Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML20332A1597 December 2020Documentation of Completion of Required Actions Taken in Response to Lessons Learned from the Fukushima Dai-Ichi Accident
ML21210A13430 September 20202 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations(Epid L-2020-LRO-0076) - Redacted
ML20076A57628 May 2020Staff Assessment of Flood Hazard Focused Evaluation and Integrated Assessment
ML15174A2571 September 2015Letter to Licensees Coordination of Request for Information for Flooding Hazard Reevaluations and Mitigating Strategies for Beyond-Design-Basis External Events
ML14111A1479 May 2014Seismic Screening and Prioritization Results Regarding Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights
ML14030A04620 February 2014Letter from Eric J. Leeds Supplemental Information Related to Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1
ML13044A5611 March 2013Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Re Flooding Hazard Reevaluation for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
ML12054A73512 March 2012Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
ML12054A67912 March 2012Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation
ML12056A04512 March 2012Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
ML12056A04412 March 2012Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status
NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status12 March 2012Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status
NRC-2012-0068, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events12 March 2012Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
ML11210178128 July 2011Update of Nuclear Regulatory Commission (NRC) Distribution List for Documents Containing Safeguards (Sgi), Official Use Only (Ouo), and Routine Information (Surry Power Station)
CY-92-223, G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 197114 July 2011G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 1971
ML10214038730 July 2010Nuclear Regulatory Commission Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations - Publication Date of August 10, 2010
L-09-081, Comment (55) of C.L. Funderburk on Behalf of Dominion Resources Services, Inc., on Proposed Rule Pr 31, Regarding Limiting the Quantitiy of Byproduct Material in a Generally Licensed Device28 October 2009Comment (55) of C.L. Funderburk on Behalf of Dominion Resources Services, Inc., on Proposed Rule Pr 31, Regarding Limiting the Quantitiy of Byproduct Material in a Generally Licensed Device
RIS 2003-08, Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure30 April 2003
7 November 2005
3 April 2008
Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
RIS 2003-08, Protection of Safeguards Information from Unauthorized Disclosure30 April 2003
7 November 2005
3 April 2008
Protection of Safeguards Information from Unauthorized Disclosure
2005/04/30-NRC Regulatory Issue Summary 2003-08 Protection of Safeguards Information from Unauthorized Disclosure
Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
ML02301048019 September 2002Part 2 of 7 - GE BWR/4 Advanced Course R-504B
ML02301059719 September 2002Part 5 of 7 - GE BWR/4 Advanced Course R-504B
ML0221802205 August 200207/23/2002, Summary of License Renewal Meeting Between NRC Staff, Nuclear Energy Inst. (NEI) & Utilities to Discuss Status of License Renewal Activities
IR 05000280/200100827 March 2002Reply to Denial of Non-Cited Violation - NRC Inspection Report 50-280/01-08, 50-281/01-08 & Reply to Claim of Backfit
ML02017048617 January 2002Reply to Non-Cited Violation NRC Inspection Report No. 50-280/01-08 and 50-281/01-08; and Reply to Claim of Backfit
ML03111044913 October 1999Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes
RIS 1999-02, Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes13 October 1999Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes
NRC Generic Letter 1983-1124 June 1999NRC Generic Letter 1983-011, Supplement 1: Licensee Qualification for Performing Safety Analysis
NRC Generic Letter 1998-0114 January 1999NRC Generic Letter 1998-001, Supplement 1: Year 2000 Readiness of Computer Systems at Nuclear Power Plants
NRC Generic Letter 1998-0414 July 1998NRC Generic Letter 1998-004: Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material i
NRC Generic Letter 1998-0228 May 1998NRC Generic Letter 1998-002: Loss of Reactor Coolant Inventory and Associated Potential for Loss of Emergency Mitigation Functions While in a Shutdown Condition
NRC Generic Letter 1997-0630 December 1997NRC Generic Letter 1997-006: Degradation of Steam Generator Internals
NRC Generic Letter 1997-0517 December 1997NRC Generic Letter 1997-005: Steam Generator Tube Inspection Techniques
NRC Generic Letter 1997-0430 September 1997NRC Generic Letter 1997-004: NRC Staff Approval for Changes to 10 CFR Part 50, Appendix H, Reactor Vessel Surveillance Specimen Withdrawal Schedules
NRC Generic Letter 1997-0215 May 1997NRC Generic Letter 1997-002: Revised Contents of Monthly Operating Report
ML18153A51028 March 1997Provides Response to NRC RAI Re Provision of Emergency Power to Spent Fuel Pool Cooling Pumps.Commitments, Submitted
ML20137R27927 March 1997Twentieth Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App FF
Information Notice 1997-04, Implementation of a New Constraint on Radioactive Air Effluents24 February 1997Implementation of a New Constraint on Radioactive Air Effluents
NRC Generic Letter 1995-0631 January 1997NRC Generic Letter 1995-006: Changes in Operator Licensing Program
ML18153A63627 November 1996Submits Corrected Response to Issue of Providing Emergency Power to Spent Fuel Pool Cooling Pumps
ML18153A63121 November 1996Discusses Actions to Be Taken to Restore Cooling to Spent Fuel Pool in Event of Loss of Offsite Power.Commitments Encl
NRC Generic Letter 1996-0518 September 1996NRC Generic Letter 1996-005: Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves
NRC Generic Letter 1996-0426 June 1996NRC Generic Letter 1996-004: Boraflex Degradation in Spent Fuel Pool Storage Racks
NRC Generic Letter 1996-0331 January 1996NRC Generic Letter 1996-003: Relocation of the Pressure Temperature Limit Curves & Low Temperature Overpressure Protection System Limits
NRC Generic Letter 1989-1024 January 1996NRC Generic Letter 1989-010, Supplement 7: Consideration of Valve Mispositioning in Pressurized-Water Reactors
NRC Generic Letter 1996-0110 January 1996NRC Generic Letter 1996-001: Testing of Safety-Related Logic Circuits
NRC Generic Letter 1995-1015 December 1995NRC Generic Letter 1995-010: Relocation of Selected Technical Specifications Requirements Related to Instrumentation
NRC Generic Letter 1995-0717 August 1995NRC Generic Letter 1995-007: Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves
NRC Generic Letter 1995-0428 April 1995NRC Generic Letter 1995-004: Final Disposition of the Systematic Evaluation Program Lesson-Learned Issues
ML18153A73028 April 1995Comment Supporting Proposed GL Re Pressure Locking & Thermal Binding of safety-related power-operated Gate Valves
ML20137R95222 March 1995Informs That Plant Performance Review of Listed Plants Was Held on 950316