Arkansas Nuclear One After Action Report/

Improvement Plan Exercise Date - August 17, 2016 Radiological Emergency Preparedness (REP) Program

~~

- Published October 13, 2016

I I This page is intentionally blank.

I I

I I

I I

.I

1
1

!I I

I I

I I

I I

Unclassified

  • Radiological Emergency: Preparedness Program: (REP)

I After Action Report/Improvement Plan Arkansas Nuclear One I

Arkansas Nuclear One > r.', l .,

I After A~.tim1 Rt:?nort/Improvement Plan '* ,, '*

I Contents }:1.**,.  ;,,

I Executive Summary 4 Section 1: Exercise Overview

.*.. *, ,. .ii**

' * * ~. *

' l '

5 I

1.1 Exercise Details 1.2 Exercise Planning Team Leadership 5

5 I

1.3 Participating Organizations

~ . .: ,'

7 I Section 2: Exercise Design Summary 9 2.1 Exercise Purpose and Design 9 I 2.2 Exercise Objectives, Capabjlities and Activities. 9 2.3 Scenario Summary 9 I

.Section 3: Analysis of Capabilities 3 .1 Exercise Evaluation and Results

',.;.}

10 10 I

3 .2 Summary Results of Exercise Evaluation 10 I

3 .3 Criteria Evaluation Summaries 11 I

  • - . : ; t *. ~ '. .

3 .3 .1 Arkansas Jurisdictions 13 3.3.1.1 Arkansas State Emergency Operations Center 13 3.3.1.2 Arkansas Department of Health, Little Rock 13 I Emergency Communications Center 3.3.1.3 Arkansas Department of Health and Emergency 13 I

News Center at the State Emergency Operations Facility 3.3.1.4 Arkansas Field Radiological Monitoring Team One 14 I

3 .3 .1.5 Arkansas Field Radiological Monitoring Team Two 14 I 1

I I!

I Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Arkansas Nuclear One I

3.3.1.6 Alternate Joint Information Center 14 I 3.3.2 Risk Jurisdictions , ; 15

  • 3 .3 .2.1 Johnson County :Eniergen~y Opet~tions t~riter 'and "* 15 I Traffic/Access Control Point I 3.3.2.2 Logan County Emergency Operations Center and Traffic/Access Control Point . ./

15

'*.;* . *r  :-

I 3 .3 .2.3 Pope County Emergency Operations Center 15 and Traffic/Access Control Point I 3.3.2.4 Yell County Emergency Operations Center i _ .t ; '. _; *_.

16 and Traffic/Access Control i>~i~t ' .

I 3 .3 .4 Private Organizations

.. ~ '

16 3 .3 .4.1 ENS Radio Station KXRJ 16 I 3.3.5 Federal Jurisdictions 17

.. "\ ., *.,:* ....

I Section 4: Conclusion 3.3.5.1 NOAA North Littl~ Rock 17 18 I

Appendix A: Improvement Plan 19

.} .* _) ~* -~ **::f ., .

Appendix B: Exercise Timeline 20 I Appendix C: Exercise Evaluators and Team Leaders 22.

Appendix D: Acronyms and Abbreviations 23 I Appendix E: Exercise Plan 25

    • .. *\ \

I . *, . ~. *:..

I

,1* '~

I . -1. *i

  • L *\**

I I 2 I

.Unclassified R-adio!ogical Emergency Preparedness.Program (REP)

I After Action Report/Improvement Plan Arkansas Nuclear One I

,,:~ r. . ~.

    • ! ',. *f Tb.is page *is intentionally blallk. I I

) *~

'  : ~{

'l '}

. , .... *;l i*,:

I!.

I.

. 'l I

!f[.

I

  • , . .,
  • 1,* ....i *1',. . ('} i\_  ;.

I

~ ' .  :,_, ". : . *.. j i I

.~ : .,\ : _: .:  ;'_. ; .

I

    • . (]- ..,

,... '. Jii: ' . ,.-.. *.

I

~ ~~

'.; i :§ ** ' *. > * * ~

! i ~-*

' 1 ~. '

fT

..) ~-*-* t*. .'I I

I

-, .. _. ... : t* ~~ _., ; i .. 1 *

, '~ :,. } * .> I , ' : ~* ':*'

I I

I I

3 I

I Unclassified Radiological Emergency Preparedness Program (REP)

I After Action Report/Improvement Plan Arkansas Nuclear One EXECUTIVE

SUMMARY

I i'*"*

On August 17, 2016, a biennial Radiological Emergency Preparedness (REP) exercise was conducted in the plume exposure pathway emergency planning zone (EPZ) around Arkansas I Nuclear One (ANO) located near Russellville, Pope County, Arkansas. The U.S. Department of Homeland Security/Federal Emergency Management Agency (DHS/FEMA) Region VI I evaluated the exercise. The purpose was to assess the level of preparedness of state and local responders to react to a simulated radiological emergency at ANO. This exercise was held in accordance with DHS/FEMA policies and guidance concerning the implementation of state and I local radiological emergency preparedness plans and procedures.

I The previous exercise at this site was a Hostile Action Based Exercise conducted on September 17, 2014. The qualifying emergency preparedness exercise was conducted on October 1, 1980.

There have been twenty-four evaluated exercises, including the exercise on August 17, 2016, I plus numerous drills conducted since 1980.

I DHS/FEMA Region VI wishes to acknowledge the efforts of the many individuals in the State of Arkansas, Pope, Yell, Logan, Johnson, and Conway Counties, National Oceanic and Atmospheric Administration (NOAA) Forecast Office, KXRJ Radio Station, and surrounding I jurisdictions who participated in this exercise. Protecting the public health and safety is the full time job of some of the exercise participants and an additional assigned responsibility for I others. Still they have willingly sought this responsibility by volunteering to provide vital emergency services to their communities. Cooperation and teamwork of all the participants was evident during this exercise.

I This report contains the final written evaluation of the biennial exercise. The state and local I organizations, except where noted in this report, demonstrated knowledge of their emergency response plans and procedures and adequately implemented them. There were no Level I Finding (formally Deficiency) or Level 2 (formally Area Requiring Corrective Action) Finding I identified, and there was one Plan Issue identified during the exercise.

I I

I I

4 I

Unclassified

I After Action Report/Improvement Plan I

Arkansas.Nuclear One SECTION 1: EXERCISE OVE'RVIEW I

1.1 Exercise Details Exercise Name I

Arkansas Nuclear One I

Type of Exercise Plume I Exercise Date August 17, 2016 I

Program I Department of Homeland Security/FEMA Radiological Emergency Preparedness.

Program I Scenario Type Radiological Emergency I 1.2 Exercise Planning Team Leadership ,- i I

Denise Bordelon Technological Hazards Branch Chief I

FEMA Region VI 800 N. Loop 288 ' .~ .. .

I Denton, Texas, 76209 940-383-7387 I denise.bordelone@fema.dhs.gov I

Nan Williams RAC Chair I FEMA Region VI 800 N. Loop 288 I 5

I II

I Unclassified Radiological Emergency Preparedness .Program (REP)

Arkansas Nuclear One I

After Action Report/Improvement Plan Denton; Texas, 76209 * ..*" ..

I

, I 940-898-5398 '

nan.calhoun@fema.dhs.gov I Elsa Lopez .. i . ~"

I Federal Planning Team Lead FEMA Region VI I Senior Technological Hazards Program Specialist * * ,.t 800 N. Loop 288 Denton, Texas, 76209 I 940-898-5308 elsa.lopez@fema.dhs.gov

.,.,_ ~

I Don Greene

I State Planning Team Lead Arkansas Department of Health I Health Physicist 4815 West Markham Street, Slot 30 ~ i ..I.' I 1 -*:

I . Little Rock, Arkansas, 72205 501-661-2808 .,,

I'.;

donald.greene@arkansas.gov I ':. '.::_:'.}::::

' ' ~

' .. \

Robert Carey  ;,,,

I

v t
-: ,~:.

Manager, Emergency Preparedness Arkansas Nuclear One

. i I

. i-"

1448 SR-333 \ I -* ..

London, Arkansas, 7284 7  :' ' I *-

,,: r'

  • ,. I,.

479-858-4754 I RCAREY@entergy.com I

I I 6 I

Unclassified

I After Action Repoit/Irnprovement Plan-I Arkansas.Nuclear One 1.3 Participating Organizations I Agencies and organizations of the folh:)wing,jurjsgictio.ns parti~ip~ted in the ANO exercise:

I Risk Jurisdictions ....

Arkansas Department of Emergency Management I Arkansas Department of Health Emergency Communications *Center City of Russellville> ** : * .* * < <' .. .

  • Dardanelle Police Department I

Johnson County Clerk's Office Johnson County Office of Emergency Management I

Johnson County Arkansas Housing Authority Johnson County Sheriffs Office I Logan County Emergency Medical Services Logan County Office of Emergency Management Logan County Sheriffs Office I

Nuclear Planning & Response Program Pope County Emergency Medical Services I

Pope County Health Department Pope County Office of Emergency Management I Pope County Sheriffs Office Russellville Fire Department I Russellville Police Department Yell County Emergency Medical Services Yell County Fire Control I

Yell County Office of Emergency Management Yell County Sheriffs Office I

Support Jurisdictions I City of Paris Police Department Clarksville Police Department I Danville Police Department I

I

I Unclassified Radiological Emergency Preparedness Program (REP)

I After Action Report/hnprovement Plan Arkansas Nuclear One I Private Organizations American Red Cross I Arkansas Nudear Orte.Nuclear Power PI'artt *.:i ** * * *** *.,!;'*

KXRJ ENS Radio Station Radio Amateur Civil Emergency Services I '*.

. **;I.

Federal Jurisdh:~tions .. *. * *": : , .. , ,

I NOAA/National Weather Service - North Little Rock' ...

    • .. (\

I "')"

"i\.. ..

  • i:!'*,,.

I

. ; , r :. .j . ~

  • i' .**

. - . *>n ~- , /;** : .: :

I ** ' * ; \ ** ., 1r',_.; 1 .:  ;  :, **-**.. -' .*

I I . ~-. i ....

I I

I ****,

  • .' ~ - '

L

  • * \ ' '. 4' '
    • . t I

. ~* ~ l t .

.-1 :_.:'1 .: i' I ,:!*' .**;.

*,: .i .' .** *: *.:.

I I

8 I

  • '*Radiological*Emergency Preparedness Program (REP)
  • Unclassified I I

After Action Report/Improvement Plan Arkansas Nuclear One SECTl(),N .i:*!*.EX*ERCISE"DESIGN *suMMARY I

2.1 Exercise Purpose and Design *! i .~ . . . ..

I

. . -~

The DHS/f~~~.Regi<;m.Yt:9Jfi~~ ,eyci~~a~ed:!he .exerqi~.e c;:m J}ugµst 1}, ,201~.:tq,assess.th,e...

capabilitjes of Ioc.1:1-~ *- ** .

.~mern~ncy,preparedn.ess.

Emergency ~esppns~ f,l~l}S 5md. ?roqedpr~s ~p lJr9te~t the publip health and .~afety dutjng a

  • ~ , .

oi::ganjza~ior:is

r. . , ' ' *
  • in, . implem.enting

~ .. ,

th~ir:*

Radio lo gic<;tl I

radiological emergency involving Arkansas :\'J'~cle<;tr Oiie (ANO) .. The p\Jrpose of thi~ report is.to represent the results and findings on the perf~rmance of the offsite response organizations * ' .

during a, simulated radiological emergency..

I

' .; ) * ; > ;' f \_ *. ! ." ,.." ! ! *. :' . '.' * : .; ! : ., i  : *.* ~ ~ I *  :. .: *,. ' ~ : . ~ '

  • '~ , ', '  :
  • I : ... ~

2.~ ~~e~cise Qbje~ttrie.s, ~~p~~~liti~~ .~nd Activjtj.es ..

.; ; *~ i :*: ' I ~ 1 ' 1 J * * , 1 * ' * * ,

1

\

.' . *r I

. . ... *: ..-: : . . ~ " .r: .* : . . .,

Exercise objectives and identified Capabilities/REP Criteria selected to be exercised are discussed in the Exercise Plan (EXPLAN), Appendix E.

I l-~!*.:~ . :.:* ~l~ J '

1 I

.1' *.  :*:

2.3 ~cenar~o Summary

    • .  :*~- ~-~- ;j!;!_,;;...* ~. . d; r::::*. .. /.. . ' ~ ' ' :: '

The exercise *Scenad'o'..w,as developed to evaluate* the response of exereise partidpants' to ail inddent requirirtgevactuiti:oh 0f the public from the 10-inile Emergency Planning Zone , * * :

I surrounding Arkansas*Nuelear:One (ANO)'. The:exercisescenario provided*for the evaluation**

of the Arkansas Department of Emergency l.Viana:gement* (ADEM);Arkansas Departm~ntof: ,. I Health (ADH), Johnson, Logan, Pope, and Yell Counties, and Local Emergency Services to manage emergeQ.cX ppi;~aJioµs,, proyid.e -~d implement protective ~ctio,n de.cis~o,11s, provide field measurement and analysis, and. alert and notify the public. I

  • '.:\  ! , It. l * !

I

. .. .;*_ i*. . .; .. *._,

I

  • ; <  : ~ I . ...:'"
  • I I

I I

9 I

I . Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Arkansas Nuclear One SECTION 3: ANALYSIS OF.* CAPABILITIES 3.1 Exercise Evaluation and Results :,:; :*, . '. :: . ,.-, ',.,.* * *.. *:

I Contained in this secti~n are the results and findings**af the evaluatib~ ~fall jurisdictions and I functional entities, which participated in the Arkansas Nuclear One (ANO) exercise t6 test the off-site emergency response capab.ilities of State and local go\Ternrnents in the 10-mile Emergency Planning Zone (EPZ) surrounding ANO. . .. *., *, .. .

