Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML21008A417 | 17 December 2020 | Technical Specification Bases |
ML21008A422 | 17 December 2020 | Technical Requirements Manual |
IR 05000456/2019001 | 1 May 2019 | NRC Integrated Inspection Report 05000456/2019001; 05000457/2019001; and 07200073/2019001 |
ML18093B538 | 1 May 2018 | Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-Ichi Accident |
ML20311A640 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
IR 05000456/2017003 | 2 November 2017 | NRC Integrated Inspection Report 05000456/2017003 and 05000457/2017003 |
IR 05000456/2017001 | 1 May 2017 | |
IR 05000456/2016004 | 27 January 2017 | NRC Integrated Inspection Report 05000456/2016004; 05000457/2016004; and Emergency Preparedness Program 05000456/2016501; 05000457/2016501 |
RS-16-248, Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Technical Requirements Manual | 15 December 2016 | Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Technical Requirements Manual |
ML16357A549 | 15 December 2016 | Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Technical Requirements Manual |
IR 05000456/2016002 | 27 July 2016 | NRC Integrated Inspection Report 05000456/2016002; 05000457/2016002; 07200073/2016001 and Exercise of Enforcement Discretion |
05000456/LER-2016-002 | 19 July 2016 | Inadequate Protection from Tornado Missiles Identified Due to Non-Conforming Design Conditions LER 16-002-00 for Braidwood, Unit 1, Regarding Inadequate Protection from Tornado Missiles Identified Due to Non-Conforming Design Conditions |
05000456/LER-2016-001 | 28 April 2016 | Auxiliary Feedwater Diesel Intake Design Deficiency Related to Turbine Building High Energy Line Break Resulted in an Unanalyzed Condition Due to Insufficient Validation of Vendor Analysis Inputs LER 16-001-00 for Braidwood, Unit 1, Regarding Auxiliary Feedwater Diesel Intake Design Deficiency Related to Turbine Building High Energy Line Break Resulted in an Unanalyzed Condition Due to Insufficient Validation of Vendor Analysis Inputs |
ML15133A473 | 20 May 2015 | Digital Upgrades of the Non-Safety Related NSSS Control Systems at Byron and Braidwood Stations |
ML15135A426 | 19 May 2015 | EOC Public Meeting Slides |
IR 05000456/2015001 | 30 April 2015 | IR 05000456/2015001; 05000457/2015001, 01/01/15-03/31/15, Braidwood Station, Units 1 & 2; Adverse Weather Protection; Operability Determinations and Functionality Assessments; and Emergency Response Organization Staffing and Augmentation Sy |
ML15105A346 | 23 March 2015 | NSAL-15-2 - Impact of a Break in the Reactor Coolant Pump No. 1 Seal Leak-off Line Piping on Seal Leakage During a Loss of Seal Cooling Event |
IR 05000456/2014005 | 10 February 2015 | IR 05000456/2014005; 05000457/2014005; on 10/01/2014 - 12/31/2014; Braidwood Station, Units 1 & 2; Operability Determinations and Functionality Assessments; Problem Identification and Resolution; Other Activities |
IR 05000456/2014004 | 13 November 2014 | IR 05000456/2014004; 05000457/2014004 and 07200073/2014001; 07/01/2014 - 09/30/2014; Braidwood Station, Units 1 & 2; Flood Protection Measures; Operability Determinations and Functionality Assessments; Post-Maintenance Testing; Emergency Pr |
IR 05000456/2014003 | 25 July 2014 | IR 05000456-14-003; 05000457/2014003; 04/01/2014- 06/30/2014; Braidwood Station, Units 1 and 2; Routine Integrated Inspection |
ML14141A133 | 30 June 2014 | Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident |
ML14101A352 | 4 June 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident |
ML14101A445 | 4 June 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (Tac No. MF0095) |
RS-14-034, Supplement Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendtion 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 31 March 2014 | Supplement Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendtion 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident |
RS-12-159, Enclosure 2 to RS-14-034 - Updated Transmittal 2 (Annex B) Seismic Walkdown Report in Report to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 3.4. Part 1 | 13 February 2014 | Enclosure 2 to RS-14-034 - Updated Transmittal 2 (Annex B) Seismic Walkdown Report in Report to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 3.4. Part 1 |
RS-13-174, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 6 January 2014 | Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident |
