| Q | CCA | Title |
---|
05000327/FIN-2015001-01 | 2015Q1 | H.12 | Failure to Follow Procedure Results in an Inadvertent Sprinkler Deluge in the Cable Spreading Room |
05000328/FIN-2015002-01 | 2015Q2 | | Failure to Adequately Follow Foreign Material Control Procedures |
05000327/FIN-2015002-02 | 2015Q2 | | Spilled Specimen Capsule |
05000327/FIN-2015404-01 | 2015Q3 | | Security |
05000327/FIN-2015404-02 | 2015Q3 | | Security |
05000327/FIN-2015404-03 | 2015Q3 | | Security |
05000327/FIN-2015404-04 | 2015Q3 | | Security |
05000327/FIN-2015404-05 | 2015Q3 | | Security |
05000327/FIN-2015007-01 | 2015Q3 | P.3 | Failure to maintain control of and update safety related design out documents (electrical calculations |
05000327/FIN-2015007-02 | 2015Q3 | H.14 | Failure to meet Design Basis Requirements to have Interlocks between Shared systems |
05000327/FIN-2015007-03 | 2015Q3 | | Failure to request a licensee amendment prior to removing interlocks from shared onsite emergency and shutdown AC electric systems |
05000327/FIN-2015007-04 | 2015Q3 | H.3 | Failure to identify and correct inadequate procurement evaluation processes |
05000327/FIN-2015007-05 | 2015Q3 | H.3 | Failure to Identify Qualification Criteria Associated with Class 1E Electrical Component Static Performance Characteristics |
05000327/FIN-2015003-01 | 2015Q3 | H.1 | Inadequate Clearance Causes damage to A train SSPS |
05000327/FIN-2015003-02 | 2015Q3 | H.13 | Failure to Implement Work Risk Activity and Oversight of Supplemental Personnel Procedures |