I .. ,i. ~ *' I t

'i* ' '

j I

I 1,

j

~

'l Each jurisdiction and functional entity was evaluated on the basis of its demonstration of I criteria delineated in the exercise evaluation areas as_optlined.. in the REP Prpgram Manual, .

dated January 2016. Detailed information* on the' exerbsle~at~a((()ri :area: crh~ria arid the d tent

  • of play agreement used in this exercise are found in Appendix E of.thi~ rep?rt.

I ~ ' .. '

' ! 1

  • f  : I .J \ J .~

3.2 Summary Results of Exercise Evaluation I .'

    • . -1
  • The matrix presented in Table 3.1 , on the following page(s), presents the status of all exercise I evaluation area criteria from the REP P(ogram Manual that were: sch~du}~d for demonstrati9n during this exercise by all participating jurisdictions arn;i functional ~ntiities . ,Exercise _evaluation area criteria are listed by number and the demonstration statu$ of those evalua.tion are.a cri.teria is I indicatedbytheuseofthefollowingletter~ornumbers: -*' *" * . . ,*. ,,,., .'. _. ...

- -~ , l ' 1 I M - Met (No Findings asses'sed and*no unresolved ARCAs from pribt* exercises) '. *

  • l* ~ ~ i ' '~ I 1 - Level 1 Finding (formerly Deficiency) Assessed 2 - Level 2 Finding (formerly Area Requiring Corrective Action) Assessed or previous unresolved Areas Requiring Corrective Action P - Plan Issue I N - Not Demonstrated I

I 10 I

Unclassified Railiological Emergency Preparedness Program (REP)

I I

AHer Action Report/Improvement Plan Arkansas Nuclear One Table 3.1 - Summary of Exercise Evaluation (2 pages) I 0

DATE: 2016-08-17 SITE: Ar~ansas Nuclear One, AR ' u uu 0 u.J w

tJ..

0 u.J

~

E-N E-

~ ~ u.J c:;

u z u u c:

l 0

c:

0 c:

l 0c:

u0 u0:l I

M: Met, 1: Level *l Finding, 2: Lev~l 2 Finding, oC/)

....... 0 c:

~ :c :c tJ.. tJ.. :c "'c: "'0 <Ll I

bl)

P: Plan Issue, N: Not Demonstrated ~ Cl . Cl O:::* 0::: Cl ..c: 0..

0 C/) <( <( <( <( <( ~ -,0

..J c..

Emergency Operations Management Mobi lization !al M M M M M M M Faci lities Direction.and Control '

' lb!

lei M

M M

M M M M

M M M M I

Communi cations Equipment Id! M M M M M M M M M Equipment and Supplies Protective Action Decision Making EW Exp. Control Decisions le i M M M M M M M M M I

2al M ' M M M PARs PADs P AD s for Disabled/Functional Needs .

2bl 2b2 2cl M

M M M M. M M I

Ingestion P ADs RRR Decisions Protective Action Implementation 2dl 2el I EW Exp. Control Implem,entat ion M M M M M M I

3a l Kl Public/Institutionalized . 3bl M M M PAD Imp. Disabled/Functional Needs* 3cl M M M PAD Imp. Schools " 3c2 T ACP Establishment Impediments to Evacuation 3dl 3d2

' M M M M M M I

Implementation oflngestion P Abs 3el ln11:estion Strate11:ies and lnforination Imo. of RRR Decisions 3e2 3fl ,

I Field Measurement and Analysis RESERVED Field Team Management 4al 4a2 M I

Field Team Operations 4a3 M M Field Team Samolin11:

Laboratory. Operations -*

  • - 4bl 4cl I Em"'"'eocv Notification and Public Info -

Initial Alert & Notification Backuo Alert & Notifi cation Exception Area Alerting Sal 5a3 5a4 M

I Subsequent Public Information Sunnort °"""'tions/Facilities Receotion Center Operations 5b l 6a l M M I

EW Monitoring & Decon I

6bl Congregate Care 6cl Contaminated Iniured Transoort & Care 6dl I

.11 I

I Unclassified Rad iological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Arkansas Nuclear One I

Table 3 .1 - Summary of Exercise Evaluation (Continued. page 2/2)

I I DATE: 2016-08-17 SITE: Arkansas Nuclear One, AR 1'

  • J ,

\

  • I c

.c:

en

z

~

.....l ,

M: Met~ 1: Level 1 Finding, 2: Level 2 'Finding, r 1::S ;z:

' 0 UJ

i*

I P: Plan Issue, N: Not Demonstrated u C2 dl

>- ;2 0

z

Ememency Ooerations Management I Mobilization Facilities la l lbl M

M Direction and Control lei M I Communications Equipment Equipment and Supplies

  • Protective Action Decision Making ldl lei M

M I EW Exp. Control Decisions PARs PADs 2al 2bl 2b2 M

M I

P ADs for Disabled/Functional Needs 2c l M Ingestion P ADs 2dl RRR Decisions 2el .. I Protective Action Implementation I EW Exo. Control lmolementation Kl Public/Institutionalized 3a l 3bl. M p

PAD Imp. Disabled/F unctional Needs 3cl M I PAD Imo. Schools T ACP Establishment 3c2 3dl M Impediments to Evacuation 3d2 M I Implementation of Ingestion P ADs Ingestion Strategies and Information 3e l 3e2 Imp. of RRR Decisions 3fl I Field Measurement and Analysis RESERVED 4al Field Team Management 4a2 I Field Team Operations Field Team Sampling Laboratory Operations 4a3 4bl 4cl  ;

I EmCl'lZencv Notification and Public Info Initial Alert & Notification Backup Alert & Notification Sal Sa3 M M Exception Area Alerting Sa4 I Subsequent Public Information Suonort Ooerations/Facilities Sb!

Reception Center Operations 6al I EW Monitoring & Decontam ination Congregate Care I 6b l 6cl Contaminated Injured Transport & Care 6dl I

12 I

Unclassified Rad io logica l Emergency Preparedness Program (REP)

I After Action Report/ Improvement Plan Arkansas Nuclear One I

3.3 Criteria Evaluation Summaries 3.3.1 Arkansas Jurisdictions I

3.3.1.1 Arkansas State Emergency,Op~r~tio~~ Center I

.' . .' ~

In summary, the status of DHS/FEMA criteria for this location is as follows:

a. MET: 1.a.1 , 1.b.1 , 1.c.1 , 1.d.1 , 1.e.1.

I b.

c.

LEVEL 2 FINDING: None LEVEL 1 FINDING: None I

d. PLAN ISSUES : None
e. NOT DEMONSTRATED: None I
f. PRIOR ISSUES - RESOLVED: None
g. PRIOR ISSUES - UNRESOLVED: None I

3.3.1.2 Arkansas Department of Health, Little Rock Emergency Communications <;:enter I

.l * *** *, . ' ' . *-

In summary, the status of DHS/FEMA criteria for this location is as follows : I

a. MET: 1.a.1, 1.d.1, 1.e.1.
b. LEVEL 2 FINDING: None I
c. LEVEL 1 FINDING: None "
d. PLAN ISSUES: None

_).

I

e. NOT DEMONSTRATED: None
f. PRIOR ISSUES - RESOLVED: None I
g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.3 Arkansas Department of_Healtb and Emergency News Ce,n ter at the State I

Emergency Operati~ns Facility ' * .

I In summary, the status of DHS/FEMA criteria for this location is as follows:

a. MET: 1.a.1, 1.b.l , 1.c.1 , 1.d.1, 1.e.l , 2.a.l , 2.b.1 , 3.a.1 , 4.a.2, 5.a.1 , 5.b.1
b. LEVEL 2 FINDING: None I

c.

d.

LEVEL 1 FINDING: None PLAN ISSUES : None , '*

I

e. NOT DEMONSTRATED: None I

13 I

I Unclassified Radiological Emergency Preparedness Program (REP)

I After Action Report/ Improvement Plan Arkansas Nuclear One

f. PRIOR ISSUES - RESOLVED: None I g. PRIOR ISSUES - UNRESOLVED : None I 3.3.1.4 Arkansas Field Radiological Monitoring Team 9ne

. ' .,, . ~

"' ~'

In summary, the status of DHS/FEMA criteria for this location is as follows :

I a. MET: 1.d.1 , 1.e.1 , 3.a.l,4.a.3.

. I I. t

b. LEVEL 2 FINDING: None I c. LEVEL 1 FINDING: None
d. PLAN ISSUES: None I e. NOT DEMONSTRATED: None
f. PRIOR ISSUES RESOLVED - None I g. PRIOR ISSUES - UNRESOLVED: None I 3.3.1.5 Arkansas Field Radiological Monitoring Team Two In summary, the st~tus of DHS/FEMA criteria*for this location 1s as foliows: .

I a. MET: 1.d. l ,. 1.e.1, 3 .a.1 , 4.a.3. ,\.." ,

b. Level 2 Finding: None I c. Level 1 Finding: None '
  • l I*
d. PLAN ISSUES: None ,., ...

"*t I e.

f.

NOT DEMONSTRATED: None PRIOR ISSUES - RESOLVED: None I g. PRIOR ISSUES - UNRESOLVED: None

.. .

  • l ' * ..- ~ f 3.3.1.6 Alternate Joint Information Center I

In summary, the status of DHS/FEMA criteria for this locati'on' is as follows:

  • I
  • i ~ :.
a. MET: 1.a.l, 1.b.1 , 1.d.1 , 1.e.l , 5.b.1.
b. LEVEL 2 FINDING: None I c. LEVEL 1 FINDING: None
d. PLAN ISSUES: None I e.

f.

NOT DEMONSTRATED: None PRIOR ISSUES - RESOLVED: None I g. PRIOR ISSUES - UNRESOLVED: None 14

I

Unclassified Radio.logica l Emergency Preparedness Program (REP)

I I

After Action Report/Improvement Plan Arkansas Nuc lear One 3.3.2 Risk Jurisdictions * ,

3.3.2.1 Johnson County Emergency Operations Center and Traffic/Access Control Point I

In summary, the status of DHS/FEMA criteria for this location is as follows: I

a. MET: l.a.l , l.b.l , l.c.l , l.d.1 , l.e.l , 2.a.l, 2.b.2, 2.c.l, 3.a.l , 3.b.l, 3.c.l , 3.d.l , 3.d.2.
b. LEVEL 2 FINDING: None I
c. LEVEL 1 FINDING: None
d. PLAN ISSUES: None I
e. NOT DEMONSTRATED: None
f. PRIOR ISSUES *- RESOLVED: None
  • I
g. PRIOR ISSUES - UNRESOLVED: None I

3.3.2.2 Logan County Emergency Operations Center and Traffic/Access Control Point In summary, the status of DHS/FEMA criteria for this location is as follows:

I

' ME*T ~

a.

b.

l.a.f, l.b..1 , l.*c.l , l.d.l , l.e.l , 2.a.l, 2.b.2, 2.c.1, 3.a.l , 3.b.l, 3.c.1*, 3.d.l, 3.d.2.

LEVEL 2 FINDING: None 11

c. LEVEL 1 FINDING: None
d. PLAN ISSUES : None I
e. NOT DEMONSTRATED: None
f. PRIOR ISSUES . !

- RESOLVED*: None I

g. PRIOR ISSUES - UNRESOLVED: None 3.3.2.3 Pope County Emergency Operations Center and Traffic/Access Control Point I

In summary, the status of DHS/FEMA criteria for this location is.as follows: I

a. MET: l.a.1, l.b.l, l.c.l , l.d.l, l.e.l , 2.a.l, 2.b.2, 2.c.l, 3.a.l, 3.b.l , 3.c.l, 3.d.l, 3.d.2.
b. LEVEL 2 FINDING: None I. ~

I

c. LEVEL 1 FINDING: None
d. PLAN ISSUES : None I
e. NOT DEMONSTRATED: None
f. PRIOR ISSUES - RESOLVED: None I
g. PRIOR ISSUES - UNRESOLVED: None j5 I

I

I Unclassified Radiological Emergency Preparedness Program (REP)

I After Action Report/Improvement Plan Arkansas Nuclear One 3.3.2.4 Yell County Emergency Operations Center and Traffic/Access-*Control Point I In summary, the status of DHS/FEMA criteria for this location* is as follows:

I a.

b.

MET: I.a.I, 1.b.1, 1.c.1, 1.d.1, 1.e.1, 2.a.1, 2.b.2, 2.c.1, 3.b.1 , 3.c.l, 3.d.1, 3.d.2 .

LEVEL 2 FINDING: None I c. LEVEL 1 FINDING: None

d. PLAN ISSUES: 3.a.1 I ISSUE NO.: 01-16-3al-P-01 a

CONDITION: The Radiological Officer provided radiological briefing for the I Traffic/ Access Control Point Officer; however, the briefing did not indude instructions on how to wear dosimetry. In addition, both the.Radiological Officer I and TACP Officer where unsure of use and how to wear the dosimetry issued .

POSSIBLE CAUSE: Insufficient training and incompfete procedures.

I

REFERENCE:

Yell County Radiological Response Plan Re:v 5.1, NUREG-0654, I K.3.a.1. * '

EFFECT: If emergency workers were not wearing dosimetry and were exposed to I radiation they would not be able to track or report accurate readings.

I RECOMMENDATION: Provide additional training and revjse County Emergency Radiological Response Plans/Procedures to include information on the use and wearing of dosimetry.

I e. NOT DEMONSTRATED: None

f. PRIOR ISSUES - RE.SOLVED: None I g. PRIOR ISSUES - UNRESOLVED: None
  • i I 3.3.4 Private Organizations I 3.3.4.1 ENS Radio Station KXRJ In summary, the status of DHS/FEMA criteria for this location is as follows:

I a. MET: 5.a.1.

b. LEVEL 2 FINDING: None I c. LEVEL 2 FINDING: None 16 I

Unclassified Radiolegical Emergency Preparedness Program (REP)

I I

After Action Report/Improvement Plan Arkansas Nuclear One

d. PLAN ISSUES*: Non~ .. >I.

