IR 05000397/2023002 | 1 August 2023 | Integrated Inspection Report 05000397/2023002 |
IR 05000397/2021002 | 2 August 2021 | Integrated Inspection Report 05000397/2021002 |
IR 05000397/2019002 | 1 August 2019 | Integrated Inspection Report 05000397/2019002 and 05000397/2019012 |
ML17355A667 | 31 December 2017 | Amendment 64 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML16292A872 | 3 November 2016 | Relief Request 4ISI-06, Use of Code Case N-666-1 on Socket Welded Connections Requiring Repair Due to Vibration Fatigue, Fourth 10-Year Inservice Inspection Interval |
GO2-16-128, Response to Request for Additional Information Related to Relief Request 4ISI-06 Regarding Code Case N-666-1 | 20 September 2016 | Response to Request for Additional Information Related to Relief Request 4ISI-06 Regarding Code Case N-666-1 |
ML16236A079 | 23 August 2016 | NRR E-mail Capture - Request for Additional Information, Columbia N-666-1, Relief Request 4ISI-06, Use of Code Case N-666-1 on Socket Welded Connections CAC MF7368 |
ML15355A496 | 21 December 2015 | Final Safety Analysis Report, Amendment 63, Chapter 3 - Design Criteria - Structures, Components, Equipment, and Systems, Table of Contents |
ML15355A509 | 21 December 2015 | Final Safety Analysis Report, Amendment 63, Chapter 9 - Auxiliary Systems |
IR 05000397/2015002 | 7 August 2015 | IR 05000397/20150002; on 04/01/2015 - 06/30/2015; Columbia Generating Station; Refueling and Other Outage Activities; Radiological Hazard Assessment and Exposure Controls; Occupational ALARA Planning and Controls; Event Follow-Up |
ML15219A143 | 7 August 2015 | IR 05000397/20150002; on 04/01/2015 - 06/30/2015; Columbia Generating Station; Refueling and Other Outage Activities; Radiological Hazard Assessment and Exposure Controls; Occupational ALARA Planning and Controls; Event Follow-Up |
IR 05000397/2015000 | 7 August 2015 | IR 05000397/20150002; on 04/01/2015 - 06/30/2015; Columbia Generating Station; Refueling and Other Outage Activities; Radiological Hazard Assessment and Exposure Controls; Occupational ALARA Planning and Controls; Event Follow-Up |
IR 05000397/2014007 | 25 April 2014 | IR 05000397-14-007; and 07200035-14-001; 03/24/2014 - 03/27/2014; Columbia Generating Station and Independent Spent Fuel Storage Installation; Routine ISFSI Inspection Report |
ML14010A297 | 30 December 2013 | Final Safety Analysis Report, Amendment 62, Chapter 3 - Design Criteria - Structures, Components, Equipment, and Systems, - Figure 3.6-21 Through Figure 3.12-4 |
ML14010A304 | 30 December 2013 | Final Safety Analysis Report, Amendment 62, Chapter 9 - Auxiliary Systems |
ML14010A295 | 30 December 2013 | Final Safety Analysis Report, Amendment 62, Chapter 3 - Design Criteria - Structures, Components, Equipment, and Systems, Table of Contents Through 3.5-46 |
ML12011A163 | 14 December 2011 | Amendment 61 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML12011A156 | 14 December 2011 | Amendment 61 to Final Safety Analysis Report, Chapter 3, Figure 3.6-16 Through 3.12-4 |
ML12011A154 | 14 December 2011 | Amendment 61 to Final Safety Analysis Report, Chapter 3, Design Criteria - Structures, Components, Equipment, and Systems |
GO2-09-134, Inservice Inspection Summary Report for Refueling Outage R-19 | 22 September 2009 | Inservice Inspection Summary Report for Refueling Outage R-19 |
GO2-07-141, Inservice Inspection Summary Report for Refueling Outage R-18 | 18 September 2007 | Inservice Inspection Summary Report for Refueling Outage R-18 |
GO2-05-196, Submittal of the Third Ten-Year Interval Inservice Inspection Program Plan and 10 CFR 50.55a Requests 3ISI-01 Through 3ISI-07 | 15 December 2005 | Submittal of the Third Ten-Year Interval Inservice Inspection Program Plan and 10 CFR 50.55a Requests 3ISI-01 Through 3ISI-07 |
GO2-03-040, Annual Operating Report 2002 | 27 February 2003 | Annual Operating Report 2002 |
IR 05000397/2002008 | 1 November 2002 | IR 05000397-02-008, 07200035-02-008, on 06/04/2002, 06/25-27/2002, 07/15-19/2002, 08/14-16/2002, 09/11-12/2002, 09/03-06/2002, & 09/13-20/2002, Columbia Generating Station |
ML17284A819 | 3 December 1998 | Forwards WNP-2 Feedwater Nozzle Insp Rept for R-13 Maint & Refueling Outage.Rept Submitted Pursuant to Commitments Made in Response to NUREG-0619, BWR Feedwater Nozzle & Control Rod Drive Return Line Nozzle Cracking. |
ML17284A749 | 10 September 1998 | WNP-2 Inservice Insp Summary Rept for Refueling Outage RF13 Spring,1998. |
