05000260/LER-1981-058, Forwards Updated LER 81-058/03X-1

From kanterella
Jump to navigation Jump to search
Forwards Updated LER 81-058/03X-1
ML20039F730
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 12/30/1981
From: Holder H
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20039F731 List:
References
NUDOCS 8201130284
Download: ML20039F730 (1)


LER-1981-058, Forwards Updated LER 81-058/03X-1
Event date:
Report date:
2601981058R00 - NRC Website

text

__

TENNESS g4CtY AUTHORITY

ch'A poppMTEMNESSEE 374ot

'1750 Chestnut Str et Tower II gf December 30, 1981 Mr. James P. 0'Reilly, Director U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

1 TENNESSEE VALLEY AUT110RITY - BROWNS FERRY NUCLEAR PLANT UNIT 2 - DOCKET No. 50-260 - FACILITY OPERATING LICENSE DPR REPORTABLE OCCURRENCE REPORT BFRO-50-260/81058 - REVISION 1 The enclosed report is a supplement to my letter to you dated November 27, 1981, concerning drywell/ torus differential pressure which was less than Technical Specification 3.7.A.b.a limit of 1.3 psi during normal operation.

This report is submitted in accordance with Browns Ferry unit 2 Technical Specification 6.7.2.b(2).

Very truly yours, TENNESSEE VALLEY AUTHORITY y

'A h S

REcarygO H. J. Green Director of Nuclear Power

[

SN j j fgg2h 3 b

Enclosure 4

cc (Enclosure):

.A Document and Control Desk U.S. Nuclear Regulatory Commission l

Washington, DC 20555 Records Center Institute of Nuclear Power Operations 1820 Water Place Atlanta, Georgia 30339 4

Mr. K. F. Sullivan, NRC Inspector, Browns Ferry 4

J B201'130294' 011230 7

vtBCIN' >

PDR ADOCK 05000260 S

PDR 2[

An Equal Opportunity Employer in6z