Semantic search

Jump to navigation Jump to search
 Issue dateTitle
AEP-NRC-2022-62, 1 to Updated Final Safety Analysis Report, Chapter 14.3, Reactor Coolant System Pipe Rupture (Loss of Coolant Accident) (Unit 1)30 November 20221 to Updated Final Safety Analysis Report, Chapter 14.3, Reactor Coolant System Pipe Rupture (Loss of Coolant Accident) (Unit 1)
ML22164A86124 June 2022Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
ML22340A15926 July 2021NFPA 805 Fire Protection Program Manual (Nfppm), Revision 5
ML21125A54019 April 2021Rev. 4 to NFPA 805 Fire Protection Program Manual
ML21125A60519 April 20210 to Updated Final Safety Analysis Report, Chapter 14.3, Reactor Coolant System Pipe Rupture (Loss of Coolant Accident)(Unit 1)
AEP-NRC-2019-56, Seismic Probabilistic Risk Assessment in Response to Near Term Task Force Recommendation 2.1: Seismic4 November 2019Seismic Probabilistic Risk Assessment in Response to Near Term Task Force Recommendation 2.1: Seismic
ML18131A2536 July 2018Issuance of Amendments Request for Deviation from National Fire Protection Association 805 Requirements
IR 05000315/20180012 May 2018NRC Integrated Inspection Report 05000315/2018001 and 05000316/2018001
IR 05000315/20170011 May 2017
AEP-NRC-2016-83, Emergency License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating11 October 2016Emergency License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating
ML16287A61011 October 2016Calculation PRA-QNT-007, Calculation of Regulatory Guide 1.177 Risk Parameters for Potential One-Time Emergency Technical Specification Completion Time Change for Unit 1 and Unit 2 Train B Reserve Feed.
IR 05000315/20160016 May 2016NRC Integrated IR 05000315/2016001; 05000316/2016001,January 1, 2016 Through March 31, 2016
05000315/LER-2015-00218 January 2016-Technical Specification Violation due to Inoperable Residual. Heat Removal Pump
LER 15-002-01 for D.C. Cook, Unit 1, Regarding Technical Specification Violation Due to Inoperable Residual Heat Removal Pump
ML15328A45119 November 2015Enclosures 1 - 5: Affirmation, Description of Proposed Changes, Probabilistic Risk Assessment Technical Adequacy, and CNP Units 1 & 2 TS Pages Marked to Show Proposed Changes
AEP-NRC-2015-49, Emergency License Amendment Request to Extend the Allowed Outage Time for an Emergency Diesel Generator28 May 2015Emergency License Amendment Request to Extend the Allowed Outage Time for an Emergency Diesel Generator
ML16165A51021 April 2015Final ASP Analysis - D.C. Cook 1 (LER 315-2014-003)
ML15042A38010 February 2015IR 05000315/2014005, 05000316/2014005; on 10/01/2014 - 12/31/2014; Donald C. Cook Nuclear Power Plant, Units 1 and 2; Operability Determinations and Functional Assessments; Plant Modifications; Post Maintenance Testing; Radiological Hazard
IR 05000315/201400413 November 2014IR 05000315/2014004, 05000316/2014004, 07200072/2014001; 07/01/2014 - 09/30/2014; Donald C. Cook Nuclear Power Plant, Units 1 and 2; Maintenance Effectiveness; Operability Determinations and Functional Assessments; Post Maintenance Testing
ML14071A4365 March 2014Enclosure 3 to AEP-NRC-2014-09, Calculation, PRA-ILRT, Rev. 2, Risk Impact Assessment for Permanently Extending Containment Type a Test Interval
ML13140A39824 October 2013Issuance of Amendment Nos. 322 and 305 - Transition to NFPA 805 Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) and NFPA 805
AEP-NRC-2013-75, Response to a Request for Additional Information (RAI 63) Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 80516 September 2013Response to a Request for Additional Information (RAI 63) Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805
AEP-NRC-2013-55, Response to a Request for Additional Information Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 TAC (ME6629 and ME6630).21 June 2013Response to a Request for Additional Information Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 TAC (ME6629 and ME6630).
