Issue date | Title | |
---|---|---|
ML21361A209 | 20 December 2021 | Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML21307A198 | 28 October 2021 | 2 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML20219A129 | 17 August 2020 | Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai Ichi Accident |
ML19028A030 | 11 April 2019 | FENOC - Beaver Valley Power Station, Unit 1 & 2; Davis-Besse Nuclear Power Station Unit 1; and Perry Nuclear Power Plant Unit 1 - Approval of Certified Fuel Handler Training and Retraining Program |
ML15307A349 | 23 February 2016 | Issuance of Amendment Concerning Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control (CAC No. MF3720) (L-14-106) |
ML15174A257 | 1 September 2015 | Letter to Licensees Coordination of Request for Information for Flooding Hazard Reevaluations and Mitigating Strategies for Beyond-Design-Basis External Events |
ML14111A147 | 9 May 2014 | Seismic Screening and Prioritization Results Regarding Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights |
ML14030A046 | 20 February 2014 | Letter from Eric J. Leeds Supplemental Information Related to Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 |
L-13-306, Request for Licensing Action Pursuant to 10 CFR 50.59. 50.67. and 50.90: Full Implementation of Alternative Accident Source Term Design Basis Accident Analyses. and an Associated Technical Specification Change | 6 December 2013 | Request for Licensing Action Pursuant to 10 CFR 50.59. 50.67. and 50.90: Full Implementation of Alternative Accident Source Term Design Basis Accident Analyses. and an Associated Technical Specification Change |
ML13044A561 | 1 March 2013 | Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Re Flooding Hazard Reevaluation for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident |
ML12054A735 | 12 March 2012 | Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events |
ML12054A679 | 12 March 2012 | Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation |
ML12056A045 | 12 March 2012 | Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events |
ML12056A044 | 12 March 2012 | Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status |
NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status | 12 March 2012 | Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status |
NRC-2012-0068, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | 12 March 2012 | Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events |
ML090860065 | 28 January 2009 | 01/23/09 & 01/28/09 Summary of Telecons Between NRC Staff and Prairie Island License Review Project |
ML052510599 | 7 September 2005 | EA-05-167, EA-05-168, Firstenergy Nuclear Operating Co, Perry Nuclear Power Plant, Response to Disputed Violations |
ML052210515 | 8 August 2005 | Denial of Non-cited Violations Contained in NRC Inspection Report 05000400/2005003 |
ML023610200 | 9 December 2002 | License Amendment Request Pursuant to 10 CFR 50.90: Alternative Source Term Update of Design Basis Analysis for Fuel Handling Accident |
L-02-041, Annual Financial Reports & Certified Financial Statements for Perry Nuclear Power Plant, Davis-Besse Nuclear Power Station & Beaver Valley Power Station | 24 April 2002 | Annual Financial Reports & Certified Financial Statements for Perry Nuclear Power Plant, Davis-Besse Nuclear Power Station & Beaver Valley Power Station |
ML031110449 | 13 October 1999 | Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes |
RIS 1999-02, Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes | 13 October 1999 | Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes |
NRC Generic Letter 1983-11 | 24 June 1999 | NRC Generic Letter 1983-011, Supplement 1: Licensee Qualification for Performing Safety Analysis |
ML20205P437 | 15 April 1999 | Safety Evaluation Concluding That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking or Thermal Binding |
ML20203A521 | 27 January 1999 | Safety Evaluation Accepting Licensee Calculations Showing That Adequate NPSH Will Be Available for HPCS Pumps |
NRC Generic Letter 1998-01 | 14 January 1999 | NRC Generic Letter 1998-001, Supplement 1: Year 2000 Readiness of Computer Systems at Nuclear Power Plants |
