| Q | CCA | Title |
---|
05000331/FIN-2015004-04 | 2015Q4 | P.5 | Failure to Follow Temporary Configuration Control Procedure |
05000331/FIN-2015004-01 | 2015Q4 | | Failure to Scope Safety Related and Nonsafety Related Breaker Into the Maintenance Rule |
05000331/FIN-2015004-02 | 2015Q4 | H.14 | Failure to Declare High Pressure Coolant Injection and Reactor Core Isolation Cooling Inoperable when the High Pressure Coolant Injection and Reactor Core Isolation Cooling Pump Suction Swap Logic was Inoperable |
05000331/FIN-2015004-03 | 2015Q4 | | Failure to Satisfy 10 CFR Part 50.73 Reporting Requirements for a Condition Prohibited by Technical Specifications and for a Condition that Could Have Prevented Fulfillment of a Safety Function |
05000331/FIN-2016007-01 | 2016Q1 | | Failure to Document Reviews Performed in 50.59 Screen for New Abnormal Operating Procedure |
05000331/FIN-2016007-02 | 2016Q1 | | Failure to Document 50.59 Evaluation for UFSAR Change Concerning Radiological Dose Consequence Analysis Methodology |
05000331/FIN-2016002-01 | 2016Q2 | H.12 | Failure to Accomplish a Surveillance Test Procedure in Accordance with Instructions Resulting in Safety System Inoperability |