ML23275A1192 October 2023Improved Technical Specifications Conversion, Section 3.4, Reactor Coolant System, Revision 2 - Volume 9
ML23275A1222 October 2023Improved Technical Specifications Conversion, Section 3.7, Plant Systems, Revision 2 - Volume 12
ML21265A29715 September 2021Enclosure 2 - Volume 12 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.7 Plant Systems, Revision 0
ML21265A29415 September 2021Enclosure 2 - Volume 9 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.4 Reactor Coolant System (Rcs), Revision 0
ML21034A5193 February 20211A -PSL L-20-1 RO and SRO Student Exam Final as Given with Key
ML18043B16126 March 2018Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-Ichi Accident
IR 05000335/201700429 January 2018NRC Integrated Inspection Report 05000335/2017004 and 05000389/2017004
L-2017-155, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors19 December 2017Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors
ML20294A13217 February 2017NRC-2016-000727 - Resp 3 - Final, Agency Records Subject to the Request Are Enclosed
ML20294A1433 February 2017NRC-2016-000731 - Resp 6 -Interim, Agency Records Subject to the Request Are Enclosed
ML16034A0807 March 2016Issuance of Amendments Regarding Technical Specification Change to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents
ML15320A55123 November 2015SER MF5835
IR 05000335/20150024 August 2015IR 05000335/2015002, 05000389/2015002 & 05000335/2015011, 05000389/2015011; Assessment Follow-up Letter; 04/01/2015 -06/30/2015; St. Lucie Nuclear Plant, Units 1 & 2; Follow-up of Events and Notice of Enforcement Discretion; Radioactive Gas
ML15097A2677 April 2015301 Final SRO Written Exam
L-2015-030, Application for Technical Specifications Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents10 March 2015Application for Technical Specifications Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents
IR 05000335/201400924 September 2014IR 050003352014009 and 050003892014009, April 1, 2014 to September 24, 2014, St. Lucie, Preliminary White Finding and Apparent Violations
IR 05000335/201400325 July 2014IR 05000335-14-003, 05000389-14-003; on 04/01/2014 - 06/30/2014; St. Lucie Nuclear Plant, Units 1 & 2; Identification and Resolution of Problems; Follow-up of Events and Notice of Enforcement Discretion
ML14079A44220 March 2014NRC Staff'S Answer to Southern Alliance for Clean Energy'S Motion to Stay Restart of St. Lucie Unit 2 Pending Conclusion of Hearing Regarding De Facto Amendment of Operating License and Request for Expedited Consideration
ML14071A43110 March 2014Southern Alliance for Clean Energy'S Motion to Stay Restart of St. Lucie Unit 2 Pending Conclusion of Hearing Regarding De Facto Amendment of Operating License and Request for Expedited Consideration
L-2014-015, Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program20 February 2014Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program
L-2013-321, FPL St. Lucie Response to NRC Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns27 November 2013FPL St. Lucie Response to NRC Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns
ML12340A35230 November 2012St. Lucie, Unit 1, 12Q4116-RPT-001, Rev. 0, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Force Recommendation 2.3: Seismic
L-2012-427, Q4116-R-002, Rev. 0, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Force Recommendation 2.3: Seismic30 November 2012Q4116-R-002, Rev. 0, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Force Recommendation 2.3: Seismic
ML12335A20127 November 2012St. Lucie, Units 1 & 2 - Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Flooding
ML12340A35127 November 2012St. Lucie, Units 1 & 2, Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Seismic
L-2012-428, FPL060-PR-001, Rev. 0, Flooding Walkdown Report, in Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Flooding26 November 2012FPL060-PR-001, Rev. 0, Flooding Walkdown Report, in Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Flooding
ML12053A34012 March 2012Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident
ML12056A05012 March 2012Enclosure 4 - Recommendation 2.3: Flooding
ML12056A04912 March 2012Enclosure 3 - Recommendation 2.3: Seismic
IR 05000335/201100229 April 2011IR 05000335-11-002, 05000389-11-002, 05000335-11-501, 05000389-11-501; 01/01/2011 - 03/31/2011; St. Lucie Nuclear Plant, Units 1 & 2; Radiological Hazard Assessment and Exposure Controls; Other Activities
ML10021008119 January 2010IR 05000335-09-006, 05000389-09-006, on August 3-14, August 31 - September 4, St. Lucie Units 1 & 2 - NRC Component Design Bases Inspection
L-2009-206, Ninety-Day Supplemental Response to NRC GL-08-001 (Following the Unit 2 Spring 2009 Refueling Outage), Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.11 September 2009Ninety-Day Supplemental Response to NRC GL-08-001 (Following the Unit 2 Spring 2009 Refueling Outage), Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.