PY-CEI-NRR-2352, Suppl to 980909 LAR to License NPF-58,improving Licensing & Design Basis for Isolation of Feedwater Penetrations, Including Sensitivity Study Performed to Examine Radiological Significance of Leakage Through FW Sys Cvs | 6 January 1999 | Suppl to 980909 LAR to License NPF-58,improving Licensing & Design Basis for Isolation of Feedwater Penetrations, Including Sensitivity Study Performed to Examine Radiological Significance of Leakage Through FW Sys Cvs |
PY-CEI-NRR-2322, Application for Amend to License NPF-58,stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Valves Need Not Be Included in Test Program | 9 September 1998 | Application for Amend to License NPF-58,stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Valves Need Not Be Included in Test Program |
NRC Generic Letter 1998-04 | 14 July 1998 | NRC Generic Letter 1998-004: Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material i |
NRC Generic Letter 1998-02 | 28 May 1998 | NRC Generic Letter 1998-002: Loss of Reactor Coolant Inventory and Associated Potential for Loss of Emergency Mitigation Functions While in a Shutdown Condition |
ML003708964 | 20 April 1998 | Annual Financial Reports and Certified Financial Statements for the Perry Nuclear Power Plant (Docket Number 50-440) and the Davis-Besse Nuclear Power Station (Docket Number 50-346) |
PY-CEI-NRR-2269, Comment on Proposed Rule 10CFR50.NRC Should Demonstrate That Not Only Is Code Process Flawed,But That Proposed Change Justified from Cost Versus Safety Protective | 3 April 1998 | Comment on Proposed Rule 10CFR50.NRC Should Demonstrate That Not Only Is Code Process Flawed,But That Proposed Change Justified from Cost Versus Safety Protective |
NRC Generic Letter 1997-06 | 30 December 1997 | NRC Generic Letter 1997-006: Degradation of Steam Generator Internals |
NRC Generic Letter 1997-05 | 17 December 1997 | NRC Generic Letter 1997-005: Steam Generator Tube Inspection Techniques |
NRC Generic Letter 1997-04 | 30 September 1997 | NRC Generic Letter 1997-004: NRC Staff Approval for Changes to 10 CFR Part 50, Appendix H, Reactor Vessel Surveillance Specimen Withdrawal Schedules |
ML20198L524 | 23 September 1997 | Insp Rept 50-440/97-08 on 970721-0827.Violations Noted. Major Areas Inspected:Unresolved Items & Insp follow-up Items Identified by Design Insp Conducted from 970127-0327 |
NRC Generic Letter 1997-02 | 15 May 1997 | NRC Generic Letter 1997-002: Revised Contents of Monthly Operating Report |
Information Notice 1997-04, Implementation of a New Constraint on Radioactive Air Effluents | 24 February 1997 | Implementation of a New Constraint on Radioactive Air Effluents |
NRC Generic Letter 1995-06 | 31 January 1997 | NRC Generic Letter 1995-006: Changes in Operator Licensing Program |
NRC Generic Letter 1996-05 | 18 September 1996 | NRC Generic Letter 1996-005: Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves |
ML20115J983 | 30 June 1996 | Individual Plant Examination of External Events for Severe Accident Vulnerabilities for Pnpp |
NRC Generic Letter 1996-04 | 26 June 1996 | NRC Generic Letter 1996-004: Boraflex Degradation in Spent Fuel Pool Storage Racks |
NRC Generic Letter 1996-03 | 31 January 1996 | NRC Generic Letter 1996-003: Relocation of the Pressure Temperature Limit Curves & Low Temperature Overpressure Protection System Limits |
NRC Generic Letter 1989-10 | 24 January 1996 | NRC Generic Letter 1989-010, Supplement 7: Consideration of Valve Mispositioning in Pressurized-Water Reactors |
NRC Generic Letter 1996-01 | 10 January 1996 | NRC Generic Letter 1996-001: Testing of Safety-Related Logic Circuits |
ML20101B000 | 3 January 1996 | Questions Re post-LOCA ECCS Strainer Blockage & Insulation Problem |
NRC Generic Letter 1995-10 | 15 December 1995 | NRC Generic Letter 1995-010: Relocation of Selected Technical Specifications Requirements Related to Instrumentation |
NRC Generic Letter 1995-07 | 17 August 1995 | NRC Generic Letter 1995-007: Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves |
NRC Generic Letter 1995-04 | 28 April 1995 | NRC Generic Letter 1995-004: Final Disposition of the Systematic Evaluation Program Lesson-Learned Issues |