Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML23275A119 | 2 October 2023 | Improved Technical Specifications Conversion, Section 3.4, Reactor Coolant System, Revision 2 - Volume 9 |
ML23275A122 | 2 October 2023 | Improved Technical Specifications Conversion, Section 3.7, Plant Systems, Revision 2 - Volume 12 |
ML21265A297 | 15 September 2021 | Enclosure 2 - Volume 12 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.7 Plant Systems, Revision 0 |
ML21265A294 | 15 September 2021 | Enclosure 2 - Volume 9 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.4 Reactor Coolant System (Rcs), Revision 0 |
ML21034A519 | 3 February 2021 | 1A -PSL L-20-1 RO and SRO Student Exam Final as Given with Key |
ML18043B161 | 26 March 2018 | Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-Ichi Accident |
IR 05000335/2017004 | 29 January 2018 | NRC Integrated Inspection Report 05000335/2017004 and 05000389/2017004 |
L-2017-155, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors | 19 December 2017 | Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors |
ML20294A132 | 17 February 2017 | NRC-2016-000727 - Resp 3 - Final, Agency Records Subject to the Request Are Enclosed |
ML20294A143 | 3 February 2017 | NRC-2016-000731 - Resp 6 -Interim, Agency Records Subject to the Request Are Enclosed |
ML16034A080 | 7 March 2016 | Issuance of Amendments Regarding Technical Specification Change to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents |
ML15320A551 | 23 November 2015 | SER MF5835 |
IR 05000335/2015002 | 4 August 2015 | IR 05000335/2015002, 05000389/2015002 & 05000335/2015011, 05000389/2015011; Assessment Follow-up Letter; 04/01/2015 -06/30/2015; St. Lucie Nuclear Plant, Units 1 & 2; Follow-up of Events and Notice of Enforcement Discretion; Radioactive Gas |
ML15097A267 | 7 April 2015 | 301 Final SRO Written Exam |
L-2015-030, Application for Technical Specifications Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents | 10 March 2015 | Application for Technical Specifications Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents |
IR 05000335/2014009 | 24 September 2014 | IR 050003352014009 and 050003892014009, April 1, 2014 to September 24, 2014, St. Lucie, Preliminary White Finding and Apparent Violations |
IR 05000335/2014003 | 25 July 2014 | IR 05000335-14-003, 05000389-14-003; on 04/01/2014 - 06/30/2014; St. Lucie Nuclear Plant, Units 1 & 2; Identification and Resolution of Problems; Follow-up of Events and Notice of Enforcement Discretion |
ML14079A442 | 20 March 2014 | NRC Staff'S Answer to Southern Alliance for Clean Energy'S Motion to Stay Restart of St. Lucie Unit 2 Pending Conclusion of Hearing Regarding De Facto Amendment of Operating License and Request for Expedited Consideration |
ML14071A431 | 10 March 2014 | Southern Alliance for Clean Energy'S Motion to Stay Restart of St. Lucie Unit 2 Pending Conclusion of Hearing Regarding De Facto Amendment of Operating License and Request for Expedited Consideration |
L-2014-015, Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program | 20 February 2014 | Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program |
L-2013-321, FPL St. Lucie Response to NRC Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | 27 November 2013 | FPL St. Lucie Response to NRC Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns |
ML12340A352 | 30 November 2012 | St. Lucie, Unit 1, 12Q4116-RPT-001, Rev. 0, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Force Recommendation 2.3: Seismic |
L-2012-427, Q4116-R-002, Rev. 0, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Force Recommendation 2.3: Seismic | 30 November 2012 | Q4116-R-002, Rev. 0, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Force Recommendation 2.3: Seismic |
ML12335A201 | 27 November 2012 | St. Lucie, Units 1 & 2 - Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Flooding |
ML12340A351 | 27 November 2012 | St. Lucie, Units 1 & 2, Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Seismic |
L-2012-428, FPL060-PR-001, Rev. 0, Flooding Walkdown Report, in Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Flooding | 26 November 2012 | FPL060-PR-001, Rev. 0, Flooding Walkdown Report, in Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Flooding |
