| Q | CCA | Title |
---|
05000315/FIN-2016001-01 | 2016Q1 | H.14 | Incorrect Auxiliary Feedwater Mission Time |
05000315/FIN-2016002-01 | 2016Q2 | H.5 | Unanalyzed Scaffold Near Safety-Related Equipment |
05000315/FIN-2016002-02 | 2016Q2 | H.1 | Containment Closure Requirements during Unit 1 2016 Refueling Outage |
05000315/FIN-2016002-03 | 2016Q2 | H.3 | Procedure Failed to Establish Two Valve Isolation Between the Reactor Coolants System And Containment Atmosphere |
05000315/FIN-2016009-01 | 2016Q3 | | Inadequate Resolution for Double-Break Circuits Design for Several Valves |
05000315/FIN-2016003-01 | 2016Q3 | H.11 | Improper Backfill Severs Fire Main |
05000315/FIN-2016003-02 | 2016Q3 | | Charging System Thru-Wall Leak |
05000316/FIN-2016003-03 | 2016Q3 | H.7 | Wetting of Safety-Related Battery Charger |
05000315/FIN-2016407-01 | 2016Q3 | P.2 | Security |
05000315/FIN-2016406-01 | 2016Q4 | | Security |
05000316/FIN-2016004-01 | 2016Q4 | H.9 | Designated Individual not at Airlock |
05000316/FIN-2016004-02 | 2016Q4 | H.12 | Moisture Separator Reheater Rupture |
05000315/FIN-2016201-01 | 2016Q4 | H.8 | Security |
05000315/FIN-2016201-02 | 2016Q4 | | Security |