ML17292B615 | 26 May 1998 | Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Nozzle Safe End. |
ML17292B208 | 2 January 1998 | Submits Commitments Made in Response to NUREG-0619,re BWR Feedwater Nozzle & CR Drive Return Line Nozzle Cracking. WNP-2 Feedwater Nozzle Insp Rept for R-12 Maintenance & Refueling Outage Attached |
ML17292B078 | 11 September 1997 | WNP-2 ISI Summary Rept for Refueling Outage RF12. |
IR 05000397/1997006 | 9 June 1997 | Insp Rept 50-397/97-06 on 970519-23.No Violations Noted. Major Areas Inspected:Insp Consisted of Review of Licensee Planned & Implemented Activities Associated W/Isi Program |
ML17292A511 | 12 September 1996 | WNP-2 ISI Summary Rept for Refueling Outage RFO11. |
ML17291B163 | 31 August 1995 | Technical Evaluation Rept on Second 10-yr Interval Inservice Insp Program Plan:Washington Public Power Supply Sys,Nuclear Project,Unit 2 |
ML17272B014 | 28 April 1993 | Amend 1 to Vols 1-3 of ISI Program Plan. |
ML17286B165 | 27 November 1991 | LER 91-030-00:on 911104,small Leak Noted in Welded Connection Between RHR Sys Drain Valve & RHR Loop a Shutdown Cooling Return Valve.Caused by Const Fabrication Defect.Rhr Valve V-161A Isolated from RCS.W/911127 Ltr |
Information Notice 1991-32, Possible Flaws in Certain Piping Systems Fabricated by Associated Piping and Engineering | 15 May 1991 | Possible Flaws in Certain Piping Systems Fabricated by Associated Piping and Engineering |
Information Notice 1991-05, Intergranular Stress Corrosion Cracking in Pressurized Water Reactor Safety Injection Accumulator Nozzles | 30 January 1991 | Intergranular Stress Corrosion Cracking in Pressurized Water Reactor Safety Injection Accumulator Nozzles |
ML17286A514 | 4 December 1990 | LER 90-028-00:on 901023,degradation of Primary Containment Pressure Boundary Caused Plant Shutdown,Due to Cracks on HPCS Small Bore Piping |
Information Notice 1990-29, Cracking of Cladding and Its Heat-Affected Zone in the Base Metal of a Reactor Vessel Head | 30 April 1990 | Cracking of Cladding and Its Heat-Affected Zone in the Base Metal of a Reactor Vessel Head |
Information Notice 1990-03, Malfunction of Borg-Warner Bolted Bonnet Check Valves Caused by Failure of the Swing Arm | 23 January 1990 | Malfunction of Borg-Warner Bolted Bonnet Check Valves Caused by Failure of the Swing Arm |
Information Notice 1987-64, Conviction for Falsification of Security Training Records | 22 December 1987 | Conviction for Falsification of Security Training Records |
ML20154A283 | 13 December 1986 | Forwards Assessments by Enforcement Staff of Regional Performance in Enforcement Area from Jul-Nov 1985 |
Information Notice 1985-97, Jail Term for Former Contractor Employee Who Intentionally Falsified Welding Inspection Records, Attachment 1 to NRC Information Notice 1986-054 | 26 December 1985 | Jail Term for Former Contractor Employee Who Intentionally Falsified Welding Inspection Records, Attachment 1 to NRC Information Notice 1986-054 |
Information Notice 1984-92, Cracking of Flywheels on Cummins Fire Pump Diesel Engines | 17 December 1984 | Cracking of Flywheels on Cummins Fire Pump Diesel Engines |
ML17277B422 | 30 May 1984 | Responds to Generic Ltr 84-11 Re Cracks in BWR Stainless Steel Piping.Response Addresses Scope & Schedule of Planned Insp,Qualifications of Examiners,Description of Surveillance Methods & Measures Taken When Cracks Discovered |
ML20198F587 | 20 March 1984 | SER Recommending Acceptance of Applicant Action Re Magnetic Particle Linear Indications on Containment Weld Pads |
ML20198E931 | 23 January 1984 | SER Recommending Applicant Actions Re Magnetic Particle Linear Indications on Containment Weld Pads |
ML20080N194 | 7 December 1983 | Excerpt from Qvp Overview Rept,Vol I,Book 1 of 1.Related Info Encl |
ML17277B066 | 3 November 1983 | Forwards Amend 33 to FSAR |
ML17277A865 | 26 September 1983 | Forwards Addl Info Re Containment Out-of Roundness Per NRC 830722 Meeting |
GO2-83-820, Final Deficiency Rept,Item 269 Re Bechtel Power Corp Repair of Wrong Weld Area.Initially Reported on 830705.Remaining Two Welds Qualified Per Class Ii,Ansi B31.1.Two Welds Successfully Repaired & Reradiographed | 9 September 1983 | Final Deficiency Rept,Item 269 Re Bechtel Power Corp Repair of Wrong Weld Area.Initially Reported on 830705.Remaining Two Welds Qualified Per Class Ii,Ansi B31.1.Two Welds Successfully Repaired & Reradiographed |