AEP-NRC-2013-17, Response to a Request for Additional Information (RAI 29.01, 61, and 62) Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 8051 May 2013Response to a Request for Additional Information (RAI 29.01, 61, and 62) Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805
ML13085A24622 April 2013DC Cook Table V-1 & V-2 Record of Review March 22 2013
AEP-NRC-2013-09, Revised Response to First Round Request for Additional Information Re Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 8051 February 2013Revised Response to First Round Request for Additional Information Re Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805
AEP-NRC-2012-92, Response to Second Round Request for Additional Information Regarding Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 80515 October 2012Response to Second Round Request for Additional Information Regarding Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805
IR 05000315/20120032 August 2012IR 05000315-12-003, 05000316-12-003, 04/01/2012 - 06/30/2012, D.C. Cook Nuclear Power Plant, Units 1 & 2
AEP-NRC-2012-29, Response to Request for Additional Information Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 80527 April 2012Response to Request for Additional Information Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805
ML11188A14629 June 2011Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition. Without Attachments C, E, G, I & W
AEP-NRC-2010-39, Donald Cook, Units 1 & 2, Updated Final Response to Generic Letter 2004-02 and a June 2009 Request for Additional Information26 May 2010Donald Cook, Units 1 & 2, Updated Final Response to Generic Letter 2004-02 and a June 2009 Request for Additional Information
AEP-NRC-2009-45, License Amendment Request for One-Time Extension of Technical Specification Completion Times for Inoperable Train of Reactor Trip System and Engineered Safety Feature Actuation System17 July 2009License Amendment Request for One-Time Extension of Technical Specification Completion Times for Inoperable Train of Reactor Trip System and Engineered Safety Feature Actuation System
AEP-NRC-2008-17, Final Response to NRC Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors and Associated Request for Additional Information29 August 2008Final Response to NRC Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors and Associated Request for Additional Information
ML08252002821 May 2008Attachment 5 to AEP-NRC-2008-17, ALION-REP-AEP-4459-03, Revision 0, Summary Report for Impact of Chemical Effects on Containment Sump Strainer Head Loss - D. C. Cook Units 1 and 2
ML08077040429 February 2008AEP:NRC:8054-02, Attachment 5, Figure A5-41, Scotch 77 Fire Retardant Tape Test 1 Post-Test Picture to Attachment 7, Regulatory Commitments.
ML0734701406 December 2007DC Cook, Units 1 & 2, Request for Extension of Completion Date for Actions in Response to Generic Letter 2004-02, Potential Impact Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors.
ML07296017031 October 2007Public Meeting Summary on the Reactor Oversight Process
ML06186025727 June 2006Donald C. Cook, Unit 1 & 2, Update to Response to Nuclear Regulatory Commission Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors
ML06186025127 June 2006Donald C. Cook, Unit 1, Request for Extension of Completion Date for Unit 1 Actions in Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Rea
ML0603705479 February 2006Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors
ML05272003230 September 2005Licensing Amendments 291 and 273 Safety Evaluation Regarding Allowed Outage Time Extension for the Emergency Diesel Generators
ML0513804296 May 2005Remainder of Response to Request for Additional Information Regarding License Amendment Request to Extend the Allowed Outage Times for Emergency Diesel Generators, 69 Kv Offsite Power Circuit, Component Cooling Water..
ML05089031918 March 2005Partial Response to Request for Additional Information Re License Amendment Request to Extend the Allowed Outage Times for Emergency Diesel Generators, 69 Kv Offsite Power Circuit, Component Cooling Water.
ML04278047821 September 2004Extension of Allowed Outage Times for Emergency Diesel Generators, 69 Kv Offsite Power Circuit, Component Cooling Water, and Essential Service Water
ML03307018531 October 2003Application for Renewed Operating Licenses, Appendix E, Environmental Report
ML03307019031 October 2003Application for Renewed Operating Licenses, Appendix E, Environmental Report Appendices D - F
ML02338053627 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010)
ML02333045727 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010)
ML17326A07127 July 1999Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46.
ML17325B5897 May 1999Rev 5 to PMP 7200.RST.004, Expanded Sys Readiness Review Program.
ML17325B5814 May 1999LER 99-011-00:on 990407,air Sys for EDG Will Not Support Long Operability.Caused by Original Design Error.Temporary Mod to Supply Makeup Air Capability in Modes 5 & 6 Was Prepared