ML12053A340 | 12 March 2012 | Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident |
ML12056A050 | 12 March 2012 | Enclosure 4 - Recommendation 2.3: Flooding |
ML12056A049 | 12 March 2012 | Enclosure 3 - Recommendation 2.3: Seismic |
IR 05000335/2011002 | 29 April 2011 | IR 05000335-11-002, 05000389-11-002, 05000335-11-501, 05000389-11-501; 01/01/2011 - 03/31/2011; St. Lucie Nuclear Plant, Units 1 & 2; Radiological Hazard Assessment and Exposure Controls; Other Activities |
ML100210081 | 19 January 2010 | IR 05000335-09-006, 05000389-09-006, on August 3-14, August 31 - September 4, St. Lucie Units 1 & 2 - NRC Component Design Bases Inspection |
L-2009-206, Ninety-Day Supplemental Response to NRC GL-08-001 (Following the Unit 2 Spring 2009 Refueling Outage), Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. | 11 September 2009 | Ninety-Day Supplemental Response to NRC GL-08-001 (Following the Unit 2 Spring 2009 Refueling Outage), Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. |
L-2009-142, Ninety-Day Supplemental Response to NRC Generic Letter 2008-01 (Charging System Walkdown), Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. | 17 June 2009 | Ninety-Day Supplemental Response to NRC Generic Letter 2008-01 (Charging System Walkdown), Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. |
L-2009-034, Ninety-Day Post-Outage Supplemental Response to NRC Generic Letter 2008-01 (Following the Unit 1 Fall 2008 Refueling Outage), Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems | 9 February 2009 | Ninety-Day Post-Outage Supplemental Response to NRC Generic Letter 2008-01 (Following the Unit 1 Fall 2008 Refueling Outage), Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems |
L-2008-221, Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. | 14 October 2008 | Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. |
IR 05000335/2007002 | 26 April 2007 | IR 05000335-07-002, 05000389-07-002; on 01/01/2007 - 03/31/2007; St. Lucie Nuclear Plant, Units 1 & 2; Post Maintenance Testing: Problem Identification and Resolution of Problems; and Event Followup |
ML050120363 | 31 January 2005 | License Amendment 138, Change in Reload Methodology and Increase in Steam Generator Tube Plugging Limit |
L-2005-007, Proposed License Amendment Third Request for Additional Information Supplement WCAP-9272 Reload Methodology and WCAP-9272 Reload Methodology and Implementing 30% Steam Generator Tube Plugging Limit | 7 January 2005 | Proposed License Amendment Third Request for Additional Information Supplement WCAP-9272 Reload Methodology and WCAP-9272 Reload Methodology and Implementing 30% Steam Generator Tube Plugging Limit |
ML061660365 | 21 December 2004 | Administrative Documents |
ML061660368 | 21 December 2004 | Administrative Documents |
ML061660370 | 21 December 2004 | Draft JPMs & Outline |
ML061660373 | 21 December 2004 | Final JPMs & Outline |
ML040440111 | 28 April 2004 | License Amendment, Relocation of Certain Technical Specifications Related to the Operation of the Spent Fuel and Cask Cranes to the UFSAR |
L-2004-011, Emergency Plan Implementing Procedure | 30 January 2004 | Emergency Plan Implementing Procedure |
ML032790335 | 2 September 2003 | Emergency Plan Implementing Procedure No. EPIP-08, Rev 6, Off-Site Notifications and Protective Action Recommendations |
ML17309A996 | 30 June 1999 | Rev 35 to HP-90, Emergency Equipment. |
ML17229B079 | 7 April 1999 | LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr |
ML17229A605 | 27 January 1998 | LER 97-010-01:on 971027,inadvertent Core Alteration Prohibited by TSs Were Noted Due to Stuck Cea.Caused by Personnel Error.Cea #24 Was Dislodged & Transferred to Spent Pool for insp.W/980127 Ltr |
ML17309A916 | 31 December 1997 | Application for Amend to License NPF-16 by Incorporating Attached TS Rev.Amend Will Modify TS 5.6.1 & Associated Figure 5.6-1 & TS 5.6.3 to Accomodate Increase in Allowed SFP Storage Capacity |
ML17229A539 | 26 November 1997 | LER 97-010-00:on 971027,inadvertant Core Alteration Prohibited by TS Occurred.Caused by CEA Failure to Detach from Ugs.Safety Evaluation Was Performed & Procedural Rev Made to Continue Upper Guide Structure move.W/971126 Ltr |