I

. ~  ;

e. NOT DEMONSTRATED : None
f. PRIOR ISSUES - RESa°LVED ~ N~ne I
  • . I ~ , I !_J ~ : l ' * ' ,
  • 1 g . . PRIOR ISSUES - . ~Rl;:SOLV,ED : None _

3.3.5 Federal Jurb.dictions

      • J I

3.3.5.1 NOAA North Little Rock I

In summary, the status of DHS/FEMA criteria for this location is as follows:

a. MET: 5.a.1. I
b. LEVEL 2 FINDING: None
c. LEVEL 1 FINDING: None I
d. PLAN ISSUES: None
e. NOT DEMONSTRATED: None I
f. PRIOR ISSUES - RESOLVED: None
g. PRIOR ISSUES - UNRESOLVED: None I I

I I

I I

I I

I 17 I

I Unclassified Radiological Emergency Preparedness Program (REP)

I After Action Report/Improvement Plan Arkansas Nuclear One SECTION 4: CONCLUSION I Based on the results of the exercise, the offsite radiologi~al emergency respons~ plans and preparedness for the State of Arkansas and the affected local jl1ri~dictions are deemed adequate I to provide reasonable assurance that appropriate measures can be taken to protect the health and safety of the public in the event of a radiological emergency. Therefore, 44 CFR Part 350 I approval of the offsite radiological emergency response plans and preparedness for*th'e State of Arkansas site-specific to Arkansas Nuclear One will remain in effect.

I

  • * .
  • t ~ * ~ .1 I

I

  • I I ( . .

I I '

,. . i I

I I

I I

I I

I 18 I

Unclassified Rai:l iological Emergency Preparedness Program (REP)

I I

After Action Report/Improvement Plan Arkansas Nuclear One APPENDIX A: IMPROVEMENT PLAN Issue Number: 01-16-3at-P-Ot Criterion: 3at I

) .

ISSUE: The Radiological Officer provided a radiological briefing for the Traffic/ Access .

Control Point Officer; however, the briefing did not include instructions on how to wear I

dosimetry. In additi.o n,, bqt4 thet Radiological.Officer and TACP Officer where unsure of use

,.._ ~

  • and how to wear the dosimetry" issued.
  • J
    • 1.. ~

~

4 ,'

I I

RECOMMENDATION: Provide additional training and revise County Emergency Radiological I Response Plans/Procedures to include information on the use and wearing of dosimetry.

I CORRECTIVE ACTION DESCRIPTION:

I CAPABILITY: PRIMARY RESPONSIBLE AGENCY:

I CAP ABILITY ELEMENT: START DATE:

AGENCY POC: ' - ESTIMATED COMPLETION DATE: I I

I I

.'j:.

I I

. 19 I

I

I Un,classified Radiological Emergency Preparedness Program (REP)

I After Action Report/Improvement Plan Arkansas Nuclear One APPENDIX B: *EXERCISE TIMELINE I . * * ~ r;,_ *~ -~-~ *.-:r~*~~* *-~~? (_. *.: j ' 'I l *. ~

Table I presents the times ~t wh1ch k~y events an*d' actNitfoi,*b~~;brt'tf~d ~rirlng tlie. ANO .Plume I Exercise held on August 17, 2016.

j. I *
  • ":°'.C'
  • 1 ",.- I .. * *~
  • .  ! -i ~ 'i ' d I Table 1 - Exercise Timeline DATE: 2016-08-17, SITE:

Arkansas Nuclear One ; AR t:i...

u I <

f::;

c1d u

'"O

~ 0 I Emergency Classification Level or Event 0"'

0 0

t1l c

u0

§

-~ u u t.t..

0

u i
:

I 0 t1.l

> tu Cll u 0
a ~ "'i::

t1.l 0  ::i:: -. ..c:

s E 0 -.0 i= Cll ~ ~ :z; Unusual Event NIA I Alert Site Area Emergency 0746 0850 0756 0902 0756 0802 0906 08 10 0850 0758 0900 I General Emergency Simulated Rad. Release Started 1038 1038 1050 1050 1038 1038 1102

. 1042 1042 1052 1052 Simulated Rad. Release Ended '! *'

I Facility Declared Operational Declaration of State of Emergency 0846 0936 0919 0920 0812 Exercise Terininat~d : i". 123'5  ;;., 1245. '. '.: . ;~

,-., .*t- ...

~.; ~J2)$'. i,<'It-*', .:!.-~>~t;~~"*~** ~~:. . t235 ., . '1240 I

. .~ i. .

