ML21144A10510 May 2021Emergency Plan Implementing Procedures. Includes IP-EP-AD1, Revision 8, IP-EP-AD6, Revision 36, IP-EP-AD40, Revision 14, IP-1055, Revision 20, IP-EP-120, Revision 15, IP-EP-210, Revision 28
ML21145A07210 May 2021Rev. 22 to IP-EP-AD-13, Emergency Action Level Technical Bases
ML21074A00022 April 2021Issuance of Amendment No. 270 Permanently Defueled Technical Specifications
ML20157A1771 June 2020Revisions to Emergency Plan Implementing Procedures
ML20157A12712 May 2020IP-EP-AD13, Revision 21, Emergency Action Level Technical Bases
ML20081J40228 April 2020Issuance of Amendment No. 294 Permanently Defueled Technical Specifications
ML20071Q71710 April 2020Issuance of Amendment Nos. 292 and No. 267 Changes to Technical Specification Sections 1.1, 4.0, and 5.0 for a Permanently Defueled Condition
ML19284A8018 October 2019IPEC IP-EP-AD13, Rev. 20, Emergency Action Level Technical Bases.
NL-19-013, Proposed Technical Specifications Change - Administrative Controls for Permanently Defueled Condition15 April 2019Proposed Technical Specifications Change - Administrative Controls for Permanently Defueled Condition
NL-19-026, Technical Specifications Proposed Change - Permanently Defueled Technical Specifications15 April 2019Technical Specifications Proposed Change - Permanently Defueled Technical Specifications
IR 05000247/20180029 January 2019Errata for Indian Point Nuclear Generating - Integrated Inspection Report 05000247/2018002 and 05000286/2018002
ML18212A19017 September 2018Renewed Facility Operating License DPR-64, Technical Specifications, Appendix a
ML18213A1531 August 2018Integrated Inspection Report 05000247/2018002 and 05000286/2018002
NL-18-052, Relief Request IP3-ISI-RR-14, Proposed Alternative to ASME Code Case N-729-4 Examination Requirements23 July 2018Relief Request IP3-ISI-RR-14, Proposed Alternative to ASME Code Case N-729-4 Examination Requirements
ML18144A0658 June 2018NRC Staff Response to Riverkeeper and Union of Concerned Scientists Regarding Indian Point, Unit 2 Reactor Vessel Head Leakage
ML18163A13824 May 2018Revision 19 to IP-EP-AD13, Emergency Action Level Technical Bases
NL-18-039, LER 2018-001-00 for Indian Point, Unit 2 Re Penetration Indications Discovered During Reactor Pressure Vessel Head Inspection21 May 2018LER 2018-001-00 for Indian Point, Unit 2 Re Penetration Indications Discovered During Reactor Pressure Vessel Head Inspection
ML18131A05711 May 2018Summary of 04/12/2018 Meeting with the State of New York Regarding the Indian Point Generating Unit No. 2 Reactor Pressure Vessel Head Penetration Alternative Weld Repair
ML18005A06623 January 2018Safety Evaluation of Relief Requests ISI-RR-20, ISI-RR-21, and ISI-RR-22 Regarding the Fourth 10-Year Interval of the Inservice Inspection Program
NL-17-159, Submittal of Relief Request IP2-ISI-RR-05 Alternative Examination Volume Required by Code Case N-729-420 December 2017Submittal of Relief Request IP2-ISI-RR-05 Alternative Examination Volume Required by Code Case N-729-4
IR 05000247/201700327 October 2017Integrated Inspection Report 05000247/2017003 and 05000286/2017003
ML17243A18618 September 2017LTR-17-0235-1 - Response/Closure Letter to Mr. Thomas Gurdziel 10 CFR 2.206 Petition Regarding the Reactor Vessel Head O-Rings at Indian Point Nuclear Generating Unit No. 3
NL-16-109, Indian Point 2 Improved Technical Specifications Bases19 September 2016Indian Point 2 Improved Technical Specifications Bases
ML16280A22919 September 2016Indian Point 2 Improved Technical Specifications Bases
NL-16-097, Fifth Ten Year Interval Inservice Inspection Program Plan6 September 2016Fifth Ten Year Interval Inservice Inspection Program Plan
ML16163A1068 June 2016Lr Hearing - FW: Ucs Bolt Assessment of Operability
ML16177A0188 June 2016Lr Hearing - (External_Sender) Ucs Bolt Assessment of Operability
ML16166A0596 June 2016IPEC Emergency Plan Procedures
ML16050A18426 February 2016Relief from the Requirements of the ASME Code
ML16005A62914 January 2016Request for Additional Information Regarding Relief Request IP2-RR-19
NL-15-139, Relief Request IP2-1SI-RR-02 Alternative Examination Volume Required by Code Case N-729-19 December 2015Relief Request IP2-1SI-RR-02 Alternative Examination Volume Required by Code Case N-729-1
ML15334A23410 August 2015Official Exhibit - ENT000624-00-BD01 - Letter from N. Salgado to Vice Pres., Operations, Entergy Nuclear Operations, Inc., IP Nuclear Generating Unit No. 2 - Relief from the Examination Area for Reactor Vessel Head Penetration . . .
