ENS 53788

From kanterella
Revision as of 08:30, 17 December 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
ENS 53788 +/-
Where
Grand Gulf Entergy icon.png
Mississippi (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge

10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+11.48 h0.478 days <br />0.0683 weeks <br />0.0157 months <br />)
Opened: Gerry Ellis
17:29 Dec 12, 2018
NRC Officer: Joanna Bridge
Last Updated: Dec 14, 2018
53788 - NRC Website