Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML24193A243 | 12 July 2024 | – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan |
L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut | 10 May 2024 | NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio |
ML24067A262 | 8 March 2024 | Issuance of Amendment No. 173 Revise Technical Specification 3/4.8.1 to Allow Replacement of Reserve Auxiliary Transformer (Emergency Circumstances) |
L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source | 4 March 2024 | Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source |
IR 05000443/2023003 | 6 November 2023 | Integrated Inspection Report 05000443/2023003 |
IR 05000443/2023010 | 19 October 2023 | Triennial Fire Protection Inspection Report 05000443/2023010 |
IR 05000443/2023002 | 8 August 2023 | Integrated Inspection Report 05000443/2023002 |
ML23157A072 | 6 June 2023 | Notification of Conduct of a Fire Protection Team Inspection |
ML23117A365 | 4 May 2023 | Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from PTL and Low Temperature Over Pressure Protection Curves |
IR 05000443/2022004 | 30 January 2023 | Integrated Inspection Report 05000443/2022004 and Independent Spent Fuel Storage Installation Inspection Report 07200063/2022001 |
L-2022-176, License Amendment Request to Revise Cooling Tower Service Water Loop or Cell Requirements | 9 December 2022 | License Amendment Request to Revise Cooling Tower Service Water Loop or Cell Requirements |
IR 05000443/2022003 | 22 November 2022 | Reissued Integrated Inspection Report 05000443/2022003 |
ML22304A100 | 1 November 2022 | Integrated Inspection Report 05000443/2022003 |
ML22230C924 | 30 September 2022 | Issuance of Amendment No. 170 Revision of 120-Volt AC Vital Instrument Panel Requirements |
L-2022-106, Revised Response to Request for Additional Information (RAI) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements | 27 June 2022 | Revised Response to Request for Additional Information (RAI) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements |
ML22131A135 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Cover Letter and Information on Enclosures 1 to 7 |
ML22131A129 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features |
ML22131A091 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls |
ML22131A126 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 3, Appendix a - C |
ML22131A106 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML22131A093 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 1, List of Effective Pages and Introduction and General Description of Plant |
ML22131A105 | 5 May 2022 | 65 to Technical Requirements Manual |
ML22131A117 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems |
ML22131A096 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System |
ML22131A122 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications and Chapter 17, Quality Assurance |
ML22131A127 | 5 May 2022 | 8 to Fire Protection of Safe Shutdown Capability (Appendix R) |
ML22245A061 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 8, Electric Power - Redacted |
ML22245A100 | 5 May 2022 | 9 to Evaluation and Comparison to BTP Apcsb 9.5-1, Appendix a - Redacted |
ML22131A088 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix L - R |
ML22131A116 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations |
ML22131A095 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML22131A125 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management |
SBK-L-22024, Response to Request for Additional Information (Raj) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements | 7 March 2022 | Response to Request for Additional Information (Raj) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements |
IR 05000443/2021004 | 10 February 2022 | Integrated Inspection Report 05000443/2021004 |
IR 05000443/2021003 | 10 November 2021 | Integrated Inspection Report 05000443/2021003 |
ML21280A262 | 7 October 2021 | Response Letter to N. Treat (C-10 Research and Education Foundation) Regarding 2Q 2021 Integrated Inspection Report Questions |
SBK-L-21104, Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink Onetime Allowed Outage Time (AOT) Extension | 25 September 2021 | Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink Onetime Allowed Outage Time (AOT) Extension |
SBK-L-21103, Request for Exercise of Enforcement Discretion | 25 September 2021 | Request for Exercise of Enforcement Discretion |
SBK-L-21098, Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements | 22 September 2021 | Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements |
SBK-L-21067, License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements | 21 July 2021 | License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements |
IR 05000443/2021001 | 4 May 2021 | Integrated Inspection Report 05000443/2021001 |
ML20298A253 | 24 November 2020 | Issuance of Amendment No. 166 Revise Technical Specification 3/4.8.1, A.C. Sources Operating |
ML20323A123 | 22 October 2020 | Rev. 20 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML20323A121 | 22 October 2020 | Rev. 20 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features |
ML20323A126 | 22 October 2020 | Rev. 20 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System |
ML20323A170 | 22 October 2020 | Rev. 17 to Fire Protection Safe Shutdown Capability |
ML20323A125 | 22 October 2020 | Rev. 20 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML20323A130 | 22 October 2020 | Rev. 20 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations |
ML20323A171 | 22 October 2020 | Rev. 162 to the Technical Requirements Manual |
ML20323A119 | 22 October 2020 | Rev. 20 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |