 Issue dateTitle
ML24193A24312 July 2024– Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan
L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut10 May 2024NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio
ML24067A2628 March 2024Issuance of Amendment No. 173 Revise Technical Specification 3/4.8.1 to Allow Replacement of Reserve Auxiliary Transformer (Emergency Circumstances)
L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source4 March 2024Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source
IR 05000443/20230036 November 2023Integrated Inspection Report 05000443/2023003
IR 05000443/202301019 October 2023Triennial Fire Protection Inspection Report 05000443/2023010
IR 05000443/20230028 August 2023Integrated Inspection Report 05000443/2023002
ML23157A0726 June 2023Notification of Conduct of a Fire Protection Team Inspection
ML23117A3654 May 2023Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from PTL and Low Temperature Over Pressure Protection Curves
IR 05000443/202200430 January 2023Integrated Inspection Report 05000443/2022004 and Independent Spent Fuel Storage Installation Inspection Report 07200063/2022001
L-2022-176, License Amendment Request to Revise Cooling Tower Service Water Loop or Cell Requirements9 December 2022License Amendment Request to Revise Cooling Tower Service Water Loop or Cell Requirements
IR 05000443/202200322 November 2022Reissued Integrated Inspection Report 05000443/2022003
ML22304A1001 November 2022Integrated Inspection Report 05000443/2022003
ML22230C92430 September 2022Issuance of Amendment No. 170 Revision of 120-Volt AC Vital Instrument Panel Requirements
L-2022-106, Revised Response to Request for Additional Information (RAI) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements27 June 2022Revised Response to Request for Additional Information (RAI) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements
ML22131A1355 May 20221 to Updated Final Safety Analysis Report, Cover Letter and Information on Enclosures 1 to 7
ML22131A1295 May 20221 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features
ML22131A0915 May 20221 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls
ML22131A1265 May 20221 to Updated Final Safety Analysis Report, Chapter 3, Appendix a - C
ML22131A1065 May 20221 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML22131A0935 May 20221 to Updated Final Safety Analysis Report, Chapter 1, List of Effective Pages and Introduction and General Description of Plant
ML22131A1055 May 202265 to Technical Requirements Manual
ML22131A1175 May 20221 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems
ML22131A0965 May 20221 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System
ML22131A1225 May 20221 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications and Chapter 17, Quality Assurance
ML22131A1275 May 20228 to Fire Protection of Safe Shutdown Capability (Appendix R)
ML22245A0615 May 20221 to Updated Final Safety Analysis Report, Chapter 8, Electric Power - Redacted
ML22245A1005 May 20229 to Evaluation and Comparison to BTP Apcsb 9.5-1, Appendix a - Redacted
ML22131A0885 May 20221 to Updated Final Safety Analysis Report, Chapter 2, Appendix L - R
ML22131A1165 May 20221 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations
ML22131A0955 May 20221 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML22131A1255 May 20221 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management
SBK-L-22024, Response to Request for Additional Information (Raj) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements7 March 2022Response to Request for Additional Information (Raj) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements
IR 05000443/202100410 February 2022Integrated Inspection Report 05000443/2021004
IR 05000443/202100310 November 2021Integrated Inspection Report 05000443/2021003
ML21280A2627 October 2021Response Letter to N. Treat (C-10 Research and Education Foundation) Regarding 2Q 2021 Integrated Inspection Report Questions
SBK-L-21104, Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink Onetime Allowed Outage Time (AOT) Extension25 September 2021Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink Onetime Allowed Outage Time (AOT) Extension
SBK-L-21103, Request for Exercise of Enforcement Discretion25 September 2021Request for Exercise of Enforcement Discretion
SBK-L-21098, Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements22 September 2021Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements
SBK-L-21067, License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements21 July 2021License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements
IR 05000443/20210014 May 2021Integrated Inspection Report 05000443/2021001
ML20298A25324 November 2020Issuance of Amendment No. 166 Revise Technical Specification 3/4.8.1, A.C. Sources Operating
ML20323A12322 October 2020Rev. 20 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML20323A12122 October 2020Rev. 20 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features
ML20323A12622 October 2020Rev. 20 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System
ML20323A17022 October 2020Rev. 17 to Fire Protection Safe Shutdown Capability
ML20323A12522 October 2020Rev. 20 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML20323A13022 October 2020Rev. 20 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations
ML20323A17122 October 2020Rev. 162 to the Technical Requirements Manual
ML20323A11922 October 2020Rev. 20 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems