| Title | |
| Description | A self-revealing Green finding was identified for Ginna personnel not following Constellation procedure CNG-MN-4.01-GL004, Work Package Writers Guideline, Revision 00000, for planning a maintenance activity. Specifically, during the refueling outage, the work package for maintenance on the B main feedwater pump did not identify the correct gasket for the lube oil filter canister; therefore, an incorrect gasket was installed. In addition, maintenance personnel missed an opportunity to prevent the installation of the incorrect gasket when they proceeded after recognizing that the work package was not specific on the gasket required. The gasket failed after being in service for approximately 10 days resulting in a significant oil leak and causing operators to rapidly reduce plant power to 47 percent to remove the pump from service and avoid a plant trip. Immediate corrective actions included replacing the gasket with the correct one and entering this issue into the corrective action program (CAP) as CR-2012-8912. This finding is more than minor because it is associated with the human performance attribute of the Initiating Events cornerstone and adversely impacted the cornerstone objective to limit the likelihood of events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. Additionally, the finding is similar to IMC 0612, Power Reactor Inspection Reports, Appendix E, Examples of Minor Issues, example 4.b in that a personnel error caused a transient. Using IMC 0609, Appendix A, the inspectors determined this finding did not cause a reactor trip and the loss of mitigation equipment relied upon to transition the plant from the onset of the trip to a stable shutdown condition. Therefore, the inspectors determined the finding to be of very low safety significance (Green). This finding has a cross-cutting aspect in the area of Human Performance, Work Practices, because Ginna personnel proceeded in the face of uncertainty or unexpected circumstances and installed a gasket without confirming it was the correct part. |
| Site: | Ginna |
|---|---|
| Report | IR 05000244/2012005 Section 4OA3 |
| Date counted | Dec 31, 2012 (2012Q4) |
| Type: | NCV: Green |
| cornerstone | Initiating Events |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71153 |
| Inspectors (proximate) | W Schmidt T Fish G Dentel E Knutson N Perry T Mozlak E Burket D Dodson E Torres S Hammann N Floyd |
| CCA | H.12, Avoid Complacency |
| INPO aspect | QA.4 |
| ' | |
Finding - Ginna - IR 05000244/2012005 | |||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|