Semantic search
Jump to navigation
Jump to search
Start date | Title | Topic | |
---|---|---|---|
05000237/FIN-2014008-01 | 30 June 2014 23:59:59 | Inadequate Applicability Reviews of Configuration Changes for De-Energizing Safety-Related Valves | Multiple Spurious Operation Fire Protection Program |
05000237/FIN-2014007-01 | 31 March 2014 23:59:59 | Failure to Adequately Incorporate GE Operating Experience into Vendor Manual | Significance Determination Process |
05000237/FIN-2011005-01 | 31 December 2011 23:59:59 | Bus 23 Pot Fuse Drawer Resulting in the Inoperability of the Control Room Emergency Ventilation Air Condition System | |
05000237/FIN-2011003-07 | 30 June 2011 23:59:59 | Change In Unit 2 Reactor Water Level Due To A Failure To Follow Procedure | Significance Determination Process |
05000237/FIN-2011002-07 | 31 March 2011 23:59:59 | Dresden 3B Circulating Water Pump Bearing Failure Due to Low Oil Level | |
05000237/FIN-2010005-02 | 31 December 2010 23:59:59 | Failure to Perform Magnetic Particle Examination on the 3/2/1501-20/20-10 U3 LPCI Support in Accordance with Procedures | Nondestructive Examination |
05000237/FIN-2009005-01 | 31 December 2009 23:59:59 | Operating Personnel Incorrectly Placed Clearance Tags | Significance Determination Process |
05000237/FIN-2009005-02 | 31 December 2009 23:59:59 | NRC Inspector-Identified Control Room Alarm Isolation Valve Out-of-Position | Significance Determination Process |
05000237/FIN-2009005-05 | 31 December 2009 23:59:59 | Failure to Follow the Master Refueling Procedure During Movement of Fuel Assembly JLU569 | Shutdown Margin Probabilistic Risk Assessment Significance Determination Process Fuel cladding |
05000237/FIN-2009003-03 | 30 June 2009 23:59:59 | Instrument Air Isolation Valve Mispositioning on April 26, 2009 | Significance Determination Process |
05000237/FIN-2009002-05 | 31 March 2009 23:59:59 | Operator Performed an Incorrect Response to an Unexpected Alarm in the Control Room |