ENS 57021Hatch11 March 2024 17:37:00Manual Reactor Trip
ENS 56975Hatch18 February 2024 16:33:00Fitness for DutyFitness for Duty
ENS 56959Hatch11 February 2024 15:11:00Primary Containment Degraded
ENS 56896Hatch18 December 2023 07:23:00High Pressure Coolant Injection System Inoperable
ENS 56897Hatch2 November 2023 01:11:0060 Day Notification for an Invalid Specified System Actuation
ENS 56826Hatch1 November 2023 10:48:00Manual Reactor Trip Due to Trip of Reactor Feed Pump
ENS 56779Vogtle7 August 2023 18:39:0060-DAY Optional Telephonic Notification for an Invalid Specified System Actuation
ENS 56648Vogtle31 July 2023 19:06:00Failed Fitness for Duty TestFitness for Duty
ENS 56632Vogtle21 July 2023 15:48:00Automatic Reactor Trip
ENS 56614Vogtle9 July 2023 17:28:00Automatic Reactor Trip
ENS 56497Vogtle2 May 2023 08:23:00Manual Reactor Trip
ENS 56460Vogtle10 April 2023 04:48:00Automatic Reactor Trip
ENS 56446Hatch31 March 2023 18:32:00Manual Reactor Scram and Automatic Actuation of Containment Isolation Valves (Civs)
ENS 56415Vogtle16 March 2023 12:45:00Failed FITNESS-FOR-DUTY (FFD) Test
ENS 56414Vogtle16 March 2023 01:57:00Automatic Reactor Trip
ENS 56367Vogtle16 February 2023 12:43:00Failed Fitness for Duty TestFitness for Duty
ENS 56342Hatch7 February 2023 22:38:00Primary Containment Degraded
ENS 56311Vogtle14 January 2023 12:21:00Manual Actuation of Reactor Protection System (RPS)
ENS 56294Vogtle4 January 2023 03:59:00Loss of Offsite Power Source
ENS 56231Vogtle17 November 2022 15:09:00Fitness for Duty ReportFitness for Duty
ENS 56175Vogtle23 October 2022 08:05:00Stage Four Automatic Depressurization System (ADS) Inoperable
ENS 56147Vogtle6 October 2022 06:44:00Automatic Actuation of Reactor Protection System (RPS)
ENS 56115Vogtle17 September 2022 02:57:00Fitness for Duty (FFD) ReportFitness for Duty
ENS 56114Vogtle17 September 2022 02:57:00Fitness for Duty (FFD) ReportFitness for Duty
ENS 56113Hatch17 September 2022 02:57:00Fitness for Duty (FFD) ReportFitness for Duty
ENS 55875Vogtle3 May 2022 19:41:00Manual Reactor Trip and Automatic Actuation of Auxiliary Feedwater System
ENS 55735Vogtle7 February 2022 14:14:00Fitness for Duty ReportFitness for Duty
ENS 55679Hatch29 December 2021 20:52:00Manual Reactor Trip and Automatic Actuation of Containment Isolation Valves
ENS 55552Vogtle29 October 2021 14:10:00Contractor Supervisor FITNESS-FOR-DUTY Failure
ENS 55448Hatch8 September 2021 05:59:00Unit 1 High Pressure Coolant Injection (HPCI) System Inoperable
ENS 55420Hatch20 August 2021 12:43:00Fitness for Duty ReportFitness for Duty
ENS 55394Hatch3 August 2021 14:26:00Automatic Reactor Trip
ENS 55328Vogtle24 June 2021 04:00:0010 Cfr 50.55(E) Report Regarding Electrical Construction and Measuring and Test Equipment Control
ENS 55303Hatch11 June 2021 21:10:00Technical Specificiation Required Shutdown
ENS 55185Vogtle9 April 2021 18:05:00Fitness for Duty ReportFitness for Duty
ENS 55188Hatch18 February 2021 03:20:00Automatic Actuation of Group 2 Containment Isolation Logic
ENS 55187Hatch13 February 2021 03:23:00Automatic Actuation of Group I Containment Isolation Logic
ENS 55055Vogtle3 January 2021 11:45:00Nonfunctional Seismic Monitoring SystemEarthquake
ENS 54995Vogtle12 November 2020 22:32:00Automatic Reactor Trip Due to Turbine Trip
ENS 54963Vogtle19 October 2020 08:00:00Update to Acceptance Criteria for Itaac
ENS 54864Vogtle26 August 2020 04:00:00Design Change Altered Basis for ITAAC
ENS 54776Vogtle13 July 2020 12:31:00Supervisor Failed Fitness for Duty TestFitness for Duty
ENS 54677Hatch22 April 2020 14:15:00High Pressure Coolant Injection System (Hpci) Inoperable
ENS 54650Vogtle8 April 2020 12:42:00Fitness-For-Duty - Licensed Supervisor Confirmed Positive for Alcohol
ENS 54596Vogtle21 March 2020 20:44:00Automatic Actuation of the 1B Emergency Diesel Generator
ENS 54491Hatch22 January 2020 01:05:00Fitness for Duty (Ffd) Issue Involving Contract PersonnelFitness for Duty
ENS 54463Hatch4 January 2020 16:09:00Primary Containment Degraded
ENS 54359Vogtle29 October 2019 13:09:00Fitness for Duty - Contract Supervisor Failed Random TestFitness for Duty
ENS 54318Vogtle9 October 2019 14:23:00Automatic Start of Emergency Diesel Generator and Auxilliary Feedwater System
ENS 54237Hatch23 August 2019 02:34:00High Pressure Coolant Injection (Hpci) System Inoperable