| Q | CCA | Title |
---|
05000271/FIN-2012004-01 | 2012Q3 | H.8 | Incorrect Assessment of Equipment Condition Resulted in Single Recirculating LOOP Operation |
05000271/FIN-2012004-02 | 2012Q3 | H.9 | Dedicated Operators Required for Operability Under Applied Administrative Controls Left Immediate Vicinity of Open Valves |
05000271/FIN-2012005-01 | 2012Q4 | H.14 | Failure of the B Emergency Diesel Generator from Jacket Water Leakage Due to Inadequate Corrective Action |
05000271/FIN-2013002-01 | 2013Q1 | P.1 | Appendix R Fire Door Not Latching Closed Due to Misalignment |
05000271/FIN-2013002-02 | 2013Q1 | H.5 | Failure to Implement Compensatory Measures Associated with a Temporary Modification |
05000271/FIN-2013002-03 | 2013Q1 | P.5 | Inadequate Corrective Action for Maintaining Operability of the LOW Pressure Coolant Injection Battery UPS-1A |
05000271/FIN-2013002-04 | 2013Q1 | H.14 | Failure of the B Emergency Diesel Generator from Jacket Water Leakage Due to Inadequate Corrective Action |
05000271/FIN-2013003-01 | 2013Q2 | P.1 | Inadequate Corrective Actions for Sealing Flood Pathways into the Electrical Switchgear Rooms |
05000271/FIN-2013003-02 | 2013Q2 | H.4 H.5 | Failure to Maintain Compensatory Measures Required for a Barrier Breach Permit for the A Emergency Diesel Generator Room |
05000271/FIN-2013003-03 | 2013Q2 | H.7 | Inadequate Procedure for Configuration Control Results in a Dislodged Secondary Containment Blowout Panel Due to Reactor Building Ventilation System Pressurization |
05000271/FIN-2013008-01 | 2013Q2 | | Improper Maintenance Rule Scoping of the Reactor Building HVAC System |
05000271/FIN-2013202-01 | 2013Q2 | H.13 | Security |