| | Q | CCA | Title |
|---|
| 05000280/FIN-2011004-01 | 2011Q3 | H.9 H.2(b) | Failure to Follow Scaffolding Procedure Requirements |
| 05000280/FIN-2011004-02 | 2011Q3 | H.7 | Failure to Consider Instrument Uncertainty and Establish Calibration Controls for Rotameters Used to Vent Gas from ECCS Systems |
| 05000280/FIN-2011005-01 | 2011Q4 | P.3 | Inadequate Corrective Actions to Address Rainwater Intrusion into the Unit 1 RPS Relay Room |
| 05000280/FIN-2011011-01 | 2011Q4 | | Failure to Provide Appropriate Procedural Guidance for Component Cooling Water Flow to the Thermal Barrier Heat Exchangers |
| 05000280/FIN-2011011-02 | 2011Q4 | | Failure to Implement Design Control Measures to Verify the Adequacy of TOLs at Degraded Voltage Conditions |
| 05000280/FIN-2011011-03 | 2011Q4 | H.7 | Failure to Provide Adequate Instructions in the Operations Surveillance Procedure for the Charging Pump Service Water System |
| 05000280/FIN-2011011-04 | 2011Q4 | | Failure to Monitor or Perform Effective Preventive Maintenance on the AAC Diesel Ventilation Supply Dampers and Exhaust Fans Louvers |
| 05000280/FIN-2011011-05 | 2011Q4 | | Failure to Implement Design Control Measures to Verify the Adequacy of Inputs Into the RS NPSHa Analysis |
| 05000280/FIN-2011005-02 | 2011Q4 | | Failure to Provide Preventive or Corrective Maintenance Operations for the RCS Standpipe Resulted in TS 6.4.A.7 Violation |
| 05000280/FIN-2012002-02 | 2012Q1 | H.7 | Failure to Maintain a Standard Emergency Action Level Scheme for Earthquakes |
| 05000280/FIN-2012007-01 | 2012Q1 | | Failure to Provide Preventive or Corrective Maintenance Operations for the RCS Standpipe Resulted in TS 6.4.A.7 Violation |
| 05000280/FIN-2012002-01 | 2012Q1 | | Operability Determinations Questioned When the 1B Charging Pump Lube Oil Exhibited Foaming |