' . *. :~. 'i~.f ~~t ..

~~~~:~:~~~~Ei~I. ~\' ' .. .
  • ~

Early Precautionar.y Acti6n Decis'o~s:

' N *

.*- >:', t,.,, \< I *'\.

PAA# 1: Alert & call in School Bus Drivers 0810 08 15 PAA#2: Activate Reception Centers 0822 0828 0824 I PAA#3: Evacuate Schools Shutdown Rail & Ri ver Traffic 0927 0934 Protective Action Decisions (PADs) :

I PAA#4: Evacuations (S ubzones: G, H, K, N, 0 ,

P, Q, R & U). Shelter (S ubzones: I, J, L, M, S &

T) and KI for EWs & Institutionalized.

1045 1049 1102 1053 I PAA#5: AG & Livestock-impound/quarantine EAS Messages and Times:

1230 1225 1109 1229 1230

  1. I Msg#: "E" and Time:

I #2 Msg#: " S" and Time:

  1. 3 Msg#:

1112 Traffic Detour Advisory: Yell Coun ty 1121 I Traffic Detour Cleared: Yell County Kl Administration Decision: 1049 1144 1053 I

.20 I

Unclassified

. Radiological Emergency Preparedness Program (REP)

I I

After Action Report/Improvement Plan Arkansas uclear One

~ 1~ j, I

Table 1* - Exercise Timeline DATE: 2016-08-17, SITE:

'*: Atkansa~ Nuclear One, AR

. I "C

~

uu Q.,

u Q.,

u Q.,

u I

Cl ~ ~ ~

Emergency Classification Level or Event

~

5u o<3 u

0 w

o<3 u

0 w

o<3 u

0 w >

I 5 cc:: c cc:: rn f:: § I

I rn
I 0

u 0

u 0 zw u u

' ;j Q, 4) 2 0 >-

~

00 p..

0 I

...J Un.usual Event NIA Alert 0746 0756 0756 0756 Site Area Emergency*

I 0850 0859 0854 0856 General EmergenCJ1J1_, *J 1038 1059 1052 1053 Simulated Rad. Release-Started 1038 1048 1053 Simulated Rad. Releim: En_d,ed. ,

facility Declared Operational 0826 0823 0845 I Declaration of State of ,Emergency 0840 0819 Exercise Terminated : *,* :\

,Early Precautionary Acti!Jn Deci~ions:

1235 1241 1241 1242 I

PAA# ! : Alert & call in School 8Qs Drivers 08 12 0810 P AA#2: Activate Reception Centers PAA#3: Evacuate Scbo9l ~ ,

082?

0932 0930 I

Shutdown Rai l & River Traffic 0947 I

I I *l Protective Action Decisio*ns ( PADs) !

',' I PAA#4: Evacuat ions (Subzones:,G,

")* ';., .

H , K, N, 0 ,

P, Q, R & U). Shelter (Subzones: I, J, L, M , S & 1056 1053 1053 I

T) and Kl for EWs & Institutionalized.

P AA#5: AG & Livestock-impound & qu arantine 1235 1230 1235 EBS Messages and Times:

  1. I Msg#: "E"(Evauation) and Time:
  1. 2 Msg#: " S" (Shelter in Place) and Time:
  1. 3 Msg#:

I Traffic Detour Advisory: Yell County Traffic Detour Cleared: Yell County Kl Administration Decision : 111 2 1103 1053 I

I I

.21 I

I Unclassifi ed Radio logical *Emergency Preparedness Program (REP)

I After Action Report/Improvement Plan Arkansas Nuclear One APPENDIX C: EXERCISE . EVALUATORS AND I -

TEAM LEADERS I DATE: 2016-08-17, SITE: Arkansas Nuclear One, AR I LOCATION EVALUATOR AGENCY I Arkansas State Emergency Operations Center Arkansas Department of Health, Little Rock Emergency

  • Norm Valentine *
  • Nan Williams Jeff Clark FEMAR6 FEMAR7 Arkansas Field Radiological Monitoring Team One *Scott Flowerday FEMAR6 I Arkansas Field Radiological Monitoring Team Two *George Brozowski EPA Arkansas Nuclear One Emergency News Center *Cara Christiansou~Ri ley FEMAR7 I Alternate Joint Information Center Little Rock
  • Sharron McDuffie .

Matthew.Celia FEMARVI FEMAHO

    • ¥.

I Johnson County Emergency Operations Center and Traffic/ Access Control Point

  • Brad DeKorte Dulcie Allen

' FEMAR6 FEMA R9 Logan County Emergency Operations Center and Traffic/Access *LaShawn Halsey ** _ FEMAHQ I Control Point Pope County Emergency Operations Center and Traffic/ Access Darren Bates

  • Tim'6tny Pflieger '

1 FEMAHO FEMAR6 Control Point Pat Tehorio FEMAHQ I Yell County Emergency Operations Center and Traffic/Access Control *Liiida Gee Point Clark Gallo w~y

- FEMAR6 FEMAHQ

.I 'I,.

I ENS Radio Station KXRJ NOAA North Little Rock .*.

,*Elsa ~ope'.? . :

  • Andy Ch~ncell'Cir' ..
  • FEMARVI FEMAR7 I
  • Team Leader i I I

I ....

I 22

Unclassified RadiOlogica l Emergency Preparedness Program (REP)

I I

After Action Report/Improvement Plan Arkansas uclear One APPENDIX D: ACRONYMS AND ABBREVIATIONS I

Acronym Meaning

, 1.*

I ADEM Arkansas Department of Emergency Management ADH Arkansas Department of Health

., I AJIC Alternate Joint Information Center *' '

ANO ARES Arkansas Nuclear One Amateur Radio Emergency Services

. '*\

  • I I

AWIN Arkansas Wireless Information Network CAD Computer Aided Dispatch I

CFM Cubic Feet Per Minute DHS/FEMA DEF NS Department of Homeland Security/Federal Emergency Management Agency Dedicated Emergency FacsimileNoice System I

Direct Reading Dosimeter DRD EAS Emergency Alert System I Emergency Broadcast System' ..

EBS ECC Emergehcy Communications Center

.,,. I, II ECL Emergency Cfassification Level I

EMD Emergency Management Director EMS Emergency Medical Services ENC Emergency News Center ENS E_OC Emergency News Station Emergency Operations Center I

EOP EPA Extent of Play Environmental Protection Agency

. I

  • f EPI) Electronic Personal Dosimeter '.

EPZ EW Emergency Planning Zone Emergency Worker I

I I

FMT Field Monitoring Team FMTC Field Monitoring Team Coordinator FTC Field Team Control GE General Emergency I GIS Geographic Information Systems HP JIC Health Physicist Joint Information Center I

Kl Potassium Iodide I

  • 23 I

I Unclassified Radiological Emergency Preparedness Progra~ (IIBP)

After Action Report/hnprovement Plan Arkansas Nuclear One I

LGL Local Government Liaison. ( *' *.I; *:- i ' < ... '

I MHz Megahertz NAWAS National Warning System I NOAA

    • NERN" National Oceanic and Atmospheric Administration NP&RP I NWS OEM National Weather Service Office of Emergency Manageme:t:;1.t; *  ; i.

I ORO OSL Offsite Response Organization Optically Stimufated Luminescept PAA

  • Protective Action Advisory :

I

  • ,., f ~,  : . I PAD Protective Action Decision **i..-'; t*. ; ..... :.1 .. *.*

PAR Protective Action Recommendation * ' .. *, I  ;' :l \ *

~ ".

I , PDAFN PIB Persons with Pisabilities and Ac".ess/Fun~tiornil N e~c;ls Public Information Bulletin .

~ ':*

I*;,' l*

PIT Public fuformation Team *.. ;,i i;** l ~~ ~-).i~.-... ..': ***.

I PRD Permanent Record Dosimeters Radio Amateur Civil Emergency Servic~.

  • I

.~

I ~* **

RACES .  :*

I , RASCAL RDAC Radiological Assessment SysteJ;TIS for Coµs~qu.eriGe J\nah~~~~- -. ** .

  • Radiological Assessment Display and C0nfro.1 Sys_t~ms , :, 1 .; '" *.*.

REP Radiological Emergency Preparedness .

  • I RO Radiological Officer ,. . **' " ~ .. i'* 'i RRTL Radiological Response Team Leader I SAE SDO Site Area Emergency Staff Duty Officer

"\,_.,; '*'.*. ;,

/ .*.* ; ,* ' :* ' :

  • sEOF State Emergency Operations Facility .-...

I SOP Standard Operations Plan TACP Traffic and Access Control Point I !EDE TLD Total Effective Dose -equivalent Thermoluminescent Dosimeter .,

I TOCD URI Technical Operations Control Director Unified RASCAL Interface

"*. ;*j,,f*."

I -~ .: . :

I

I 24 I

~.Unclassified

I After Action Report/hnprovement Plan Arkansas Nuclear One I

APPENDIX *:E:*;EXERCISE PLAN I I

~

I I

I

. *~

I ~* J'.*' ..

  • ' ... *:'. ~. . . . .,

I r.*~:.f . *"'"

I I

,,,<~'.*I,  :.. *; ;.* ' '*. ~ ...

.... '.. r ,/;

I

'!* . *.. ~ -. '.

I

. .: ~ *'i

  • , 'r ..

l,  :.*.'

'~. *, ~

.}

I I

~ . '* ~ ' ..

' ;j ~ I 1 c) ~1'"* ~- ' ...

I

' ., -~

r:*

I

j. .. **:, *'~ i i '*.

,::'J; I

  • . 25 I

I

I

I After Action Report/Improvement Plan Arkansas Nuclear One Arkansas Nuclear One 2016 Biennial Exercise I . * '*

August 17, 2016 Extent-of-Play (EOP) Agreemenl ._, ,

Between*.":._ .*. ' . '1 ;,, */' *:'.°.~ **,; /

The Arkansas Department of Health, representing the Off-Site Response Organizations, and FEMA I Region VI EVALUATION AREA 1 I Emergency Operations Management Sub-element 1.a - Mobilization I INTENT I This Sub-element is derived from NUREG-0654/FEMA-REP-l, which requires that OROs have the capability to alert, notify,. and mobilize emergency personnel, and activate and staff emergency facilities.

Criterion 1.a.1: OROs use effective procedures to alert, notify, and mobilize emergency personnel I and activate facilities in a timely manner. (NUREG-0654/ FEMA-REP-1, A.1.a, e; A.3, 4; C.1,4, 6; D.4; E.1, 2; H.3, 4)

I Locations: State EOC ADEM, Camp Robinson; ADH Emergency Communications Center (ECC), Little Rock; ADH State Emergency Operations Facility (SEOF), Russellville; Pope County EOC, Russellville; Johnson CQunty EOC, Clarksville; Logan County EOC, Paris; Yell County EOC, Danville. Alternate Joint Information Center (AJIC),

I Little Rock.

  • EOP 1. ANO will notify the ADH ECC per established procedures. The I 2.

ECC will follow the instructions of the RSDO and/or the TOCO Direction and Control will remain with the TOCO who will be pre-deployed to the NP&RP office in Russellville. Alternate JIC Radiation Control staff I will pre-deploy to Freeway Medical Center to demonstrate direction and control when the TOCO is in route to the SEOF. When SEOF is operational, this staff will pre-deploy to the AJIC. Other alternate JIC PIO staff will pre-I 3.

deploy directly to the AJIC The FRMTs will be pre-deployed at the NP&RP office in Russellville. After activation, teams will stage at the ANG I Armory, Russellville. Two teams will go into the field.

FRMTs will be directed from the SEOF.

I 4.

5.

ADH, Little Rock will only be evaluated at the ECC.

No shift change will be performed. A list of second shift Key Personnel will be available for review. A shift change briefing will either be demonstrated I by the OROs or the evaluator will interview the ORO to determine the content of the briefing.

I 6. The 1st shift may be over staffed for training purposes. Some staff identified on the 2nd shift roster will play with the 1st team. In an actual emergency this over staffing would not be used.

I '26 I

Radiological Emergency Preparedness Program (REP)

.: Unclassified I Arkansas Nuclear One I

After Action Reportfhnprovement Plan

7. Protocols for requesting Federal Support will be demonstrated through*

8.

interview at the ADH SEOF.

The followi.n~ ~ocations. will pre-stage:

I

.*' \* *--;.,--:' **.1\ ;_._:. ~ .~.: *. ; ' *: -: . .  ! \ ., * .

a.

b.

Radiolo-gical Response Team at the NP&RP Office in* Russellville.

Field Teams at the NP&RP Office and then to the Armory in Russellville.

, ...,., :*c: **.A1ternateJlC*in little Rock ... : . **

I I

ARCA: NONE ~*..

~ ***

Sub-elemenf1 .b~ Faciliti'es '-:.

INTENT

' . I*

t  ;,

~: ; .

I This* sub-element is.derived \from NOREG.:.0654; which *provides thaf bffs'ite Re~iponse Organizations (ORO) have facilities to support the emergency response.

I

<<"1 **: "': .. '  :~) : 1:.1 .*~* *:* *;\~~ ,_*; *.*'.,;~:**:* ,..... ~ '. ';I ")"" : , ~~' } I Criterion 1.b.'.1."; Facilities are1 sufficient' tocsupport the :emergency response. (NUREG-0654/FEMA-REP-1, H.3; G.3.a; J.10.h; J.12; K.5.b) . * ;'. * * * *: .,

  • I Locations:
  • i:..State'.EQC.ADEM;"Camp Robinson; ADH StateEm'ergency Operations Facility

'.

  • i (SEOF);:-Russellville;* Pope County EOC, Russellville;' Johnson County EOC, Clarksville; Logan County EOC, Paris; Yell County EOC, Danville; Joint Information I

Center (Emergency News Center), Russellville; Alternate Joint Information Center EOP:

{AJ~<;:)1 -~i_t~l_e ~()Ck.

First time in new 8-year cycle.

I ARCA: None I

"~~ ~ -

I

  • .. -, *.:*1, 1;:  :*-:  : * : : . " : : : *", .: *.:: .. *, ,*_:

. ' ~ .~ i  !.-

  • . ;,_ *1,

.,*{. .t* .-, ...

'._.*. ~> ~.

. ;' -: . ~ . - I I

I ~.~* ** ' * ', '  :: "i

__ ,~ . . *.  :,.~ . .. , -:\:*~: . . "~ . .:~ r.* .., .. -- ..

.... i

  • ~  :.

,.(

" *~ :

......1 I

  • '.~**;:;. ~-1. ': ;~

~. ;, . .: : .

(;*.1

r, * "i

~.  :; ~ .

~ .*. *. .;.. . '

~ .. ..

~

. . ::* ,i.::i'1 I

~* )". ~

  • I< * * *: ,! * ', ,* ' * :- ** ** ( '., L \ ,. f*  ! '
  • .- . *.' .
  • t ", *.

I 1 .27 I

I

I Unclassified

. Radiological Emergency I'reparedness Program (REP)

After Acti~n Report/hnprovement Plan Arkansas Nuclear One I Sub-element 1.c - Direction and ,Control ... **

I

.::**- **~ \ . ~:~**~'/ ~*.*

INTENT This sub-element is derived from NUREG-0654, which provides that Offsite Response Organizations I (ORO) have the capability to control.their overall r,esponse:to: an e.m.ergency-.1 Criterion 1.c.1: Key personnel with leadership roles iforthe ORO pr.o.v,ide direction and control to that part of the overall response effort for which they are responsible. (NUREG-0654/FEMA-REP-1, I A.1.d; A.2.a, b; A.3; C.4, 6) *z ,, ' ...

Locations: State EOC ADEM, Camp Robinson; SEOF, Russellville; Pope County EOC, I Russellville; Logan County EOC, Paris; Yell County EOC,* Oanville;,Johnson*

County EOC, Clarksville.

EOP: 1. ANO will notify the ADH ECC per established procedures. The I

  • ECC will follow the in~tructions' of the RSDO and/or: the TOCO~
j-*~-*~~* 1**.~*
.:~*: .. :*~;:.~.** *, .* '*. . ;-,.
2. Direction and Control will remain with the TOCO who will be pre-deployed I . tothe*NP&RP-office in Russellville.: The*ADH,wiU.be evatuated at this**

