| Title | Inadequate Work Packages Associated with Maintenance on the Main Generator Exciter Air Cooler Reversing Head |
| Description | A self-revealing Green finding (FIN) was identified for inadequate development and maintenance of work packages as required by Exelon Generation Company, LLC (Exelon) procedure CNG-MN-4.01-1003, Work Order Planning, Revision 00701. Specifically, the work packages associated with maintenance on the main generator exciter air cooler reversing head did not adequately incorporate and comply with vendor recommendations, which resulted in a service water (SW) leak on the reversing chamber of the generator exciter air cooler, a rapid downpower, and shutdown of the reactor. This finding is more than minor because it is associated with the procedure quality attribute of the Initiating Events cornerstone and affected the cornerstone objective to limit the likelihood of events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. Specifically, the work packages associated with maintenance on the main generator exciter air cooler reversing head did not adequately incorporate and comply with vendor specifications, which resulted in a SW leak on the reversing chamber of the generator exciter air cooler, a rapid downpower, and shutdown of the reactor. Additionally, the finding is similar to Example 4.b of IMC 0612, Power Reactor Inspection Reports, Appendix E, Examples of Minor Issues, in that a performance deficiency caused a transient. In accordance with IMC 0609.04, Initial Characterization of Findings, and Exhibit 2 of IMC 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, the inspectors determined that this finding is of very low safety significance (Green), because the finding did not cause a reactor trip and the loss of mitigation equipment relied upon to transition the plant from the onset of a trip to a stable shutdown condition. This finding has a cross-cutting aspect in the area of Problem Identification and Resolution, Identification, because Exelon did not implement a corrective action program with a low threshold for identifying issues, and individuals did not identify issues completely, accurately, and in a timely manner in accordance with the program. Specifically, Exelon staff did not initiate condition reports and document reversing head material deficiencies identified by Exelons vendor and recommended for repair in 2009, 2012, and 2014 [P.1]. |
| Site: | Ginna |
|---|---|
| Report | IR 05000244/2014004 Section 4OA3 |
| Date counted | Sep 30, 2014 (2014Q3) |
| Type: | Finding: Green |
| cornerstone | Initiating Events |
| Identified by: | Self-revealing |
| Inspection Procedure: | IP 71153 |
| Inspectors (proximate) | D Dodson D Schroeder E Burket H. Anagnostopoulus N Floyd N Perry |
| CCA | P.1, Identification |
| INPO aspect | PI.1 |
| ' | |
Finding - Ginna - IR 05000244/2014004 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Ginna) @ 2014Q3