Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML20302A282 | 25 September 2020 | 3 to Updated Final Safety Analysis Report, Section 3, Design Criteria - Structures, Components, Equipment, and Systems, Part 3 of 3 |
L-19-189, 54010-CALC-01, Davis-Besse Nuclear Power Station: Evaluation of Risk Significance of Permanent ILRT Extension. | 29 July 2019 | 54010-CALC-01, Davis-Besse Nuclear Power Station: Evaluation of Risk Significance of Permanent ILRT Extension. |
ML18114A167 | 3 May 2018 | Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to RIS 2015-06, Tornado Missile Protection: |
L-18-108, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformance Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile.... | 12 April 2018 | Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformance Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile.... |
05000346/LER-2017-001 | 18 September 2017 | Emergency Diesel Generator Fuel Oil Storage Tank Vents Not Adequately Protected from Tornado-Generated Missiles LER 17-001-00 for Davis-Besse, Unit 1, Regarding Emergency Diesel Generator Fuel Oil Storage Tank Vents Not Adequately Protected from Tornado-Generated Missiles |
ML17017A340 | 31 January 2017 | Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-051 and EA-12-049 |
L-16-322, Revision 31 to Updated Final Safety Analysis Report, Section 10 (Redacted) | 21 November 2016 | Revision 31 to Updated Final Safety Analysis Report, Section 10 (Redacted) |
IR 05000346/2016007 | 22 June 2016 | NRC Component Design Bases Inspection Report 05000373/2016007; 05000346/2016007 |
ML15280A287 | 6 October 2015 | Additional Information for the Advisory Committee on Reactor Safeguards Review of License Renewal Application |
IR 05000346/2015008 | 10 April 2015 | IR 05000346/2015008, 01/26/2015 - 02/27/2015; Davis-Besse Nuclear Power Station; Component Design Bases Inspection |
ML15082A125 | 1 April 2015 | Final TIA Response-Laminar Cracks in the Shield Building |
ML14136A486 | 16 May 2014 | Fenoc'S Answer Opposing Intervenors'S Motion for Admission of Contention No. 6 |
ML14122A029 | 21 April 2014 | Comment (21) of Keven Kamps on License Renewal Application for Davis-Besse Nuclear Power Station, Unit 1; Draft Supplemental Generic Environmental Impact Statement |
ML14080A184 | 21 March 2014 | Summary of Webinar Meeting to Discuss NRC Inspection Activities Associated with the Davis-Besse Nuclear Power Station Installation of Two New Steam Generators |
ML12254A138 | 10 September 2012 | NRC Staff'S Answer to Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking) |
ML12131A031 | 10 May 2012 | NRC Staff Transmittal of Inspection Report Regarding Cracks Found in the Shield Building for Davis-Besse, Unit 1 |
ML14251A610 | 8 May 2012 | Riley E-mail Re Current Licensing Basis |
ML12187A476 | 8 May 2012 | E-mail from Timothy Riley on NRC Inspection Report for Davis Besse |
IR 05000346/2012007 | 7 May 2012 | IR 05000346-12-007 (Drs), 07/18/2011 - 04/17/2012, Davis-Besse Nuclear Power Station; Reactor Vessel Head Replacement and Shield Building Cracking |
ML110910566 | 20 April 2011 | Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit 1, License Renewal Application |
IR 05000346/2009007 | 19 February 2010 | IR 05000346-09-007; 11/03/2009 - 01/14/2010; Davis-Besse Nuclear Power Station; Component Design Bases Inspection |
ML070290250 | 30 January 2007 | Withdrawal of an Amendment Request |
ML070310312 | 26 January 2007 | Withdrawal of License Amendment Application to Change Design Requirements for Tornado Missile Protection |
ML062620445 | 23 October 2006 | Draft Request for Additional Information Regarding Diesel Requirements for Tornado Missile Protection |
ML061080126 | 25 May 2006 | Request for Additional Information Related to Tornado Missile Protection |
ML050140276 | 11 January 2005 | License Amendment Application to Change Design Requirements for Tornado Missile Protection (License Amendment Request No. 04-0024) |
IR 05000346/2004010 | 3 August 2004 | IR 05000346-04-010(DRS) on 6/28/2004 - 7/2/2004 for Davis-Besse Nuclear Power Station; Evaluations of Changes, Experiments or Tests, and Permanent Plant Modifications |
ML041620077 | 1 June 2004 | (Revised) Minutes of Internal Meeting of the Davis-Besse Nuclear Power Station IMC 0350 Oversight Panel (Revised Comment) |
ML040680070 | 5 March 2004 | IR 05000346-03-010(DRS); 03/17/2003 - 01/07/2004; Davis-Besse Nucler Power Station; Corrective Action Program Implementation Effectiveness |
ML032400435 | 25 August 2003 | G20030508 - James P. Riccio Ltr Re Petition Pursuant to 10 CFR 2.206: a Request for Enforcement Action Against First Energy Nuclear Operating Company (Davis-Besse) |
ML032600987 | 25 August 2003 | G20030508 - James P. Riccio Ltr Re Petition Pursuant to 10 CFR 2.206: a Request for Enforcement Action Against First Energy Nuclear Operating Company (Davis-Besse) |
ML030710166 | 10 February 2003 | Questions for Davis-Besse Manual Chapter 0350 Panel from the Union of Concerned Scientists |
ML030490043 | 10 February 2003 | Questions for Davis-Besse Manual Chapter 0350 Panel |
ML20212D350 | 21 September 1999 | Forward Copy of Final Accident Sequence Precursor Analysis of Operational Event at Plant,Unit 1 on 980624,reported in LER 346/98-006 |
ML20134F181 | 30 January 1997 | Proposed Tech Specs Re Possession & Use of SNM as Reactor Fuel |
ML20215C239 | 29 August 1986 | Responds to Violations Noted in Insp Rept 50-346/85-40. Corrective Actions:Sys Engineering Group Formed to Develop Detailed Sys Knowledge,Including Design Basis & Surveillance Test Requirements |
ML20206T104 | 30 June 1986 | Safety Evaluation Report Related to the Restart of DAVIS-BESSE Nuclear Power Station,Unit 1,FOLLOWING the Event of June 9,1985.Docket No. 50-346.(Toledo Edison Company) |
NUREG-1117, Forwards Draft NUREG-1117, SER Re Restart of Davis-Besse Nuclear Power Station, Per Response to NRC & Info Submitted W/Course of Action.Schedule for Resolution of Open Issues Listed in Section 1 Requested | 29 January 1986 | Forwards Draft NUREG-1117, SER Re Restart of Davis-Besse Nuclear Power Station, Per Response to NRC & Info Submitted W/Course of Action.Schedule for Resolution of Open Issues Listed in Section 1 Requested |
ML20083Q407 | 13 April 1984 | Responds to 840326 Request for Addl Info Re Tornado Missile Protection for Chlorine Detectors.Missiles Considered for Tornado Analysis Described in Table 3.5-2 of Fsar/Usar & Reviewed in Section 3.5.2 of SER (NUREG-0136) |
ML20023C595 | 29 April 1983 | Discusses Results of Analysis Performed to Determine Probability of Postulated Tornado Generated Missile Contacting Gratings Covering Ventilation Openings. Probability Acceptably Small.Condition Not RO |
ML19319C102 | 29 July 1977 | Safety Evaluation Supporting Change to Tech Specs |
ML19329B181 | 17 December 1975 | Responds to NRC 751114 Ltr.Forwards Info Re Tornado Missile Protection |
ML19329C467 | 17 July 1970 | Review of Seismic Design Criteria for Davis-Besse. |