location and the SEOF. * *: <:* '.. ,

.: 3.. ; * *When t~e team deploys from. the.staging. area~to.:tbe SEOF1 *Direction .and I Control will be given to the TOCO located in .L.ittle~Rock*_until the SEOF is

-operati_onal*.. 1

.. * ,~2*.~-:~~ ..i ;*~_\;.;\.,,,,:. *:* ~:.L :~

  • ,1 -

I ARCA: None Sub-element l .d - Communications Equipment I INTENT This Sub-element is derived from NUREG-0654/FEMA-REP-1, which requires that OROs establish and I operate reliable primary and backup communication systems to ensure communications with key emergency personnel at locations such as contiguous governments within the EPZ, Federal emergency response organizations, the licensee and its facilities, EOCs, Incident Command Posts, and FMTs.

I Criterion 1.d.1: At least two communication systems are available, at least one operates properly, and communication links are established and maintained with appropriate locations.

Communications capabilities are managed in support of emergency operations. (NUREG-I 0654/FEMA-REP-1, F.1, 2)

Locat'ions: State EOC ADEM, Camp Robinson; ADH ECC, Little Rock; ADH SEOF, Russellville; I Alternate Joint Information Center, Little Rock; Pope County EOC, Russellville; Johnson County EOC, Clarksville; Logan County EOC, Paris; Yell County EOC, Danville; State FRMT 1, Russellville; State FRMT 2, Russellville I EOP: Each location will demonstrate the use of one primary and one backup communications system and be prepared to discuss backup alternate communication systems. Each location will identify a communications system that I ARCA:

is independent of the commercial telephone system.

None I '28 I

'"Unclassified Radiological Emergency; Preparedness .Program (REP)

I After Action Report/Improvement Plan Arkansas* Nuclear.One I

Sub-element 1.e - Equipment and Supplies to Support Operations I

~

INTENT This sub-element is derived from NUREG-06541 which provides that Offsite Response Organizations (ORO) have emergency equipment and supplies adequate to support the emergency response. I Criterion 1.e.1: Equipment, maps, displays, monitoring instruments, dosimetry, potassium iodide (Kl) and other supplies, are sufficienHo support:emergency operations {NUREG-0654/FEMA,.REP*,

1, H.7, 10; 1.7, 8, ..9; J.10.a,.bretJA.1, 12; K3:a; K5.b) * : * .,. "

I Locations: State EOC ADEM, Camp Robinson; ADH ECC, Little Rock; ADH SEOF, Russellville; Emergency News Center Russellville; Alternate Joint Information Center, Little Rock;:Pope.,County.EOC, *Russellville; Johnson County EOC 1 Clarksville;* Logan,.

I

  • . 1 ...

'.: Coupty EOC,.J:>ar:is;'Yell County.EOC,Danville; State FRMT 1, Russellville; State*

, ,., FRMl' 2,Russellville *. *.

  • , :; t * * **~ , : ' " '. *'. , :. . ~* r \

i* *

., . *~ _, ~

r * * :.

\ ":*. ' ~ .

I EOP: 1. ADH Russellville will only be evaluated at the SEOF 2, . ,;:.**ADH.t.ittle Rock wilf.'only be evaluated:anh.e ECC '>

...:*, .(*f*.

I

"* *3. *: <r** Meters or*DRDs.that have ubar code"*labels can have their calibration and .

. . , .,, ..... *qu~erly operational check dates verifiedwith the master database maintained by the NP&RP HP. Operational checks of meters will be I

performed before use, using range of readings stickers on the meters.

., * ' :4.... , *rhe;quant-ities of Dosimetry andithe quantities and expiration of Kl will be

,. * , * . **' r e,'.*.:*:**'eonfirmed by evalu~tors:at'locations identified in plans.

"f>

I

5. The availability of TACP equipment will be described through interview at

'*'* ;,!/' . :i ;the Counties.,*TACP personnel.will not go*TACPdocations.

I

' ~ .

6. Exposure control and monitoring will be under the control of ANO at the

..;:SE.Of,,the 'Russellville ENC,. and*Russeil:ville Rumor Control. ANO will perform habitability determination *using meters. and area monitoring.

I

  • .. : .;. ***; 7*.:-,:; *;~,'-itt *i~A*ansas*po,licy to issue Kt only t9 Emergency*
  • * , * .* , '{,i !.*Worker.s*.(EW) an:d,institutionalized individuals., KHs not I

. .' ~ *_ .... ;-'"" F _; ** *** ** >issued.'.to,,the general.opub!ic. ! ..: . *' ,. .. -

8. Correction-on-the-spot will be considered aMhese locations at the discretion of and concurrence between the evaluator and the controller.

I

  • , -. ",:.Caution'. should, be exercised to ensure. thatexetcjse play is not interrupted.

ARCA: None

. r I~ * ' .

I


~----~ ~

..: l. * ... ,.

I I

r29 I

I

I Unclassified Radiological 'Emergency Preparedness Piograni (REP)

After Action Report/hnprovement Plan .: ' .

I EVALUATION AREA2 Protective Action Decision-Making I Sub-element 2.a:.. Emergency Worker Exposure*Control:.:**

INTENT

., '**: ,1, I This Sub-element.is *aerived from NURE:G:..0654/FEM:A.'-RER'."1~ which:*requiresthaLOROs .have the**!

capability to assess and control the radiation exposure *receive'd ,by emer.gency workers.arid have a *

. t.

decision chain in place, as specified in the ORO's plans/procedures, to authorize emergency worker I exposure limits tel' be exceeded for -speciffo.missions; i :y :. :. :.:- ,, . '*: * ;'L""***. *.**

Criterion 2.a;1: OROs use a decisiOn-making process,'considering:relevant'factors and

.. ~~. \,.  ;** i;:* i ~. t; ... ) f. ... J' 1 ; ; * *"*::

.*'-'.;J, . -.,

appropriate coordination, to ensure that an>exposur~ contrci/'system;. iriclriding:.the use of Kl, is in I place for emergency workers, including provisions to authorize. fadiation exposure in excess of administrative limits or protective action guides. (NUREG-0654/FEMA-REP-1, C.6; J.10. e, f; K.4)

. . *t;_' ,_ 1' ';* .. :. '.' **.' .*;. ' .~ .. '

I Locations: ADH/SEOF, Russellville; Pope County EOC, Russellville; Johnson County EOC, Clarksville; Logan' Cotinty.E00; ~aris; Yell Counl'y EOC,1-Danville. ..: 1

.1. ; Exposure.control and monitoring wilLbe :tlhderthe: control of ANO at SEOF .

I EOP:

  • AN.O will perform habitability*determinati'Qn µsing.meters and area monitoring. * * * ,. ' :: .:* ..£ "~-* . ** " ..hY .:u:. > k'.r:.(

-~ .. .'. ' ~-:J ...

I *:.*

2. State FRMTs will use gloves as necessary. Access to "anti-C's" will be

. * ..demonstrated; however, the}r,will riot,be.. worn; Afte'f:the termination of the exercise FMRT memb.ersiwill be prepare~Uoderiionstrate the donning and removal of "anti-C's". Respiratory protection will NOT be used.

I .. .**. ,.;

3.

.- : =.

  • Atthe County, EOCs;- tile RO"Will; demonstrate .tne EW .briefing, record

. ~

keeping, and procedures for issuing and returning dosimetry and Kl.

I . ; .: ~  :  ; I

4. * . ' lfthe plume does n"<>t*require*a<<KI decision, the Ca.i.:.t:nty

~I

,,.,. * *:EOCs can satisfy-this EA by interview;,,.\**--;; *-;,1:.:k,!'."i

. ...:*r. *.)

-~  ! .

I 5. It is Arkansas po!icy fo' issue KJ* only.to,.Emergehc.y Workers (EW) and institutionalized .individuals. *EWs~who del'Clin:e,to*\takl! Kl may not be identified in advance. If they decline:tg take'Kl,atitheir duty stations, they I will not be placed in positions that would expose them to radiation. Kl is

not issued to th'eigeneral publi!E'~-~§:l; ,,);,'.'.-..! )1._)';* * < _'

( >- *  ; **: ~ ... ' - * :

. *: .*.; . , 6, 1The*State'of Arkansas'may:rrot.considerthe:termination of Emergency 1*

1 Worker exposure control to be at the end of the "plume phase".

ARCA: None**

I Sub-element 2.b. - Radiological Assessment and Protective Action Recommendations and Decis.ions for the Plume Phase of the Emergency I INTENT This Sub-element is derived from NUREG-0654/FEMA-REP-1, which requires that OROs have the I capability to independently project integrated dose from projected or actual dose rates and compare these I

  • Unclassified RadiologicaJ*Emergency Preparedness.Program (REP)

I After Action Report/Improvement Plan Arkansas Nuclear One estimates to the PAGs. OROs.must:have the capability.to choose, among a range ofprotective actions, ,

I those most appropriate in a given emergency. OROs base these choices on PAG,s from their plans/procedures or EPA's Manual of Protective Action Guides and Protective Actions for Nuclear Incidents and other criteria, such as plant conditions, licensee PARs, coordination of PADs with 0th.er. .

I political jurisdictions (e.g., other affected OROs and incident command), availability of in-place shelter,

  • weather con.ditio,ns,..~nd,~~i!Y.~,µp~)>.~Jo, ip9lud,e HA,B in.c_ioen_ts, .t~e threat pos.ed py th=e_ ~pecific _hostile actior), the affilia!eg r~spq~s~*>fl\lP*t~.~ ~e.ft.ec.t,pf, 9n .~va9uationpn th.e th~eat re~poDse. effqrt, that create . . I higher thaj:) r;iorr;n.al,ris.l:<.fr.~r;r:i .

lg:e.g~~~I p,9~y!ali~n .

~vpcuaUo.r,i ..- , , .*

\

  • ,., . * . , *' .\. ~!7*: ,*~** ;..-~.** * .' *. *{ ,\.';:t. ;:_,.:,: .. **

Criterion 2.b.1: A,ppt.oprteJ.!e prot~ctweaction.recomine.nd.ations (PARs) are 6a$e.d on available information on p*lant coriditio'i*is~'.fif!Jld moriltOring data, and..licensee_and ORO, dose projections,' as 1 '::.*** ~*.;..* ..* ' *.* *: * *~ . * .,~ **,  :: 1.. ' ... .* ,

I well as knowledge of onsite and offsite fihviroiimerital ~conditions: (NUREG-ii654iFEMA-REP-1, 1.10 and Supplement 3)

  • . . . . * *
  • 1 Locations: *

.*:-..,., *.* *.-:"'~,*,*~r~**

    • ADH S.EOF, Ru.ssellville. :

._1-**.**.. i*.' *~~  :,*

~* . _: **

I

! *:.: . < ,*, l, * *;..  : .~..** :; .  :""l:-' '. '  :,f** ,:.;;.. ~_,,. .. :,; . -. . . *~: t . : **:-_,,:*. ". ';, .1'.'.::*:. . :*.-.'. ..... '.

EOP:\; -. : ,'. ~.

. .. *1,,." .:. q-.~;."tli'.*;r:*~~

1: * * **nose

....... ~~ l~- .......... ~* * * .,., "'.'p -{

Projections*wilrb~n't~de p~(pro.~equresl;J~in~.acoin~ination of

!*"r*:. ,: ....... : . .' -~ r ' _.* * .

  • I RASCAL and RDACS: RASCAL will be the primary model used to make
  • . ... ,:*\

.* pr9je~ti9ns. based_ on ",plantcon~itiQns'\ pnc~ RDA.CS outputs are

~'1.)~e-~r'Di:n~cfto. adetjua.t.e!yr,~pfe__ ~ent ~he p1l.u~~ 1 .!_hvill be used as the

  • P.ri~JlrY m*odel. *. * * **

I

  • "' . ,a r * .; * -...:  ;
  • t :,r, '" ,. * .' * ' !.. * "I* ! *
2. Protedt'iv~*A"ctio~"Adviso;ies- issued
., .. *: ..: ; <<*:c*-,f~~;~~,!?ti~~ A~~ion by fheJstate ~~Y differ from the ANO Re,c~rprn~r:i5fatio_n~ an.~.~may, not reflect th~ logic identified I

. .. m,~JJR~~-P654/FJ:M)\;R.,t;P:.1, ij.ev1s1on 1, ~upplement 3, Gwdance for ARCA;

  • *-' Piotectivff Actiori Strategies (October 2of1)

. ~ .  :. ~

  • t",

I

.- .... ' , . =...1 ..., *. .; ~ ',

  • f '

~~-~~.7~-~*7";~~::-~;:::.~r-;r:=-~-;~:~;.-:-.-:~~-~~~~---~~---------:~-~~-:~-~-.~~------,--~:~~~-~7~~---;---~---------~------------------------

Criterion 2.b.2: A decision-making process involving consideratio~ ~f ~~propriate factors and I

necessary coordination is used to make protective action decisions (PADs) for the. general public (including the. r~co.mm~mla_tipn fpr th~ µse of,.Kl,_if O_RO_po/icy) .. (NUREG-06541FEMA-JJE;P::*1A:_3; C.4, 6; D.4; J.9; J.10.f, m) . I Locations: Pope County EOC, Russellville; Johnson County EOC, Clarksville; Logan County EOC, Paris; Yell County, EOC, Danville. I EOP: 1. It is Arkansas policy to issue Kl only to Emergency Workers (EW) and institutionalized individuals. Kl is not issued to the general public. I

2. The State issues Protective Action Advisories (PAAs) and ANO issues Protective Action Recommendations (PARs). A PAA and/or PAR become a II PAD when all County Judges concur.
3. If the plume does not require a Kl decision, the county EOCs can satisfy this EA by interview. I ARCA: None I

~31 I

I

I Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Arkansas Nuclear One I

Sub-element 2.c - PAD Consideration for the Protection'of PerSofis'with Disabilities and I Access/Functional Needs INTENT \..

'
*~ ._

I This Sub-'ele_ment is derived from NUREG-0654/FEMA-f{.EP.:\'_whicfi/~qWre:sJhat OROs have .the . *..

capability to determine PADs, including evacuation~ shelt_er!ng, and *Yl?'.ti~oq9;'if'appl_ic!3ble, for gr~_ups _of persons with disabilities and access/functional needs (e.g., hospitals, nursing home's, 'correctional .

I facilities, schools, licensed daycare centers, mobility-impaired individuals, and transportation-dependent individuals). The focus* is. on those groups of perscins\vith* disabilities iifnd acc~s's/functicinal needs 'that '

are, or pot~nii~ily wil'l _be: affecte9 by a'*r;:idiologicai rel~ase.fr6rn a~'r\.Jpp',:* .. ~: * .. ~;" '.* *.*'.. _; ' ' " . ,*

. .. . [ . '** ... ,. '.'. . . *'=. *. ~. ~ *' .* *,-_,_., . .,">:.** '<*~-"  ;-  :.. -~**': **~ 1*; .: ~* ......' ' *; t*.. '*'

I Criterion 2.c.1: Protective action decisions are made, as appropria.t~, for group.s of person~ with

"-. . ~.

disabilities and access/functional needs. (NUREG-0654/FEMA-REP~1,D.4; J.9;'J.fo.d, e) *

  • I Locatic;ms: POP-~ Coµ~ty EOC, ~~ss~ll~ill~;.~o~q~on c9,1,1r1ty [,:Q~. F!~~j_(sville; ~ogan County EOC, P~ris; Yen County EOC, DaiiviJl_e. * ... , , , . * , :* . * .: ;. -:

.. ' f~  : . ' t : " .* *.. \ ..*.  :..* ~ *.1' ~; * . :  ; .* -**~ *.

I EOP: .. '- ..

Lists ai:td proce,dl.fr~s,Wjll. beAerrior~trate.~)0.($,y~porting "groups of persons with disabilities and access/fimctio*n~i'.iie~~s". These lists will be reviewed by evaluators but will not be given to 'ev'aluators because of I " *...

~.IPAA/eq~i~e~ent~. A~~:ion_s '!Vi_!l,_b~ sillJ,u.~.~~~d:* ,, ; ; . ,

County EQCs wi.h act~aUy notif~/~11 pubii~ "$~t1o&f'~.Jstems/districts one

. ... 2.:

time during the drill IAW with th~lr p'rocediir~~: tif 'frie systems/districts are

~-'

I in session. * *** * .***t.i=-. *... **.~ ... *-~**('::*~-.*~~-~-~

3. If the systems/districts are not in session, the EOCs wiih>~ovide evaluator~

I . , ..: *.... ,:  :* *.*

the contact inform"ation for the schools arid' wilfsafisfy this "C;riterion via .

interview.

. . '. ' t ~* . .

ARCA: .- . *--<<t: .. None '.. **. ! ~* ***,::::."*.: ~*~;_ .-~:"H --.;l.:- :~* :, .."*:;-*.

I *******.;** ~-~---~l... ,;;~ *.;--~-------------*-----------';.-~*.:........;,.*****:.********** ~ **** ~.:~** ~~~~-~:.:,:;~.:~~.:.~~~L~*~:.:.;l:::~:~~-*----;.*----,;.* . "' '

I  :. ~: .~

  • . **  : "* '** r. ~ :.

. '** .:\ \~:*,*~ ... :...~~,;

  • ~ *~-~ '*! '

.:*".:. ~

I.' ~ ~ ;~ ~:~ . . _, ' . ::

' ~~

I

. l '. *: ..

I :t*'*. .1:

I . . . . .;' ... ',.j '/I,:

.I -.

I . '. '( t I *32 I

Uri classified

  • 'Radiological Emergency .Preparedness Program (REP)

I After Action Report/hnprovement Plan '* Arkansas Nuclear One I

EVALUATION AREA 3

  • Protective Action Implementation' .'* ... I Sub-element 3.a- lmplementatiori o:i'..Emergency.Worker Exposure Control I

This Sub-element.iscderived *frern'NUREG-0654/FEMA.:REP-1; which requires that OROs have the capability to provide for the. following! distribution, use, 'Collectic:in, and processing of direct-reading dosimetry and permanent record dosimetry; reading of direct-reading dosimetry by emergency workers at I

appropriate frequencies; maintaining a radiation dose record for each emergency worker; establishing a decision chain or authorization procedure for emergency workers to incur radiation exposures in excess of the PAGs, and the capability to provide Kl for emergency workers, always applying the -as low as is

'reasonably ach.ievab1e11* principle as app"ropr.iate... . . - . .. . .

I Criterion 3.a. 1: The OROs issue appropriate dosimetry,KI, and procedures, and manage radiological exposure to emergency workers in accordance with the plans/procedures. Emergency I

workers periodically and at the end of each mission read their dosimeters and record the reapings on the appropriate exposure record or chart. OROs maintain appropriate record-keeping of the administration of Kl to emergency workers. (NUREG-0654/FEMA-REP-1, J.10.e; K.3.a, b; K.4)

'. *; ~ <.1 {* *. r: **;:.** : i. * '.-. * * **" ~- * **

  • 1 I

Locations: * ;,AD!:flSEOF-rRussellville; .State Fie.Id ,Radiological Monitoring Teams (FRMT) 1.and

  • .. , . (F.RMJ;):2.,,..:.RusseUville; Pope Coun.ty EOC, Russellville; Johnson County EOC, . *

.. . . C.iarksviUe:; <!.;Qgan:County EO.C; earis;.. Yell, County EOC, Danville..

I EOP 1< ,..,*.:::.:E~pc>,sure control an~ monitoring will be. under the contrc;>l*of AN.Oat SEOF.

Dosimetry will be ava'i'lable to deploying personnel when appropriate. I

+_.  :*.:::': ;"':<.:::!-; (\'\ ~J.:::,,;i_:, ,,,"..-*: .. -~ ~-.; ,_._: . ' l:~  : .~* . *

  • i - - *'. '..' : :, *

,.,2.,'..*.;:*.,~ St.iji~.:FRMT~\will use,glQyes,.as necessary, Acc~ss to "a_nti-C's_"..Will*I;>~.

d~mo11str~~ed;; JloW~'!er, they W.iU not b.e \IVOFIJ.* After t!ie t.e_r:rl:iination .Qf,the exercise FMRT members will be prepared to demonstrate the donning and I

. << -:) *; :-.rern9yal..9t.':a~ti;C!,s_'? ., .Re,sP.irat.0.ry* pro.tection ~'Vi.11 NOT b.~ used. .~; . , .. , .

2.

t, ~( :*: ..~ n:,~

County ROs will demonstrate the EW briefing, record keeping, and procedures for issuing and returning dosimetry and Kl.

.. ~ \ . '

I

4. ;*~*~

"1/;:~*;*;*.:)*.':,:.*:'":.*.:* (' .: *\.." ~*,,.: :."***: *.~*.: ":' .~.

Jt *i~;A~Jo;~nsas;policyJo jss1~~.J.<J,onhrto Emergenqy,*,

Workers (EW) and instit\,Jtip11aliz?d ir:idi"'i.duals. Kl is not

'.*  :- 1;.

I issued to the general public. -

5. If the scenario..do~s not r,~qi:life a:KI decision, interview.
  • ORQ~ can satisfy this EA by I 6.

I ~ f The State of Arkansas may not consider the termination of Emergency

'< > *~

  • , .
  • t;, ;.)'19r!_{er* e.?,Cp,0~1;1re...control to)J~,.~,t. ttie ,end of the. "i:.>l.1:1me phase".

I

"; t: -_., ~ d~- -~.~*~f."S: ~ ,: -.*-:.. i'* ;':::;"' *.* ,_ .. s.** :"*: : .. : ~ (. ~ . ~ ~ . ~; ' *. :..

~ .... *. '~ ' 1 . t

  • 7, ** *,. : ~ Th~ ~ts~ing, pf JFWs WhQ ti~ve ing~S;ted .Kl woulci be d,eveloped after the
  • exposure forms are turned in. Because of the length of this exercise, this requirement will not be demonstrated. Each EW who simulates taking Kl I

will have a form documenting when it was taken. Thes~ forms would be the

. .. .. ... . . .......... basis for developing this. list. Forms .will be available for evaluator review. I I

I

I Unclassified Radiological Emergency Preparedness Progqu:h,(REP)

After Action Report/Improvement Plan Arkansas Nuclear One I

I 8. Correction-on-the-spot will be considered at theseJocatior:is at the discretion of and concurrence between the evaluator and the controller. Caution should be exercised to ensure that exetcise *play is *not intsr:rupted.:, " .. * . .

I 9. It is Arkansas policy to issue Kl only to Emergency Workers (EW) and institutionalized individuals. EWs who decline to take Kl may not be identified I *. 'ii1 advance. *If they*declineito take Kl:at their*dllty;stationsf they will not be 1

  • placed in positions thatwould . expose them to:radiation. . ; . . * *
. *, .' .:  : ~*11 i . :*  : ... .  ;  ; ' *  : )~  : . * ' \ *** '-: i' ':: * *, . : ' .
  • :.:.:  :'I;-~ *"'*~* *.. '. i*  : - .' '., * - '-*,: .... ; *.* ;; -*., * - : ( \ *.

I ARCA: None I,

  • .,*,.1.* .. *  :: . i;~ '**'

I Sub-element 3.b - Implementation of Kl Decision for Institutional individuals and the General Public .-.. ,_._ * *"...

  • ** *.. ,.i ~ ' ~ . ' '

'\ . ; ... \' :' *. * ., .... ,..... ,.

It',,~*.; _ , ~ '_j. \ i

.'<:.'- <'.;*,:J:;" . r *, ** ,:

I INTENT 1*\. ~ i

) I

"\

! ~

~,

This Sub-element is derived from NUREG-0654/FEMA-REP-1, which requires that OROs have the I capabilitfto provide Kl for*instituti6nalized.individ1:1als, and; if in the planstpr-0cedi.Jies\tcHhe general public for whom :immediate *evacuation may not be.feasible,;v,ery diffiGl:ilt, :or...:slgniffcantly.delayed. While it is necessary for OROs to.have the capability fo provide l<rto institutionalized ;in'dividuals, providing Kl to the general public is an ORO option and must be reflected as such in ORO plans/procedures. Provisions I must *inClude thef availability 6f adequate quantifies, ~torage,. and means ;of:distrtfuuting Ki.

~ :~ '.. '. . '. .* . ~ *: '.'** ~ _; ...:* ~~I *:: C; 7. ~

Criterion 3.b. 1: Kl and appropriate instructions are available if a decision to recommend use of Kl I is made: Appropflate record~keeping of the administration :*of Kl fdr'lnstitutionalized individuals and the*genetalpublic is maintained*. (NUREG-0654/FEMA-REP:,.ff~'. J:1o"::eJfY

  • ..)*.~*  ;*'.~, ....  ;* l;. *;_*~ .' ~*::*** . . ::,.. - .  :'~ *:* ~-~ ".~.: ... *~~.Y.!=':"

Locations: *. * *Pope' County*EOC; Russellville;* Logah County EOG,~*Patis;Yell County EOC, I Danville; Johnson County EOC, Clarksville.

. ** ' /*. ~-, - r; --~*.**~* ., -t. *? .*.--* \. :* :***\' '.\ ~-- *'.: -~~--~".:;.'.'

I EOP: 1.

1 *...

It is Arkansas policy to issue Kl only to Emergency Workers' (EW}-and institli.tiorializ'ea 'ih'dividuatsi\Kt rs not iSsued tb the 'Qeneral;p'Ublic~ .. "*.,'

  • c::,'..;:; :N?.: <* ,*:i;i*):.<id

.:*::* ..._:*  :~; l .~. *;~-d~:~: :S:d; (J {).-.. ;,;;;.~:~

I 2. If the scenario does not require a Kl decision, the County

* . Edes can satisfy this'EA by iriteiView:,iw*) ,,,.,, ' ,..:-. *.

I 3.

  • '4.

Use of Kl by EWs will be simulated.

. : . . 1, :;"

'

  • Correction-on-'the~spotwm be 'considered at thes~Hbcations at the

~.-;._ . : . .: ; ; *>1.*\ ~1.: :<~* .f::_ . !_.* -~*T discretion of and concurrence between the evaluator and the controller.

I .* ...

*
*'.(... *, Caution.should be exercised to*enst'.fre that= exercise play is not interrupted.
  • * ~ :_ .* * *.** , ,

!. ~

  • :  : * * ** , . * .: ** * * *. 4 ; . -,

.. ~,

  • ~.\
  • ~* 1* *: ; ':'";-., e-:~.

.* \'r.*,;

. )-~

_r..***,:;',:: ~

\

~ *~*- . . **

.. None':* * *: :* .. : ~ '" rr~ *. -.. { * * * * *

  • I ----~-~----------------.;. ......:...........,;,.....:...:...................****..'** .i.:.......~,;,. **:.;.:..;.;.~.:.L.: ***~.a.**** J....~~---.;. ..................................

I 34 I

Unclassified

. Radiological Emergency Preparedness Program (REP)

I After Action Report/Improvement Plan -* Arkansas Nuclear One I

Sub-element 3.c - Implementation of Protective Actions for Persons with Disabilities and Access/Functional Needs*. '.;*,,*_*-:. * "~---., * .' -- .. _ .* : * " * *_ -, --*

INTENT I This Sub-element is'di9rived frorii.N0REG~0654/FEMA-REP.,1-i which requires that OROs have-the -' - * -

capability to implement PADs, including evacuation arid/or sheltering, for'all persons Witfr disabilities and access/functional needs. The focus is on those persons with disabilities and access/functional needs that are (or potentially-Will- be) 0affected-by a.radiological .release* from 'an 1NPP* * * *-

I

'*"' -~.**.~:1 '.~~*:~:.:*.::f ~.i: ':.*:.~~;~. ',/** 1 ~** ~-.' ~ *:*1* .!:-** .. **,,

Criterion 3.c.1: Protective action decisions are implemented fot persons with disabilities and access/functional needs other than schools within areas subject to protective actions. (NUREG-I 0654/FEMA-REP-1,; JAO.c, 'd; 1e, g)1,* :: . *i _- '" ,;<, *-~* "'-~! i. ' ' - ;

  • Locations: Pope County EOC, Russellville; Johnson County EOC, Clai:ksville; Logan County I

-* '*" .< * *Eot" :-Paris' *'fell 'Counly Eoc Danville'. * . * * -*' ': * : -; *

~ ~*

I

' ' * \ *,  ; * *  ;. ' ' ' 't' I *} * ; : *,

  • EOP: 1. _Lists c;ind procedµres will be demonstrat~d for supporting "groups of
t' .'* ,, _..,,., ,, ' - .
: per~~ris' witifdlsabilities 1and accesslflmctional needs", if required by the
< 0 J "" ., *: *; -, Scenario; 'Actions will IJe*siinufate& .,* ' .* ".~,_, .. -

0

'~'.'-  !

i~ *:, i ... :.

;
;**-~~.. ~ ._':1::' 1 '*  ;~*:* *' T , ,**" ~

If cbrifatting a transporfatioh*proyi~er:i~ n'ot'dem*o'nstrated, a controller 1" .. : , ; ~ ,\* *: '*

I

-.,,! . ,,.'. '. :' ,* * -~- in)~ct\yill 'iie*;p~ovided~ Ohly one provider will be:cictually contacted at each

'"**'-' .,., - *'*--EOC. ' 1 *'

I

  • i :'*' ~ '. )-~ ........ <:*';. '.; ,);"J ~}' .:~*~(:t !'."*' .:~. '  !. . ... '* . '*,

ARCA: None Sub-element 3.d. - Implementation of Traffic and Access Control

' * '~ < , * * ., I t ' , '

I INtENT' This Sub-element is derived from NUREG-0654/FEMA-REP-1, which requires that OROs have the I

capability to implement protective action plans/procedures, including relocation and restriction of access to evacuated/sheltered areas. This Sub-element focuses on selecting, establishing, and staffing of traffic and access control points, and removal of impediments to the flow of evacuation traffic.

I Criterion 3.d.1: Appropriate traffic and access control is established. Accurate instructions are provided to traffic and access control personnel. (NUREG-0654/FEMA-REP-1, A.3; C.1,4; J.10.g, j)

I Locations: Pope County EOC, Russellville; Logan County EOC, Paris; Yell County EOC, Danville; Johnson County EOC, Clarksville. I EOP: 1. The RO will issue Dosimetry, Kl and brief the Deputy assigned to the T/ACP as appropriate. The Deputy will not drive to the location. The Deputy will I

talk through the T/ACP, monitoi:ing, and EW exposure control procedures.

2. Correction-on-the-spot will be considered at these locations at the discretion of and concurrence between the evaluator and the controller.

I Caution should be exercised to ensure that exercise play is not interrupted.

I ARCA: None

,35 I

I

I Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Arkansas Nuclear One I '(>; ;*. ,*I.* **. ~ 1' . ~::

I Criterion 3.d.2: Impediments to evacuation are identified and resolved. (NUREG-0654/FEMA-REP-1, J.10.k)

Locations: Pope County EOC, Russellville; Logan*County,EOG,,p;:aris;.YeU County EOC, Danville; Johnson County EOC, Glarksvill~. .. , . *.*: * .r ,: . : * . , * ._..

. : ... ::*: Jt ~; . : 'i' .. '~h . l EOP: 1. The EOC.representative will .talk througf] th~ proc.~dur~s that dem9nstrate the capability to identify and take appropriate actions concerning I impediments to evac1.1.ation,.

' * ' * . *. .. . ' '*i *.. *.. '. ': *:

. ; -~.i