ML13325A891 | 23 December 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding Walkdowns |
ML13148A105 | 15 April 2013 | 2013 Braidwood Station Initial License Examination Proposed Written Exam with Answers |
ML13169A418 | 15 April 2013 | 2013 Braidwood Station Initial License Examination Administered Written Exam with Answers |
RS-12-160, Co, LLCs 180-day Response to NRC Request for Information Pursuant to 10CFR50.54(f) the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 27 November 2012 | Co, LLCs 180-day Response to NRC Request for Information Pursuant to 10CFR50.54(f) the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident |
ML12339A223 | 16 November 2012 | 12Q0108.10-R-002, Revision 0, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Braidwood Station, Unit 2. Part 1 of 5 |
ML12339A217 | 16 November 2012 | 12Q0108.10-R-001, Revision 0, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Braidwood Station, Unit 1. Part 1 of 5 |
IR 05000456/2012007 | 8 August 2012 | IR 05000456-12-007, 05000457-12-007, 06/11/2012 06/29/2012, Braidwood Station, Units 1 and 2, Identification and Resolution of Problems |
IR 05000456/2012002 | 8 May 2012 | IR0 5000456-12-002, 05000457-12-002; Exelon Generation Company, LLC; 01/01/2012 ?03/31/2012; Braidwood Station, Units 1 & 2, Fire Protection, Flood Protection Measures Maintenance Effectiveness, Operability Determinations and Functional Ass |
ML12053A340 | 12 March 2012 | Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident |
ML12056A049 | 12 March 2012 | Enclosure 3 - Recommendation 2.3: Seismic |
ML12056A050 | 12 March 2012 | Enclosure 4 - Recommendation 2.3: Flooding |
IR 05000456/2011004 | 9 November 2011 | IR 05000456-11-004, 05000457-11-004; on 07/01/2011 - 09/30/2011; Braidwood Station, Units 1 & 2; Adverse Weather Protection; Operability Evaluations; Plant Modifications; Surveillance Testing; and Identification and Resolution of Problems |
IR 05000454/2011015 | 16 June 2011 | IR 05000456-11-012; 05000457-11-012; 05000454-11-015; 05000455-11-015, on 3/31/2011 - 5/4/2011; Braidwood and Byron Stations, Units 1 & 2; Special Inspection |
IR 05000456/2011002 | 2 May 2011 | IR 05000456-11-002, 05000457-11-002, on 01/01/2011 - 03/31/2011, Braidwood Station, Units 1 & 2, Follow Up of Events Other Activities |
ML110670076 | 7 March 2011 | Retraction of Licensee Event Report 2010-002-00 - Containment Spray Pump Suction Valve Failed to Close Resulting in an Unanalyzed Plant Condition Due to Procedure Error |
IR 05000456/2010005 | 8 February 2011 | IR 05000456-10-005, 05000457-10-005, on 10/01/2010 - 12/31/2010; Braidwood Station, Units 1 & 2; Fire Protection; Identification and Resolution of Problems; Followup of Events |
IR 05000456/2010003 | 29 July 2010 | IR 05000456-10-003, 05000457-10-003, on 04/01/2010 - 06/30/2010, Braidwood Station, Units 1 & 2, Follow-Up of Events and Notices of Enforcement Discretion |
RS-10-094, Units 1 and 2 - Additional Information Supporting License Amendment Request to Change Fire Protection Program Requirements for Upper Cable Spreading Rooms | 27 May 2010 | Units 1 and 2 - Additional Information Supporting License Amendment Request to Change Fire Protection Program Requirements for Upper Cable Spreading Rooms |
IR 05000456/2010002 | 14 May 2010 | IR 05000456-10-002, 05000457-10-002, on 01/01/2010 - 03/31/2010, Braidwood Station, Units 1 & 2, Operability Evaluations, Plant Modifications, Event Follow-Up, and Other Activities |
RS-08-161, Braidwood, Units 1 and 2 - Technical Specification Bases | 15 December 2008 | Braidwood, Units 1 and 2 - Technical Specification Bases |
ML090270474 | 15 December 2008 | Technical Specification Bases |
RS-05-006, Nuclear/Amergen, Proposed Changes to Delete the Reporting Requirement Section of the Facility Operating License | 25 February 2005 | Nuclear/Amergen, Proposed Changes to Delete the Reporting Requirement Section of the Facility Operating License |
RS-04-125, Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program | 29 November 2004 | Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program |
ML20198A015 | 18 June 1998 | 10CFR50.59 Summary Rept 960619 Through 980618, Vols I & Ii,Consisting of Descriptions & SE Summaries for Changes to Procedural UFSAR Changes,Tests & Experiments & FP Rept.Without Fp,Rept |