| | Q | CCA | Title |
|---|
| 05000293/FIN-2011005-01 | 2011Q4 | | Licensed Operators Stood Watch Without Being Medically Qualified |
| 05000293/FIN-2011005-02 | 2011Q4 | | Entergy did not Provide Complete and Accurate Medical Information for Licensed Operator Renewal Applications |
| 05000293/FIN-2011005-03 | 2011Q4 | | Entergy did not Notify the NRC within 30 days of discovering changes in Medical Conditions |
| 05000293/FIN-2011005-04 | 2011Q4 | | Entergy Incorrectly Credited Operators Proficiency Watch-Standing Experience and the Operators subsequently stood watch |
| 05000293/FIN-2011005-05 | 2011Q4 | | Written NRC Biennial Written Examinations did not meet Qualitative Standards |
| 05000293/FIN-2011007-01 | 2011Q4 | | Inadequate Evaluation of the Adequacy of the 4160 Volt Emergency Bus 95% Voltage Alarm and Load Shed Relay Design |
| 05000293/FIN-2011007-02 | 2011Q4 | H.7 | Inadequate Test Control of Safety Related Batteries |
| 05000293/FIN-2011007-03 | 2011Q4 | | Inadequate Evaluation of the Affect of Non Class I Equipment Internal Flooding on Redundant Safety Related Equipment |
| 05000293/FIN-2011405-01 | 2011Q4 | P.5 | Security |
| 05000293/FIN-2012003-01 | 2012Q2 | | Failure to Verify the Adequacy of the Design of MCC-B18 with Respect to Internal Flooding |
| 05000293/FIN-2013003-01 | 2012Q2 | | Failure to Follow Procedures Results in Loss of Shutdown Cooling |
| 05000293/FIN-2012004-01 | 2012Q3 | H.5 | Inadequate Processing of Work Package Results in Reactor Scram |
| 05000293/FIN-2012403-01 | 2012Q3 | H.6 | Security |
| 05000293/FIN-2012403-02 | 2012Q3 | H.14 | Security |
| 05000293/FIN-2012403-03 | 2012Q3 | | Security |