., *. * **,,. *., ,.- ...... -~

. '; 'y:  :. ~ . * .. , . ~- ' .. ,,; ;1' ~ \ . ;; .:,**

2. An inject will be inserted after the evacuati_o_n *has .started.- Th*e inje.ct :will I 3.*

require the re-routing of traffic.

1°!  : ~' ' ,~,, ,.

If a GE has not been declar~dand;evacuatic;ms trnve not been ordered, this

, *~ /  : ,

.. *.:.~ ....,J *, ;,,, ,'*,
1\

1.' *' ..

  • _!

inject will be inserted out' of' sequence. . . ' . .. . . . .* . ...

I ... '*

4" .

~IJ EOCi;; 'l\Yill ~iscuss bow.tt')j$ rqad c;:lpsiftg. infor~ation and re-routing

    • . ". *.;' '*"  :~:;  :> . .

in.formation will get to .the public. 'One;County 'EQ_C :will contact the SEOF with the re-routing information. The LGL will pre'pare a Public Notification

. Mes~age and p.rovide ,the.:re.. r9,\Jting informqti.t;>. r;l t~, ~l,le ENC .. The LGL will not transmit the PNM. but will. explain the distr;ibution. The ENC will prepare

.a News Release and wili pro~ide' the Releas~ *~6~.* "'JIC for briefing to the to media. The other Counties will simulate providing.the information to the LGL.

I ARCA: None Actual dispatch of resources will not take place; ** * * * * *

  • I

.--------------------------~------------------------------- --------~-;--.-7"""""~!:

. . ~

I *, ,'.

. **1,

' ~;

~

. ~* ~

I '7.:.

'. .. \ .. ~*

~** '

i *,

  • , '**,/ . :.

I I -"; ,:

~  ! . \ .* ... ....... '

,,
* *.. *; .\,' '*' . ' _-,  : ** .' (_, ** ' * > ' *  : ~ * '. ~ i ..*.'

I '.

.<* 1:-::r:.'.... - . -~~~*~.~.-:* ~..... .)

  • . '7 .' ,d.

,;. .. *'*"h

  • ~

I

  • .* r ~: *  : ~ (* .  : ;*,.  ;

.' ~--'. '

I 36 I

Unclassified

'Ritdiblogical Emergency Preparedness Program (REP)

I After Action Report/Improvement Plan Arkansas Nuclear One EVALUATION A~EA 4, ... ** ,_,,_-.,-.: *-:. . . . .*

I Field Measurement and Analysis' ,, ** *: '

  • , .~ *,

I Sub-element 4.a - Plume Phase Field Measurements and,.Arialyses .., . .J : ' : .

INTENT I This Sub-element i§:Q~riv~<i frornJ\JUREG~0654/.FEMA-R.EP-1, which requir~s,that OROs have the capability to deploy,fMTs ,with the: .e"1.l!iPm'311t; *rnethod.s;' and e~pertise, necess,C!ry to determine the location of airborne :r:ac:.jiation *c:irc;l parj:icu.late c:.jepositipJJ on thE;l:ground from ar;i,_airborne plume. In addition, I

NUREG-0654/FEt0A-~EPi~1; i11d.i9,at~s that QRO~;rnvst have the capability ~q. use FMTs within the plume exposure pathway EPZ to detect airborne radioiodine in the presence of noble.gases and radioactive particulate material in the airborne plume. In an incident at an NPP, the possible release of radioactive material may P.O!?e q.,riskJo*the ne;:i.rby. pop!Jlatiqn <;:1nd,,environme11t. Al.though inc.ident as.i;essment I

methods are available to project the extent and ,magnitu.,d.e ofa releasE;l,* these methods are subject to large uncertainties. During an incident, it is important to collect field radiological data to help characterize any radiological release. Adequate equipment and procedures are essential to such field measurement I

efforts. . ". -:',~.:: . /. ,,,., *:*. \. *- -.,.,,_ , ,-... ; ,. _... ., * .. :. .

  • ~

', ;..'i.

4.a,2: F.i~ld te.~.111$ .(~!'Jf.JTJJ),t;e).,<;1re rn~nage,d to_ Q.btain'.suffic_ientinformation_ to help characterize the release and to control radiation exposure. (NUREG-0654/FEMA-REP-1, C.1; H.12; 1.7, 8, 11; I

J.10.a)

I

  • c , .** . . ,

EOP: .. * . , - . -~:.-'- .: ,d?!~e .. f~MT~ will f911ow ttieALARA;Policy of,th_e Ark,ansas Depai:trn.ent of t-l@alih._, Teams wi_ll not routinely traverse a plume. State Teams will define the edge of the plume. Air

..c I

.. , , . '*' . . :*iI*;::~ ,~a.!Tlple~,wilf:beJaken in an:~as reading near 20 m~hr or as directed.

I

2. Air samples w.illnot be,.transp_oi:ted.~ The.team, :member will discuss the process for transferring samples.

{_~;-,~~-!:..:-~.r:.~.?.:*\~_.~, .:,*.. -*  :**".*.1'

. ,., *;-. ,(,. * , , . 3. , ,_ ::.Gorrection~on-the-spot "'!.ill be_c9nsi~ered,at th_e~.e*lpcations at the t *,r . .. . I

.* '.": y . , ., .: : ._, ;*, 1 .1.c;iJ~~r~ticm ot:,ai:i.~ conq;..irr~mce be~ween* the e.valua~pr and the controller.

"'* ;, .* . , * ; , , , :;.:\~*.;;;,Gl\l.\1~~0.1;1,!;flPµlq:~~.~~ei::cise.d to ens,ure that e~ercise play is not interrupted. I ARCA: None

~--":"-.~--:-~-~-----::-*.--------~~--~~~~-~....-:~"":'*.--~~-~-.~-~~:""~~-----~-~--:~-~-:~-:---:-----~---.~-~-----:-.~----.~-------:~~":"-:.---------------.-~--------~-~.---~------

I I

I I

I I

I Unclassified Radiological Emergency Preparedness Program (REP)

After Action. Report/Improvement Plan Arkansas Nuclear One I

Criterion 4.a.3: Ambient radiation measurements are made and recorded at appropriate locations, I and radioiodine and particulate samples are collected. Teams will move to an appropriate low background location to determine whether any significant (as speciflrad in the plan and/or . **

procedures) amount of radioactivity has been collected on the sampling media. (NUREG-0654/FEMA-REP-1, C.1; H.12: 1.8; 9; J'10.a) ** * * ::\ *': ,:;..:;:.>" . , , .

I Locations: State FRMT 1, Russellville; State FRMT 2, Russellville I EOP: * *-* 1; * *'

  • State*FRMTs will follow the'ALARAPo-licy 'Ofthe;Arkarisas Department of He~lth.* Teams Will 'riot routinely traverse a plume. State Teams will define-the'edge ofthe plume. 'Air

. ~ '* .

. ' samples will be taken in areas reading near 20'rr'IR/h'r 'or as I directed.

~, ., -. . '.

~ '. .: . i Air samples will not be transported, The team member will discuss the I process for transferring samples*.

.1*.1' *.

3. Correction-on-the-spot will be considered at these locations at the I discretion of and concurrence between the evaluator and the controller.
  • Caution- should be exerc!~ijd to ensure that exercise pla~ds not intefrµpted .

.. ' **~.;-~-.;-,;.;"'."~~- -.~

I 4.

5.

Air samplers will not be purged.

FRMTs may be asked to describe all procedures"'i'fot:.:demonstrated.

I 6 ..  :*Charcoal canisters wiff be* used instead of SilVefZeblite. Si.Iver Zeolite canisters will be available for evahiator review:i;*;: :~. u

7. Sealed kits do*not have to be inventoried~: However; FRMTs can inventory I them if they want. , *** : " ::

"8. " Two teams v,;m be dep.loyed to the field*

I * ' j

  • 9, State FRMTs will use gloves as necessary. Access to "anti-C's" will be demonstrated;* however;*they will not, be worn.~After'.the termination of the

'* * * * *.** , : : exercise FRMT members will be 'pre'pared to'.demo'ri'strate the donning and I *" '*. *. **removal of "anti-C's"* at theArriiory;*R~spii-atOrj<prO'tection will NOT be used.

I ARCA: None ***.**.*.

    • * ** * ** < ***** ********* ,,., ... ~ * * ***-*-~- * * ~~**** *-~ *** ' *** .., ***

I I

I I 38 I

Radiological Emergency Preparedness Program (REP)

Unclassified I After Action Report/Improvement Plan Arkansas Nuclear One EVALUATION AREA 5 I

Emergency Notification. and Pul?l,iec Information

',;I~ *' ~: *

  • j'.',.",\ *~.""'*..... _.,--;., . .:*:\:*..:."*\ .. ",' :l ,:;'*\.; ~; ~

I Sub-element 5:a ...- Activation:;ofth'e;Pr.omptAlert and ,Notification System INTENT*

~- ~r
~*v i .  :~~ *".*.**,~--:,,..c:~.::;*.;;. :*::**.:.::>:*:~** .. *'~ )~

.*1

.:. ~ .

~~:.**..

\*

I This Sub-element is*d~rivedfrom.NUREG~0654/FEMA-REP-1*, whi.ch requires-that OROs have the capability to provide prompt instructions to the public within the plume exposure pathway EPZ. Specific provisions adElressed:in:this_ Sub-el.ement are der:ived from the Guide for. the E_va/uation of Alert and I

Notification Systems for;Nuc/eal:Power R/ants,:FEMA-REP-1 O (November .1985):

I ..: '

' , l ~ '

Criterion 5.a. 1: Activities associated with primary alerting and notification of the public are

,* I ; "I /  !

~

r. .. * ~* !

. *' 1 ** ' * .' .* *.*

I complet~dJn a:,tifnely mannerfQ#9wing the initial de,c;isicm.by authorized*offsite emergency officials ta notify_ the pµbfip- qf ,an errrergencM situc~tiqn *. The initial instructional message to the public must include_ a$ a minJmum:*~he elemf#nts. r,equired by,curr.~nt Rl;P gµidance. (NUREG-I 0654/F~MA~REP-1-, :E,_5, *61. i) ,._ . , .,: . " --';*.- :, . ....

Locations:

..

  • f*

I SEOF, Russellville: NOAA. North Little Rock; Station KXRJ, Russellville.

I EOP:

1. The EAS is not used for ANO alert and notification. The alerting is accomplished by the activation of the siren system and* the tone on the *
  • .I.

NOAA radio. The notification will be demonstrated by the simulated

b,r!:)adcas.t of ttie message on NOAA radio and simul~ted, re!l'lote ~ake:over I of KXRJ's transmitter and the re-broadcast of the NOAA message.
  • ". <: :f;;i'. :-*,, '*': ...-..
a. If the Local Government Liaison (LGL) position is staffed at the SEOF when the first PAD is issued requir:ingactivati,an of the I

. ,*::.-*. _:;,,.-,. ..- .. 1. *--" AN.&: ... - - ,_ ,,-

i.

~ I . '
  • ,* ,1) Th~ activatiqn of the siren system will be.demonstrated.-at I

., ~~\ i.

.. :,;'.*.,.i,\*,::-1 :,- :- *r ... :*the S~OF ... _ _ . _ _ _. . .

.:.*.* .:. *.--. 2) Ernergency Messages will be completed by the LGL and provided to NOAA for broadcast. - '>* I

~ ... (  :. .. ~A *,s:~ ***.1oY: *_. ,::--: ~-~*r;**.Jf. 1t.h~*,.~qi.,,positio~ _is s~aff.~d ~~-the.,~~~~*~ -~ffices when ttie..firs~

  • I
  • .- * ~ :*:* *'" ::i.: .. ; \' P.~P:i~dssue~ requ!ring a_ctiv,ation oft.he ANS~1 .- .  ; " .:

_ , .... -,< ... ,-. " .. 1_ -: ~':., -_t}.Tt;ta activation of the siren system "Yill be demonstrated at the NP&RP offices.

2) Emergency Messages will be completed by the LGL and I

,_..... prpvided

. ~: i.,} ~  !

to NOAA for broadcast I

J i"' . , . : _i ! .' ' * ' I,.,;' ' . * .*. *: **;

  • . **.*,, f*.
* *. *-' ' '*, *.:~  : * '., * :  :. r, ~, ' ~  : r . .. >. :;* ..~ , .. :" . . \i I

- '{* .. ' . - '~ . *.  ;.,: ;* ****'. **.i:'

'}' '

  • 39 I

I

I 'Unclassified Radiological Emergency Preparedness Program (REP)

I After Action Report/Improvement Plan Arkansas Nuclear One I 2. No sirens will sound and local radio messages and National Oceanic and Atmospheric Administration (NOAA),messages wilt NOT BE BROADCAST.

The siren activation will be simulated. However, the procedures should be demonstratedup to the'poi11t*ofactua/actiilation;*::1n Arkansas the County I Judge is the decision maker for protective actions. The TOCO only recommends actions. Since the State does the "alert and notification", the State must wait until the final Judge makes a decision to agree with the I 3. .*

recommendation before the *~alert and *notificatioti'?: begins ..

. ' ' ' *I  ;

Local radio message sinfulation will-be demonstrated at1 radio station: KXRJ

. ' ' *.,  : : *:* .* 1 *"r' * ~

in Russellville.* A site visit will be made to, check ,equipment. The *remote I takeover of the KXRJ will be simulated at either the NP&RP office or the SEOF.

\ . . . ' .. , ~.1' ' .*

I 4;'* NOAA message simulatidrhiviJI tie dern'onsttatediatthe*NationalWeather Service Forecast Office*i 'North little *Rock: 'Any reai emergency will take

  • '-'precedence. Procedures-to broadcasttHemess~ge,will be'fully ,***

demonstrated as they would in an actual emergency up to the point of 1 I . ,*,

transmission. Broadcast of the message(s) or test messages is not required.

' . . ~ .: . ~ .,~-- ~** (, .. *:'~:-..;**: .. ~.*{ ~-- .. '\**: *,

I ARCA:

5.

None Route Alerting is not a Primary ANS method. It will not be demonstrated.

.; .

  • t,

.;..;.---~------"".--""~-------- ---fio**----~------~---- ----,------.:.~-:"'~~-~----- ... ----~~-"'.",;,~..i.t-~... ~-~-,.~i!-~!"'--------------------------------

I Sub-element 5.b - ErneFgency Information ahd Instructions:for the'PUblioiand the Media I ~* .: ~ , *. ' ,, .. ~ *.: : ,'*' *f- -;-;

I INTENT

.. ., :* - ~ --~~

This Sub-elemenf is derived from NUREG~0654/FEMA-REP..1, :which requires that OROs have the capability to disseminate appropriate emergency information and instructions, including any I recommended protective actions, to the public. In addition, NUREG-0654/FEMA-REP-1 requires OROs to ensure that thEfcapability exish:Hor providing information to the media. This includes the availability of a physical location for use by the media during an emergi:lnby; NUREG-0654/FEMA-REP-1 also provides I thaf a system must be available* for dealing with rumer's'." This system will hereafter be known as the

-public inquiry hotline.II

  • 1 *...* * * , ' : *.:.* ~i Criterion 5.b: 1:' OROs pfo"Vide a"ccurate subsequent emergendy information and instructions to the I public and the news* media ih a :tinieiy manner. (NUREG"..OSS~IFEMA-REP-1, E.5, 7; G.3.a, G.4.a, c)

Locatitins:

  • ErriergEmcy'News Center, Russellville; AltEirnate Joint Information Center, Little I EOP':

. . . .~

Rock.

. ' . * - .. ~ . '

\ .. . ;~ \.'>

    • .. '. .. *'1-
1. Med ia' kits will be provided by'EritE!°rgy at the AJIC.