L-2009-142, Ninety-Day Supplemental Response to NRC Generic Letter 2008-01 (Charging System Walkdown), Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.17 June 2009Ninety-Day Supplemental Response to NRC Generic Letter 2008-01 (Charging System Walkdown), Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.
L-2009-034, Ninety-Day Post-Outage Supplemental Response to NRC Generic Letter 2008-01 (Following the Unit 1 Fall 2008 Refueling Outage), Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems9 February 2009Ninety-Day Post-Outage Supplemental Response to NRC Generic Letter 2008-01 (Following the Unit 1 Fall 2008 Refueling Outage), Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems
L-2008-221, Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.14 October 2008Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.
IR 05000335/200700226 April 2007IR 05000335-07-002, 05000389-07-002; on 01/01/2007 - 03/31/2007; St. Lucie Nuclear Plant, Units 1 & 2; Post Maintenance Testing: Problem Identification and Resolution of Problems; and Event Followup
ML05012036331 January 2005License Amendment 138, Change in Reload Methodology and Increase in Steam Generator Tube Plugging Limit
L-2005-007, Proposed License Amendment Third Request for Additional Information Supplement WCAP-9272 Reload Methodology and WCAP-9272 Reload Methodology and Implementing 30% Steam Generator Tube Plugging Limit7 January 2005Proposed License Amendment Third Request for Additional Information Supplement WCAP-9272 Reload Methodology and WCAP-9272 Reload Methodology and Implementing 30% Steam Generator Tube Plugging Limit
ML06166036521 December 2004Administrative Documents
ML06166036821 December 2004Administrative Documents
ML06166037021 December 2004Draft JPMs & Outline
ML06166037321 December 2004Final JPMs & Outline
ML04044011128 April 2004License Amendment, Relocation of Certain Technical Specifications Related to the Operation of the Spent Fuel and Cask Cranes to the UFSAR
L-2004-011, Emergency Plan Implementing Procedure30 January 2004Emergency Plan Implementing Procedure
ML0327903352 September 2003Emergency Plan Implementing Procedure No. EPIP-08, Rev 6, Off-Site Notifications and Protective Action Recommendations
ML17309A99630 June 1999Rev 35 to HP-90, Emergency Equipment.
ML17229B0797 April 1999LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr
ML17229A60527 January 1998LER 97-010-01:on 971027,inadvertent Core Alteration Prohibited by TSs Were Noted Due to Stuck Cea.Caused by Personnel Error.Cea #24 Was Dislodged & Transferred to Spent Pool for insp.W/980127 Ltr
ML17309A91631 December 1997Application for Amend to License NPF-16 by Incorporating Attached TS Rev.Amend Will Modify TS 5.6.1 & Associated Figure 5.6-1 & TS 5.6.3 to Accomodate Increase in Allowed SFP Storage Capacity
ML17229A53926 November 1997LER 97-010-00:on 971027,inadvertant Core Alteration Prohibited by TS Occurred.Caused by CEA Failure to Detach from Ugs.Safety Evaluation Was Performed & Procedural Rev Made to Continue Upper Guide Structure move.W/971126 Ltr