Semantic search
Jump to navigation
Jump to search
Start date | Title | Topic | |
---|---|---|---|
05000250/FIN-2017003-02 | 30 September 2017 23:59:59 | Inadequate Operator Fundamentals during Diesel Driven Fire Pump Surveillance Testing | |
05000250/FIN-2017003-03 | 30 September 2017 23:59:59 | Inadequate Maintenance Rule (a)(4) Risk Assessment for the High Head Safety Injection Pumps | Incremental Core Damage Probability Deficit |
05000250/FIN-2016003-03 | 30 September 2016 23:59:59 | Improper ECC Fuse Installation | |
05000250/FIN-2014005-01 | 31 December 2014 23:59:59 | Non-Compliance with HRA Entry Requirements | High Radiation Area Substantial potential for an overexposure |
05000250/FIN-2013002-02 | 31 March 2013 23:59:59 | Noncompliance with Radiological Barrier | High Radiation Area Substantial potential for an overexposure |
05000250/FIN-2012004-01 | 30 September 2012 23:59:59 | Operation at power with Unit 3 feedwater flow transmitter connected incorrectly | Significance Determination Process |
05000250/FIN-2011003-01 | 30 June 2011 23:59:59 | Failure to properly perform a procedure results in damage to an RHR pump | |
05000250/FIN-2011002-01 | 31 March 2011 23:59:59 | Failure to Monitor a Reactivity Change Results in Power Operation Above 100 Percent | |
05000250/FIN-2009003-01 | 30 June 2009 23:59:59 | Failure to Implement Procedures for Conducting a Valve Alignment Causes Spill of Reactor Coolant And Contamination Of a Plant Employee | |
05000250/FIN-2009003-02 | 30 June 2009 23:59:59 | Failure to Implement TS Requirements Resulting From Loss of Configuration Control of the 3C Main Steam Isolation Valve | Stroke time |
05000250/FIN-2007004-02 | 30 September 2007 23:59:59 | Inappropriate Blanket Overtime Authorization |