission Region 1 Q

631 Park Avanue

/h King of Prussia, PA ~ 19406

'b l F

Dear Mr. Grier:

In accordance with Appendix A, Beaver Valley Technical Spacifications, Licensee Event Report LER 81-68/0lP, Technical Specification 6.9.1.8.1 and 3.7.15, is submitted. These occurrences are being reported late due to an oversight in the reporting requirements. The problems were found during the course of the normal daily inspection activities of the Beaver Valley Resident Inspectors, Mr. D. A. Becknan and Mr. J. A. Hegner.

NRC Inspection Report 81-15 notes that in the inspection period between 6,1/81 and 7/5/81, two open and unattended fire doors were found in the primary auxiliary building. In both instances following notification, fire watches were posted and door repairs made in accordance with the action statement requiremente of Technical Specification 3.7.15.

NRC Inspection Report 81-18 notes that in the inspection period between 7/5/81 and 8/2/81, e single conduit fire barrier penetration between the'AE and DF switchgear rooms was found unpacked and unattended.

Imrediate corrective actions'taken involved the temporary repackJng of the barrier with an approved fire retardant material.

As a result of these findings, a review cf the construction department.

procedures which involve fire barriers wac made by the Senior Safety Engineer.

TS9 s

~

//

,'8108200322'810011 a PDR ADOCK 05000334

- 0.

PDR t

t y

g e

g p~-

y

+

e e,.-p. ;.

y v.< -;

s, Mr. B. H2 Grier
August-11, 1981

'BVPS:HPW:362 i

Page 2-

. Based on this review, the maintenance work procedure used by the construction' department for. the,or'aning of fire barriers will'be. revised.

The. revision will include a preca. lon step'in the procedure;to address j

the requirements'of-Technical Specification 3.7.15.

A safety meeting with si

- construction personnel will be held to inform them of this ' change to their -

procedure.

Ve truly yours',

P Y

H..P. Williams

. Superintendent HPW:ba e

T e

4 a.

I

+

4 6

1 t

4

ca?,

Mr. B. H. Crier August 11, 1981:

BVPS:HPW:362 Page 3 cc: Director Of Management & Program Analysis United States Nuclear Regulatory Commission

.h Washington, D. C.

20555 J..Hultz, Ohio Edison

- Director, Office of Inspection and Enforcement Headquarters United State.s Nuclear Regulatory Commission Washington, D. C.

20555 D. A. Chaney, BVPS. Licensing Project Manager.

United States Nuclear Regulatory-Commission Washington, D. C.

20555 D. A. Beckman, Nuclear Regulatory Commission, BVPS Site Inspector Mr. Alex Timme, CAPCO Nuclear Projects Coordinator, Toledo Edison NucJr Safety Analysis Center, Palo Alto, California G. E. Muckle,_ Factory Mutual Engineering, Pittsburgh j

Ot Alford, Stone & Webster / Boston Mr. John Alford, PA Public Utilities Commission, Harrisburd, PA i

4 i

+

.A