Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
05000382/LER-2017-00218 September 2017Automatic Reactor Scram due to the Failure of Fast Bus Transfer Relays to Automatically Transfer Station Loads to Off- Site Power on a Main Generator Trip
LER 17-002-00 for Waterford, Unit 3, Regarding Automatic Reactor Scram due to the Failure of Fast Bus Transfer Relays to Automatically Transfer Station Loads to Off-Site Power on a Main Generator Trip
Safe Shutdown
05000382/LER-2017-0014 May 20171 of 5
LER 17-001-00 for Waterford, Unit 3 Regarding Both Trains of Emergency Core Cooling System Inoperable due to Inadvertently Performing Maintenance on Train 'B' Resulting in Event or Condition that Could Have Prevented Fulfillment of a Safety Function
Boric Acid
Time of Discovery
Stroke time
05000382/LER-2016-00230 November 2016Both Trains of Essential Services Chilled Water Inoperable due to Failing to Maintain Exiting Chilled Water Temperature in Specification Resulting in Event or Condition that Could Have Prevented Fulfillment of a Safety Function
LER 16-002-01 for Waterford, Unit 3, Regarding Both Trains of Essential Services Chilled Water Inoperable Due to Failing to Maintain Exiting Chilled Water Temperature in Specification Resulting in Event or Condition That Could Have Prevented...
Grace period
05000382/LER-2016-0011 September 2016Incorrect Core Protection Calculator Addressable Constant Entered Because of Inadequate Procedure Resulting in a Condition Prohibited by Technical Specifications
LER 16-001-00 for Waterford, Unit 3, Regarding Incorrect Core Protection Calculator Addressable Constant Entered Because of Inadequate Procedure Resulting in a Condition Prohibited by Technical Specifications
Safe Shutdown
Time of Discovery
Anticipated operational occurrence
Power change
W3F1-2013-0007, Special Report SR 13-001-00 Fuel Handling Building Wide Range Gas Radiation Monitor PRMIR3032 Inoperable for Greater than 7 Days24 January 2013Special Report SR 13-001-00 Fuel Handling Building Wide Range Gas Radiation Monitor PRMIR3032 Inoperable for Greater than 7 Days
W3F1-2012-0075, Submittal of Special Report SR-12-001-00, Primary Met. Tower Upper Level Wind Speed Instrument Inoperable for Greater than 7 Days17 September 2012Submittal of Special Report SR-12-001-00, Primary Met. Tower Upper Level Wind Speed Instrument Inoperable for Greater than 7 Days
ML06118013327 August 2005Event Number 41954
ML06118013224 August 1992Event Number 24112