Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML21008A41717 December 2020Technical Specification Bases
ML21008A42217 December 2020Technical Requirements Manual
IR 05000456/20190011 May 2019NRC Integrated Inspection Report 05000456/2019001; 05000457/2019001; and 07200073/2019001
ML18093B5381 May 2018Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-Ichi Accident
ML20311A6406 November 20172017 Q1-Q4 ROP Inspection Findings
IR 05000456/20170032 November 2017NRC Integrated Inspection Report 05000456/2017003 and 05000457/2017003
IR 05000456/20170011 May 2017
IR 05000456/201600427 January 2017NRC Integrated Inspection Report 05000456/2016004; 05000457/2016004; and Emergency Preparedness Program 05000456/2016501; 05000457/2016501
RS-16-248, Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Technical Requirements Manual15 December 2016Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Technical Requirements Manual
ML16357A54915 December 2016Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Technical Requirements Manual
IR 05000456/201600227 July 2016NRC Integrated Inspection Report 05000456/2016002; 05000457/2016002; 07200073/2016001 and Exercise of Enforcement Discretion
05000456/LER-2016-00219 July 2016Inadequate Protection from Tornado Missiles Identified Due to Non-Conforming Design Conditions
LER 16-002-00 for Braidwood, Unit 1, Regarding Inadequate Protection from Tornado Missiles Identified Due to Non-Conforming Design Conditions
05000456/LER-2016-00128 April 2016Auxiliary Feedwater Diesel Intake Design Deficiency Related to Turbine Building High Energy Line Break Resulted in an Unanalyzed Condition Due to Insufficient Validation of Vendor Analysis Inputs
LER 16-001-00 for Braidwood, Unit 1, Regarding Auxiliary Feedwater Diesel Intake Design Deficiency Related to Turbine Building High Energy Line Break Resulted in an Unanalyzed Condition Due to Insufficient Validation of Vendor Analysis Inputs
ML15133A47320 May 2015Digital Upgrades of the Non-Safety Related NSSS Control Systems at Byron and Braidwood Stations
ML15135A42619 May 2015EOC Public Meeting Slides
IR 05000456/201500130 April 2015IR 05000456/2015001; 05000457/2015001, 01/01/15-03/31/15, Braidwood Station, Units 1 & 2; Adverse Weather Protection; Operability Determinations and Functionality Assessments; and Emergency Response Organization Staffing and Augmentation Sy
ML15105A34623 March 2015NSAL-15-2 - Impact of a Break in the Reactor Coolant Pump No. 1 Seal Leak-off Line Piping on Seal Leakage During a Loss of Seal Cooling Event
IR 05000456/201400510 February 2015IR 05000456/2014005; 05000457/2014005; on 10/01/2014 - 12/31/2014; Braidwood Station, Units 1 & 2; Operability Determinations and Functionality Assessments; Problem Identification and Resolution; Other Activities
IR 05000456/201400413 November 2014IR 05000456/2014004; 05000457/2014004 and 07200073/2014001; 07/01/2014 - 09/30/2014; Braidwood Station, Units 1 & 2; Flood Protection Measures; Operability Determinations and Functionality Assessments; Post-Maintenance Testing; Emergency Pr
IR 05000456/201400325 July 2014IR 05000456-14-003; 05000457/2014003; 04/01/2014- 06/30/2014; Braidwood Station, Units 1 and 2; Routine Integrated Inspection
ML14141A13330 June 2014Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident
ML14101A3524 June 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident
ML14101A4454 June 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (Tac No. MF0095)
RS-14-034, Supplement Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendtion 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident31 March 2014Supplement Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendtion 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
RS-12-159, Enclosure 2 to RS-14-034 - Updated Transmittal 2 (Annex B) Seismic Walkdown Report in Report to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 3.4. Part 113 February 2014Enclosure 2 to RS-14-034 - Updated Transmittal 2 (Annex B) Seismic Walkdown Report in Report to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 3.4. Part 1
RS-13-174, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident6 January 2014Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
