Semantic search

Jump to navigation Jump to search
 Start dateTitleTopic
05000237/FIN-2014008-0130 June 2014 23:59:59Inadequate Applicability Reviews of Configuration Changes for De-Energizing Safety-Related ValvesMultiple Spurious Operation
Fire Protection Program
05000237/FIN-2014007-0131 March 2014 23:59:59Failure to Adequately Incorporate GE Operating Experience into Vendor ManualSignificance Determination Process
05000237/FIN-2011005-0131 December 2011 23:59:59Bus 23 Pot Fuse Drawer Resulting in the Inoperability of the Control Room Emergency Ventilation Air Condition System
05000237/FIN-2011003-0730 June 2011 23:59:59Change In Unit 2 Reactor Water Level Due To A Failure To Follow ProcedureSignificance Determination Process
05000237/FIN-2011002-0731 March 2011 23:59:59Dresden 3B Circulating Water Pump Bearing Failure Due to Low Oil Level
05000237/FIN-2010005-0231 December 2010 23:59:59Failure to Perform Magnetic Particle Examination on the 3/2/1501-20/20-10 U3 LPCI Support in Accordance with ProceduresNon-Destructive Examination
05000237/FIN-2009005-0131 December 2009 23:59:59Operating Personnel Incorrectly Placed Clearance TagsSignificance Determination Process
05000237/FIN-2009005-0231 December 2009 23:59:59NRC Inspector-Identified Control Room Alarm Isolation Valve Out-of-PositionSignificance Determination Process
05000237/FIN-2009005-0531 December 2009 23:59:59Failure to Follow the Master Refueling Procedure During Movement of Fuel Assembly JLU569Shutdown Margin
Probabilistic Risk Assessment
Significance Determination Process
Fuel cladding
05000237/FIN-2009003-0330 June 2009 23:59:59Instrument Air Isolation Valve Mispositioning on April 26, 2009Significance Determination Process
05000237/FIN-2009002-0531 March 2009 23:59:59Operator Performed an Incorrect Response to an Unexpected Alarm in the Control Room