ML15261A83310 August 2015ENT000679 - Redacted Revised Testimony of Entergy Witnesses Nelson F. Azevedo, Alan B. Cox, Jack R. Strosnider, Randy G. Lott, Mark A. Gray, and Barry M. Gordon Regarding Contention NYS-26B/RK-TC-1B (Metal Fatigue) (Aug. 10, 2015)
ML15222A83810 August 2015ENT000624 - Letter from N. Salgado to Vice President, Operations, Entergy Nuclear Operations, Inc., Indian Point Nuclear Generating Unit No. 2 - Relief from the Examination Area for Reactor Vessel Head Penetration Nozzles (TAC No. ME1658) .
ML15337A31810 August 2015Official Exhibit - ENT000679-PUB-00-BD01 - Redacted Revised Testimony of Entergy Witnesses Nelson F. Azevedo, Alan B. Cox, Jack R. Strosnider, Randy G. Lott, Mark A. Gray, and Barry M. Gordon Regarding Contention NYS-26B/RK-TC-1B (Metal Fat
ML15163A2314 June 2015Draft Written Exam (Folder 2)
ML15160A4094 June 2015Final Written Examination with Answer Key (401-5 Format) (Folder 2)
IR 05000247/201500112 May 2015IR 05000247-15-001, 05000286-15-001; 01/01/2015 - 03/31/2015; Indian Point Nuclear Generating (Indian Point), Units 2 and 3; Problem Identification and Resolution; Fire Protection
ML14287A30017 September 2014Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Specification Bases List of Effective Sections
NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Specification Bases List of Effective Sections17 September 2014Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Specification Bases List of Effective Sections
ML15331A2335 September 2014Official Exhibit - NYS000542-00-BD01 - Indian Point Nuclear Generating Unit No.2- Issuance of Amendment H* Alternate Repair Criteria for Steam Generator Tube Inspection and Repair
ML14198A1615 September 2014Issuance of Amendment H* Alternate Repair Criteria for Steam Generator Tube Inspection and Repair (Tac No. MF3369)
ML15160A4065 September 2014NYS000542 - Indian Point Nuclear Generating Unit No.2- Issuance of Amendment H* Alternate Repair Criteria for Steam Generator Tube Inspection and Repair
IR 05000237/201400328 July 2014IR 05000237-14-003, 05000249-14-003 & 072000037-14-001, on 04/01/2014 Through 06/30/2014, Dresden Nuclear Power Station, Units 1, 2, and 3 NRC Integrated Inspection
ML14122A3037 July 2014Issuance of Amendments Technical Specification Task Force Traveler (TSTF) 432, Change in Technical Specifications End States (WCAP-16294)
ML14107A0422 April 2014Response to Request for Additional Information Regarding the Steam Generator License Amendment Request to Revise Technical Specification for Permanent Alternate Repair Criteria
NL-13-078, Proposed License Amendment Regarding Technical Change Traveler TSTF-432-A Revision 123 May 2013Proposed License Amendment Regarding Technical Change Traveler TSTF-432-A Revision 1
IR 05000247/201200511 February 2013IR 05000247-12-005; 10/1/12 - 12/31/12; Indian Point Nuclear Generating (Indian Point) Unit 2; Follow-Up of Events and Notices of Enforcement Discretion
ML12340A72720 August 2012Official Exhibit - ENT000571-00-BD01 - Safety Evaluation Related to Amendment No. 308 for Oconee Nuclear Station Units 1, 2 and 3 (Dec. 3, 1999)
ML12233A72920 August 2012Entergy Pre-Filed Evidentiary Hearing Exhibit ENT000571, Safety Evaluation Related to Amendment No. 308 for Oconee Nuclear Station Units 1, 2 and 3 (Dec. 3, 1999)