| Q | CCA | Title |
---|
05000280/FIN-2012002-02 | 2012Q1 | H.7 | Failure to Maintain a Standard Emergency Action Level Scheme for Earthquakes |
05000280/FIN-2012007-01 | 2012Q1 | | Failure to Provide Preventive or Corrective Maintenance Operations for the RCS Standpipe Resulted in TS 6.4.A.7 Violation |
05000280/FIN-2012002-01 | 2012Q1 | | Operability Determinations Questioned When the 1B Charging Pump Lube Oil Exhibited Foaming |
05000280/FIN-2012004-02 | 2012Q3 | H.14 | Failure to Follow Operability Procedure for 1B Charging Pump |
05000280/FIN-2012004-01 | 2012Q3 | | Follow-up for NOED 12-2-003, Surry Power Station Units 1 and 2, Technical Specification 3.16 Emergency Power System, Specific to Emergency Diesel Generator (EDG) 02-EE-EG-1 |
05000280/FIN-2012005-01 | 2012Q4 | P.2 | Submerged Cables Identified in SAFETY-RELATED Manhole |
05000280/FIN-2012404-01 | 2012Q4 | | Security |