No findings of significance were identified. However, a
URI was identified during the inspectors review of a
CAP record that described a radiological contamination of a contractor on February 6, 2009. This item will be resolved pending review by the NRC. During the inspectors review of a corrective action program record (
CAP #0063690) that described a positive facial and internal contamination of a contractor who had performed decontamination of the
reactor pressure vessel (
RPV) studs and washers on the refuel floor, it was noted that the individual deviated from the instructions provided by radiation protection staff concerning the method that was to be used to decontaminate the above items. The licensees management instructed the contractor on the importance of refuel floor personnel to adhere to the specific refuel floor procedure and
RWP requirements. The refuel floor procedure and the
RWP requirements stated that radiation protection staff must be notified and agree upon any deviation from the job scope prior to continuing with the evolution. The licensees initial review of the incident appeared to indicate that the work instructions had been clearly provided to the worker. Based on the information provided by the licensee and additional information obtained during the inspection, this issue remains under review by the NRC and is categorized as a
URI, (
URI 05000331/2009002-01)