Issue date | Title | |
---|---|---|
ML23135A165 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant |
ML23135A166 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 2, Site Characteristics |
ML23135A170 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML23135A171 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 6, Engineered Safety Features |
ML23135A173 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 7, Instrumentation and Controls |
ML23135A175 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML23135A184 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 18, Response to NUREG-0737 Clarification of TMI Action Plan Requirements - Part 1 of 2 |
ML23135A199 | 8 May 2023 | Fire Hazard Analysis Report, E-1F9905 Rev 11, Post-Fire Shutdown Operator Manual Actions |
ML23135A193 | 1 September 2022 | EQSD-II, Rev 34, Equipment Qualification Summary Document |
ML22151A138 | 18 May 2022 | 5 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant |
ML22151A142 | 18 May 2022 | 5 to Updated Safety Analysis Report, Chapter 18, Response to NUREG-0737 Clarification of TMI Action Plan Requirements - Part 1 of 2 |
ML22151A150 | 18 May 2022 | 5 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML22151A153 | 18 May 2022 | 5 to Updated Safety Analysis Report, Chapter 7, Instrumentation and Controls |
ML22151A154 | 18 May 2022 | 5 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML22151A156 | 18 May 2022 | 5 to Updated Safety Analysis Report, Chapter 6, Engineered Safety Features |
ML22152A193 | 18 May 2022 | E-1F9905, Revision 11, Fire Hazard Analysis |
ML22152A199 | 18 May 2022 | EQSD-II, Revision 33, EQ Program Master List (Table 1) Plus Mild Environment SR Electrical Equipment List (Table 2) |
ET 21-0010, License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation | 29 September 2021 | License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation |
ML21210A247 | 3 September 2021 | Issuance of Amendment No. 230 Revision of Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange |
ET 21-0005, Operating Corp., License Amendment Request for a Risk-Informed Resolution to GSI-191 | 12 August 2021 | Operating Corp., License Amendment Request for a Risk-Informed Resolution to GSI-191 |
ML21168A101 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant |
ML21168A106 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 18, Response to NUREG-0737 Clarification of TMI Action Plan Requirements |
ML21168A113 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML21168A116 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 7, Instrumentation and Controls |
ML21168A117 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML21168A119 | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 6, Engineered Safety Features |
ML21168A163 | 7 June 2021 | Fire Hazards Analysis, E-1F9905, Rev. 10, Fire Hazard Analysis |
ML21168A164 | 7 June 2021 | 4 to Updated Safety Analysis Report, EQSD-II, Rev 32, EQ Master List Change Notice |
ML21053A117 | 8 April 2021 | 1 - Issuance of Amendment No. 227 TS Change Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Based on TSTF-425 |
WO 20-0050, License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange | 10 November 2020 | License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange |
ET 20-0013, Response to Request for Additional Information Re Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (TSTF-415) | 26 October 2020 | Response to Request for Additional Information Re Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (TSTF-415) |
ML20262A751 | 17 September 2020 | NRR E-mail Capture - Requests for Additional Information: Wolf Creek Amendment Request to Modify Technical Specification Surveillance Frequency Consistent with TSTF-425 |
ML20290A566 | 23 July 2020 | Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant |
ML20290A573 | 23 July 2020 | Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML20290A574 | 23 July 2020 | Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Chapter 6, Engineered Safety Features |
ML20290A575 | 23 July 2020 | Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Chapter 7, Instrumentation and Controls |
ML20290A577 | 23 July 2020 | Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML20290A586 | 23 July 2020 | Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Chapter 18, Response to NUREG-0737, Clarification of TMI Action Plan Requirements |
ML20290A609 | 23 July 2020 | Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, E-1F9906, Rev. 10, Fire Hazard Analysis |
WO 20-0041, Rev. 32 to Equipment Qualification Summary Document-II (EQSD-II) | 15 January 2020 | Rev. 32 to Equipment Qualification Summary Document-II (EQSD-II) |
ML19092A063 | 11 March 2019 | Revision 32 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant, Public |
ML19092A073 | 11 March 2019 | Revision 32 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Public |
ML19092A075 | 11 March 2019 | Revision 32 to Updated Safety Analysis Report, Chapter 6, Engineered Safety Features |
ML19092A092 | 11 March 2019 | Revision 32 to Updated Safety Analysis Report, Chapter 18, Response to NUREG-0737 Clarification of TMI Action Plan Requirements |
ML19092A146 | 11 March 2019 | Fire Protection Evaluations for Unique and Unbounded Fire Barrier Configurations - E-1F9905 Rev 10, Fire Hazard Analysis |
ML18262A415 | 27 September 2018 | Staff Review of Mitigating Strategies Assessment Report of the Impact of the Reevaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(f) Letter (CAC No. MF7893; EPID No. L-2016-JLD-0006) |
ML18093A878 | 8 March 2018 | Revision 31 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant |
ML18093A891 | 8 March 2018 | Revision 31 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML18093A893 | 8 March 2018 | Revision 31 to Updated Safety Analysis Report, Chapter 6, Engineered Safety Features |
ML18093A919 | 8 March 2018 | Revision 31 to Updated Safety Analysis Report, Chapter 18, Response to NUREG-0737 Clarification of TMI Action Plan Requirements. Redacted |