ML13325A89123 December 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding Walkdowns
ML13148A10515 April 20132013 Braidwood Station Initial License Examination Proposed Written Exam with Answers
ML13169A41815 April 20132013 Braidwood Station Initial License Examination Administered Written Exam with Answers
RS-12-160, Co, LLCs 180-day Response to NRC Request for Information Pursuant to 10CFR50.54(f) the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident27 November 2012Co, LLCs 180-day Response to NRC Request for Information Pursuant to 10CFR50.54(f) the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
ML12339A22316 November 201212Q0108.10-R-002, Revision 0, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Braidwood Station, Unit 2. Part 1 of 5
ML12339A21716 November 201212Q0108.10-R-001, Revision 0, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Braidwood Station, Unit 1. Part 1 of 5
IR 05000456/20120078 August 2012IR 05000456-12-007, 05000457-12-007, 06/11/2012 06/29/2012, Braidwood Station, Units 1 and 2, Identification and Resolution of Problems
IR 05000456/20120028 May 2012IR0 5000456-12-002, 05000457-12-002; Exelon Generation Company, LLC; 01/01/2012 ?03/31/2012; Braidwood Station, Units 1 & 2, Fire Protection, Flood Protection Measures Maintenance Effectiveness, Operability Determinations and Functional Ass
ML12053A34012 March 2012Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident
ML12056A04912 March 2012Enclosure 3 - Recommendation 2.3: Seismic
ML12056A05012 March 2012Enclosure 4 - Recommendation 2.3: Flooding
IR 05000456/20110049 November 2011IR 05000456-11-004, 05000457-11-004; on 07/01/2011 - 09/30/2011; Braidwood Station, Units 1 & 2; Adverse Weather Protection; Operability Evaluations; Plant Modifications; Surveillance Testing; and Identification and Resolution of Problems
IR 05000454/201101516 June 2011IR 05000456-11-012; 05000457-11-012; 05000454-11-015; 05000455-11-015, on 3/31/2011 - 5/4/2011; Braidwood and Byron Stations, Units 1 & 2; Special Inspection
IR 05000456/20110022 May 2011IR 05000456-11-002, 05000457-11-002, on 01/01/2011 - 03/31/2011, Braidwood Station, Units 1 & 2, Follow Up of Events Other Activities
ML1106700767 March 2011Retraction of Licensee Event Report 2010-002-00 - Containment Spray Pump Suction Valve Failed to Close Resulting in an Unanalyzed Plant Condition Due to Procedure Error
IR 05000456/20100058 February 2011IR 05000456-10-005, 05000457-10-005, on 10/01/2010 - 12/31/2010; Braidwood Station, Units 1 & 2; Fire Protection; Identification and Resolution of Problems; Followup of Events
IR 05000456/201000329 July 2010IR 05000456-10-003, 05000457-10-003, on 04/01/2010 - 06/30/2010, Braidwood Station, Units 1 & 2, Follow-Up of Events and Notices of Enforcement Discretion
RS-10-094, Units 1 and 2 - Additional Information Supporting License Amendment Request to Change Fire Protection Program Requirements for Upper Cable Spreading Rooms27 May 2010Units 1 and 2 - Additional Information Supporting License Amendment Request to Change Fire Protection Program Requirements for Upper Cable Spreading Rooms
IR 05000456/201000214 May 2010IR 05000456-10-002, 05000457-10-002, on 01/01/2010 - 03/31/2010, Braidwood Station, Units 1 & 2, Operability Evaluations, Plant Modifications, Event Follow-Up, and Other Activities
RS-08-161, Braidwood, Units 1 and 2 - Technical Specification Bases15 December 2008Braidwood, Units 1 and 2 - Technical Specification Bases
ML09027047415 December 2008Technical Specification Bases
RS-05-006, Nuclear/Amergen, Proposed Changes to Delete the Reporting Requirement Section of the Facility Operating License25 February 2005Nuclear/Amergen, Proposed Changes to Delete the Reporting Requirement Section of the Facility Operating License
RS-04-125, Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program29 November 2004Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program
ML20198A01518 June 199810CFR50.59 Summary Rept 960619 Through 980618, Vols I & Ii,Consisting of Descriptions & SE Summaries for Changes to Procedural UFSAR Changes,Tests & Experiments & FP Rept.Without Fp,Rept