| Q | CCA | Title |
---|
05000271/FIN-2009002-01 | 2009Q1 | P.1 P.1(a) | Failure to write a condition report (CR) for an adverse condition associated with water accumulating in the turbine building supply fan housing plenum area |
05000271/FIN-2009002-02 | 2009Q1 | H.2 | Failure to perform procedurally required engineering evaluations for scaffolding. |
05000271/FIN-2009006-01 | 2009Q2 | P.3 | Failure to take adequate corrective actions for a HPCI system functional failure |
05000271/FIN-2009004-01 | 2009Q3 | H.8 | Failure to initiate corrective action condition reports for all deficient items identified during cooling tower inspections |
05000271/FIN-2009005-02 | 2009Q4 | | Troubleshooting Activities on Inoperable vacuum Breakers |
05000271/FIN-2009405-01 | 2009Q4 | H.5 | Security |
05000271/FIN-2009005-01 | 2009Q4 | H.5 | Inadequate Risk Assessment Associated with the Low Pressure Coolant Injection Subsystem |