05000277/FIN-2016002-02
From kanterella
Jump to navigation
Jump to search
Finding | |
|---|---|
| Title | Untimely Corrective Actions to Address Condition Adverse to the Fire Protection Program Alternative Shutdown Capability |
| Description | The inspectors identified an NCV of very low safety significance (Green) of PB Unit 2 and Unit 3 Facility Operating License condition 2.C.(4) for failure to implement and maintain in effect all provisions of the approved fire protection program. Exelon did not correct a condition adverse to the fire protection program alternative shutdown capability in a timely manner. Specifically, Exelon did not establish testing requirements for transfer/isolation switches since the identification of the issue on February 6, 2014, and the due date to complete this action was extended to February 24, 2018. As a result, Exelon has delayed assurance that the components credited for alternative shutdown capability would perform their fire protection design basis function. Exelon entered this issue into their CAP as IR 02669323. This performance deficiency (PD) was more than minor because it was associated with the protection against external factors (fire) attribute of the Mitigating Systems cornerstone and affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, by failing to correct the condition, Exelon has not ensured that the control circuit for the safe shutdown components would be isolated from the effects of fire damage. The inspectors determined that the finding was of very low safety significance (Green) based on IMC 0609, Appendix F, Fire Protection SDP, task number 1.3.1, because Exelon had demonstrated reasonable expectation of functionality for these switches by having comparable switches in the test program and periodically testing those switches. The test results did not indicate any kind of significant failures of these switches. This finding was determined to have a cross-cutting aspect in the area of Human Performance, Resources, in that, Exelon extended the due date to complete the corrective action to support the completion of higher priority items, indicating lack of resources. |
| Site: | Peach Bottom |
|---|---|
| Report | IR 05000277/2016002 Section 4OA2 |
| Date counted | Jun 30, 2016 (2016Q2) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71152 |
| Inspectors (proximate) | B Smith C Graves D Schroeder J Heinly J Kulp J Patel M Modes P Boguszewski |
| Violation of: | License Condition - Fire Protection |
| CCA | H.1, Resources |
| INPO aspect | LA.1 |
| ' | |
Finding - Peach Bottom - IR 05000277/2016002 | ||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Peach Bottom) @ 2016Q2
Self-Identified List (Peach Bottom)
| ||||||||||||||||||||||||||||||||||||||