Semantic search

Jump to navigation Jump to search
 QuarterSiteTitleTopic
05000354/FIN-2018403-012018Q3Hope CreekSecurity
05000354/FIN-2018003-022018Q3Hope CreekInadequate Procedures for Restoration of the A Reactor Feed Pump Turbine Following Maintenance
05000247/FIN-2018003-012018Q3Indian PointInadequate Procedural Guidance for Spent Fuel Movement and Storage Requirements
05000443/FIN-2018411-022018Q2SeabrookSecurity
05000333/FIN-2018411-012018Q2FitzPatrickSecurity
05000443/FIN-2017004-022017Q4SeabrookFailure of Exercise Critique to Identify a RSPSWeaknessSignificance Determination Process
05000423/FIN-2017001-022017Q1MillstoneChange of C Charging Pump Testing Requirements Contrary to ASME OMSignificance Determination Process
05000293/FIN-2016011-112017Q1PilgrimFailure to Adequately Develop and Implement Targeted Performance Improvement PlansSignificance Determination Process
05000244/FIN-2016002-012016Q2GinnaIncorrect Emergency Action Level TableSignificance Determination Process
Preliminary White Finding
05000353/FIN-2016001-052016Q1LimerickMain Turbine Digital Electrohydraulic Control System Modification Failed to Revise the Plant Startup ProcedureSignificance Determination Process
05000311/FIN-2016001-022016Q1SalemInadequate Digital Feedwater Design Change Evaluation
05000387/FIN-2015003-012015Q3SusquehannaRHR Shutdown Cooling Procedure Not Maintained Consistent with Technical Specification Requirements
05000277/FIN-2015001-012015Q1Peach BottomFailure to Scope Flood Detection Level Switches into the MR
05000244/FIN-2015001-022015Q1GinnaInadequate Protective Action Recommendation FlowchartSignificance Determination Process
05000423/FIN-2014005-022014Q4MillstoneFailure to Manage Risk of RSST TestingReserve Station Service Transformer
Significance Determination Process
05000388/FIN-2014008-012014Q3SusquehannaInadequately Maintained Procedures for Plant Shutdown to Hot Standby led to Reactor Water Level and Power TransientsReactor Vessel Water Level
Significance Determination Process
05000387/FIN-2014009-022014Q2SusquehannaFailure to Conduct Timely Initial Operability DeterminationsEnforcement Discretion
Significance Determination Process
05000317/FIN-2014003-032014Q2Calvert CliffsInadequate EAL Initiating Condition HA3.1Significance Determination Process
05000333/FIN-2014403-012014Q1FitzPatrickSecurity