05000249/FIN-2015003-03
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Post Protected Pathway Signs |
Description | The inspectors identified a finding of very low safety significance, and an associated NCV of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the licensees failure to implement all necessary prescribed risk management actions as required by licensee procedure OP-AA-108-117, Protected Equipment Program, during a Unit 3 low pressure coolant injection (LPCI) logic system functional test (LSFT) maintenance window. Specifically, the licensee failed to post protected equipment signs for the Unit 3 2203-28 instrument rack whose unavailability impacts the high pressure coolant injection (HPCI) system and would have taken the unit into a licensee-defined Orange risk condition and Technical Specification (TS) Limiting Condition for Operations (LCO) 3.0.3. The performance deficiency was determined to be more than minor because the licensee failed to implement prescribed risk management actions which if left uncorrected could have become a more significant safety concern. Specifically, operators inadvertently removed the protected equipment postings on instrument rack 2203-28 which could have significantly degraded the key safety function of reactor coolant inventory control if both the HPCI and LPCI systems became unavailable simultaneously and were required to mitigate the consequences of an accident that could result in potential offsite exposure comparable to the 10 CFR Part 100 guidelines. The finding screened as very low safety significance (Green) because the inspectors answered No to all of the Mitigating Systems Screening Questions. The inspectors determined this finding had a cross-cutting aspect in the area of Human Performance, Work Management, because the licensee failed to implement risk management actions in accordance with procedure OP-AA-108-117. Specifically, the licensee inappropriately removed protected equipment postings prior to commencing maintenance activities which required the risk management activity to be in place. |
Site: | Dresden |
---|---|
Report | IR 05000249/2015003 Section 1R13 |
Date counted | Sep 30, 2015 (2015Q3) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.13 |
Inspectors (proximate) | D Lords E Sanchez-Santiago G Roach J Corujo-Sandin J Robbins J Rutkowski L Rodriguez M Porfirio T Go |
Violation of: | 10 CFR 50 Appendix B Criterion V Technical Specification Technical Specification - Procedures |
CCA | H.5, Work Management |
INPO aspect | WP.1 |
' | |