05000317/FIN-2012002-02
From kanterella
Jump to navigation
Jump to search
Finding | |
|---|---|
| Title | Failure to Replace Batter Charger Circuit Board within Its Recommended Service Life |
| Description | A self-revealing NCV of Technical Specification (TS) 5.4.1, Procedures, was identified for the failure of Constellation to establish, implement, and maintain preventive maintenance (PM) requirements associated with the safety related No. 16 battery charger. Specifically, Constellation did not establish and implement a PM program to replace the current sensing/limiting printed circuit board (PCB) within its 10-year service life. As a consequence, the No. 16 battery charger failed rendering the 1A emergency diesel generator (EDG) inoperable. Constellations immediate corrective actions included entering this issue into their CAP, performing an apparent cause evaluation, performing an extent of condition review, and replacing the No. 16 battery charger PCBs. The finding is more than minor because it is associated with the equipment performance attribute of the Mitigating Systems cornerstone and affected the cornerstone objective to ensure the availability, reliability, and capacity of systems that respond to initiating events to prevent undesirable consequences. Specifically, the failure of the No. 16 battery charger led to the 1A EDG being declared inoperable. The inspectors determined that the finding is of very low safety significance because the performance deficiency was not a design or qualification deficiency, did not involve an actual loss of safety function, did not represent actual loss of safety function of a single train for greater than its TS allowed outage time, and did not screen as potentially risk significant due to a seismic, flooding, or severe weather initiating event. The finding has a cross-cutting aspect in the area of human performance, resources, because Constellation did not ensure that personnel, equipment, procedures, and other resources were available and adequate to assure nuclear safety. Specifically, Constellation did not maintain complete, accurate, and up-to-date procedures associated with the PM program |
| Site: | Calvert Cliffs |
|---|---|
| Report | IR 05000317/2012002 Section 4OA3 |
| Date counted | Mar 31, 2012 (2012Q1) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | Self-revealing |
| Inspection Procedure: | IP 71153 |
| Inspectors (proximate) | S Pindale E Gray G Dentel T Burns S Kennedy R Rolph E Torres K Cronk |
| CCA | H.7, Documentation |
| INPO aspect | WP.3 |
| ' | |
Finding - Calvert Cliffs - IR 05000317/2012002 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Calvert Cliffs) @ 2012Q1
| |||||||||||||||||||||||||||||||||||||||||||||||||||||