I 2. Rumor Control activity is staffed by ANO employees IAW Entergy plans and procedures.

3. The JIC and Rumor Control will be in Little Rock. They will pre-stage!

I 4.

5.

County representation at the JIC will be through the ENC Liaison position.

County personnel will not be at the JIC.

  • State News Release will be written at the ENC.

I ARCA: None 40 1.

Unclassified

'Raoiologic;al *Emergency Preparedness *Program (REP)

I I

After Action Report/Improvement Plan Arkansas Nuclear One

'i

._._;__...,._~--*--*---~"

I

. .' *~ -"~ .*.;

I

~ *. l'

- .. .. ~. Emergency Planning Exercise .Package Review I

I Exercise Date: August 17~.201&

I I

I

( "'"'1" j

I

_
_:.:..:s;~~~q_.L:!:::::::::......:.~~.....:.~
J1. /;_6.

Pate

  • 4~~'

I

        • r

. .:.(. 'J' ..

I I

I

' .I'*

I I

_~ .". .

I I

41 I

I Unclassified Radiological Emergency Preparedness Program (REP)

Arkansas Nuclear One I

After Action Report/Improvement Plan I .. .*

I I

  • --- Enterw. ' ~;* .

h~9!f OpliTBllOMI, 111~.

IU!l!;.ft 388 1'luzalo.ill1*, l'<R 7WP.

r.i~-

Sb:pltonio L F')~

Monllgft", ~loby ""'"'""""'

,,Jk1:111:ia~ >;.xkl:Zr Ona I OGAN0616Cl1 1o CFR 2.390 Enclosure Wlthha Id June 17, 2016 I U.S. Nuclear Regulatory Commission Atl~: DoCUn'lE ot CoJJtrbl De5k I Was:hlngllm, DC 205fi5-00C1

SUBJECT:

Emergency Plan Full Partic:::ipation Exercl,ga Drill Scerwrio I Arkans.as Nuclear Ooo - Units 1 end .2 Docl<9t r..cos.- 50-~ 1:9.

License Nos. DPM1 and NPF-6 aoo 50-~ElB:

I

Dear Sir or Madam:

In accon:ianc.e vJllti tha pr011lsh:x1s of 10CFR 50, Appendix E Sectioo IV.F.:2.b, Emrgy Oparatloos, loc. Is prmAdlflg lhlil full partrcrpatron r;n::arc~a*scenario plirsuant to 10 CFR 50.4 I Elt least 60 days prior to the drill at Arkansas Nuclear. Om~. Enclosed please fino:;I t.~e.drilt . .

scenario for tM lull participation ro:emi:'le Miic_h ~currently schedule.d fo<:AuguSl 17, 2016.

Mirror dia.nges ma~/ be nieida prio~ to drill pertorMalice btl.9al'on dam'meriffi receiv~d trotn 8xt9rrnil a.gencl<5.

  • I Entergy f<!lle5l5 tha* the enolooure 'A'hich contains ooniidentiBI information be wllhheld rrom publio dl$olosure il'I a¢CordaJJiee 'a\ltth 10 CFA 2.390.

I There are m1 new commitments contaiood in this submittal. If i11lotmatl0t1, pl&a$e con1a01 ma.

Sincerely, ycu nel'ld any addmonal I

'?!J:Cfl I Enclasura'. Full PMicipatian E:xercise Drill Scenario I This letter contairis coofidentia.1 informaoon - The endosun! is withheld from p wlic rnsclm;wre per 10 CFR 2.390.

I I 42 I

-Unclassified Radiological* Emergency Preparedness Program (REP)

I After Action Report/Improvement Plan I

Arkansas-Nuclear One I

r' OCAN001SCl1 Pag~2 cf2 I

This letter cantaiM conllderitlal information - The erii:lo:>ur<! is withheld from pLJbllc clisdosur!! IKi' 10 CFR 2.390.

I (with erit:losi.rre)

Mr. Paul Elkm.ann U. S. Nudeat Rei;Jul;;rtory Comrni~5ifJn, Resi1;111 IV I

1800 Eas: Lam<ir BQ\lle'll~n;I Arlington, TX 70011-4511 (will'.ool endost11'8)

I Mr. Mere Dapas Regional Alimiriistrat(lr U. S. Nur.Joor Regul~tmy 1600 East Liimlilr Boulevard Cclmmissloo; R@gjon IV I Arltngtan. T;Y. 7001 f-4511 NRC Senii;ir Re!>identlnS1Jet:k1r Arkarisas Nu<:lear OM-

  • I P.O. Box 310 I

lon1t, AR 72S47 U. S. Nuclear Regl.datOflJ Commlssioo Atbi: t.tr. Slepllen Koeiik::k MSOO 8,A One l/llhite Flim Nortti 11555 P.adtvi~ Pi\e I I

I I

I This letter c;x;irrtains t:olliiiklllial informalbri - The em:mura Is wlttihetd from pub! le.

dl6CllJ9ure per 10 CFR 2.390.

I I

I 43 I

I Unclassified Radiological Emergency Preparedness Program (REP)

I After Action Report/Improvement Plan Arkansas Nuclear One

~-*-""':*-* ':"-. ... . -

I I

I I

I I  !:nclosurt1 to OGAN001601 I 'F'ull P11rtlclpatlon E11&rclsa Orm Scenario* .. * .. ,*

I  :.:*

I I

I I

I Th i;i letter ccntam1 i;cnfitJenlial infomiatkm - The el'IClosure is wllnhald ftom public

~i5ciosllre per 10 CFR 2.390.

I I

I 44 I

Unclassified

  • Radiological *Emergency* Prep_aredness Program (REP)

I After Action Report/Improvement Plan Arkansas Nuclear One I

/' .

I

' ._; i ' ,~~ <:' ".,~,. . . . '*1 -- NRC EXERCISE I AUGUST 17, 2016 I

I DETAILED I

  • l I
        • SCENARIO
  • L*.

I I/ * ' ' * ~* "  :'.!. .,

I

. -~ *~; \ '  ; :_;

I I

,; : I

  • ~.:;I.,,' ','\ -*
  • I

.., . .. : . ~ '.;  :,* * - "1

  • i**

l'.

. '*-i.

I I

I I

45 I

I *Unclassified Radiological Emergency Preparedne~s Program (REP.)

I After Action Report/Improvement Plan Arkansas Nuclear One I 2016 Emergenc'I Preparedness Exercise (REX-16}

I ,r*-'nltla1 Conditions

\. __ )

  • The planl has been operating fo~ the rkst 2BO days.at 10d% power and Is at the mlddle of core life. ., -* ': ';

I

  • The 2P-38B charging pump ~s out of service for an oil baffle repack. Wofk t.egan at 06~00 thls morning. The estlmated completion of tile PM ls 10:30today. The oil has bee-n drained and I the crsw is exiting the plant with 1he drained <;iii.

g;cenario E**;enl Segue nee

  • I 07:25 A NOAA radio broadcast for a Severe Thunderstorm Warning tor Pope and Yell Countl es occurs in the Control Room.
  • 07:33 A NOAA radio broadce:st for a Tornado Waming for Pope arrd Yell Counties occurs in I the Contro I Room, a

.4.NO Site Securtty rei)orts to 11-ie Control' Room that J1ea\.y rain is occurring and that a tomado hae been spotted on. the ground south. of the firing range moving tovro rd the I at oorti1. Trees aod. debris are* flying around in' the air ~his time near the firing range and debris has be-en thr0\11n over th~ roadway lea,ding from ANO to Flatwaod Driva. No

() darnoige has occurred in th~ Protected Area of the pl<ilnt at this time.

I 07:4{) Dua to wtitar ingress into itie motor terminal oonnection box, the A Ciri:: Water Pump (2P-3A) will trip.

07:41 As the iomado mm10s to the north/northwest, trees ;;ind other debris ars thrown into the I air with ::.fgnif~nt debri~ falling into the Emergency Coo ling Pond ~ ECP). The ECP instrumentation pa.net at the ECP fenced area. will be damaged 'o\ltien a large traa was thrown into the- ;;i.rfla. There is a vehicle turned upside-down end driven nose-do1Nn into the sucti!'.ln valve of the ECP. The t-0rnado, moving toward the nol1h'wesl, ~lfts Into the I clouds and dissipates before c::rosclng Hwy. 333.

Wlltl the damage report fr~m the tornado. the Unit 2 Shift Manager will ala ssify an Alert emergency class based upon U1e following EAL:

I EAL ttA6

  • Na'ltlral or destructive phenomena.affei;tlngJllIALAREAS,:
2. Tornado strik;ng or winds> 67 mpn (2 minute average} r~sultlng ln VISIBLE I DAMAGE to the Ultimate Heat Sink (Emergenc:t Cooing Pond).

ThF.1 Emergency Response Organization {ERO) will be notified of tha ALERT daclara.tion vla the ERO Nol ifica.tlon System {ERON~ and will be instructed to re po rt to their I ()

assigneo Emergency Response Facilities. Offsite notifications ta Local, Stats and Fedaial agencies Vtill be performed by the Cofltml Room for th~ ALEFff emergency classific;otion in o;i=rdance with Pmcedure 19Q3.011, ~Emergency Response/Notificatiom;' _

I I

I

..46 I

Uriclassified

'Radiological*Emergency Preparedness Program (REP)

I After Action Report/Improvement Plan I

    • Arkansas Nuclear One 2016 Emargency Prepilredness Exercise (REX-15)

I A vibration aian'n isreceh.*ed in the tl-2 C<introl Room for Reactor Coo[<int Pump 2P-32D. lmmsdately after-the vibration .alarm, the 2P-32.D shaft shears_ An automatic reactor'lrip slgMI is received, but the reactor does not*trip_ The RPS manual trip of the I

reantordoes notfunotlon, DSS dnes noHunotlon and the reantortrlp wlll have to be perfonnec:l In the Control Room by de"energlzlng 4.90v buses 2B~7 arld *2 B-8_ A Site

,ti,r:~ Ein;ergepcy (SAE) e.rrierg~no{\llassifi('.atJori bfised. upon 1ne ~llowlng EAL: I EAL SS3:. 1.a -Ari automatic trip failed to. shutdown the reactor AND.1.b - Manual

.. *:act.ions taket;l at parial Cfl3{ljnii1) *or 'panels 2CU3t2C14 (Unit ::l) do not shutdown

. th& rea~tor as. lndkiit&d

. . , . . . '., . ' ~. . .

by reactor r)o\iter:;. 5%.

. I

  • Offsite au(horitie-s will be notified of tne SAE' cl as.-sification in accordan c:et' 11\lilh Prococ!ure
  • t 90J. 01 1, "Eme!!;Jency Respo11se!N otifications~ *.

W itllin 30 rninutas of the.SAE dac:laration, a II requirad prooedurs ar.tions will ha \18" baan I

performed for the*ev.aciJation of nori"e$sential personnel from the Protected Area and Sita SE1cur1t:; will hcivs provided ths Initial Accountability Report to fue TSC l;msrgency

. .Plant Manager (SM ifTSC EPM i~ root available}. Note: Nan-essential per.;;onnel will to

' be.e:...Elouate~ the parking 1otonly until persqnnel aoc~:n.mtability has.been completed.

I

-0900

. The Tt:chnical Support Csnter (TSC), Operational Support Cflnler (OSC) and the Emergency.Operations Facility ~EOf} emergenq1 response facllltles should be staffed a.nd **~Operational". The EOF Emergency Dlreotor will ha.ve a5sume"d or be In 1he I

( 'prooess or assuming Ernergency Direction &{;ontrol (ED&C) from the Unit2 Control

~*'

0915

  • Room Shift Manager.

' . The: Felled Fuel. Iodine Radiation Monitor 2RITS-48068 in the U-2 Control Room will I

<' * ** . indicate*1.3E5 counts per minutB {cpm). This value will ind~cata 1hat fuBI Glad degr.:iclation is greater than T~chnlcal Specification oillovwble limits. If not alr'lady

. reques.tei;I, ~e U-2 Control Room will request that Chemistry perform RCS sampling to detetriiine Res* activity 1eve1~5. * * * * . **

I

'  ::.~ . *. ' . : .. ' .. ' .

I

(

09;30 *

  • The 2P-36,8 , charging punw trip~ di.le to a failed urioer-voltage relay. An NlO a11dlor an
  • .' os:c r~p*~i~-t~"'J'.Tl v.iill be "ii;;;patched to evalu:;tte thei pump. An assei;;;~ment of lhe pump

'. 'iMll :i~cfibata ihet the relay must bi$ repl.ac~d to restore the. reunotl3 "start. c~pability o1 the pump_ An NLO could be directed by the cnnfrol mom to lo~lly start the pump 10:15 A 2000 GPM Loss of Coalant Acnldent {LOC..li,} will oi::aur on the RCS "0° Cold Leg rale~sing radioact:ivs prirh.ary caotant inkl the Containment. As a. result af the LOCA, I

fuel dad~lf'lg failure wtll_ l[lcrease to approximately 3% as Indicated by both the Containment Hlgti RangeMonltorn and the' RCS Semple Line 2TCD-19 (If Chemistry l)as*aligned lhe RCSfop;ampllng).* . I

. ' . ~'Vhen; the 't:ontal nrrieri t Sp ray Actuation *sign a I occurs. The "B

  • Contain menl Sp ray

.* Pump wl II run for 5. m ln.Utes" then fail. An electrical (and possibly rnechl;lnical) maintenance team wili be dispatched by the osc tO investigate "tha prohlam a11d will d.eteonine that ttie"motor fieeds to be rep~eed due to shorted motor ;j'irindings.

I EXpeded time required' to rsplace the motor is 8 tiou rs.

I 2

-* -************-*--*--*---------*-------~

I 47 I

I

I Unclassified Radiological Emergency Preparedness Program.(REP,)

I After Action Report/hnprovement Plan Arkansas Nuclear One I . 2016 Emergency Preparedness E>tertise {REX,16)

I The "A" Containment Spray Pump '11"111 fell to start on the SIAS .. Ari OSC repair team will

  • be dispatched tQ evaluate the "N OlnlalnmenlSpray Pump and wlll determine thal ttle supply breaker for the pump t&as failed due to ttle l:lreakei:can1 roller failing ~md the

. brsalmr should be able tt} oo repaired v.qthin 2"4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />s:

  • I With tha LOGA occurring in. the Containrnant Bulld~t19 and tha't~ilurn of the Containment Spray pu rnp:s, pressu rs insids Containnisnl vii II be inC:reaSing *significantly_

When SIAS actuates, 2CV*3850~2 r~t8i..:Ces a dosed .signal and ths cabling for 2CV-I -3800-2 fau1ts in the CNTMT pehetr:atiori (2WR-40~2~. Th'e .iwqVJ.*1CC br~akers {28*

fi3E 1 and 2B*63F2) do not open as. des.1gri ed _ The :2.B*S3 bus Will lock out as a res.u It of ths brsaki;irs not opsnirig. Ttle CNTMT pene.tration is.damaged and is*now releasing I radiation in the Upper North Electrical. Penetration Room;*

Other impacts from lhe loss of 28.-:63 tius are~ loss of power. to the service water valve5 for the green train containmenl ooolers end the loss of. power lo th-a CNTh1T I coolers 2VSF-1 C/D.

Area *Radiation Monitors will be\]ln to lndlGate Increased radiation levels In the Auxiliary

'Building and the Penetration Room. The Super Particulate lodin~ Nob[a Gas (SPING)

I MonitfJr 2RX-9835 on Unit 2 will begin to indic"...ate a radiological release vis ttle penetration ventilation system- The increased radiaiion levels iri thl:I plant and the start of a radiQlogical release via SPll\JG 2RX-9835 ¥Viii be not-ed and svalu;;ited by botti Radiation Protection <"Jnd Dow As5e:ssment personnel aoo vuill be-communicated to the I 10:30 Erne rgancy Director in ths EOF _ ** * *

  • Based upan the RCS li;iakagia, clad fatlureand radiological release rn progress, the Emergency Director should dedars .a General Emergency classifir:ation in .accal'dar.ce I . with the fol!ollll!ng EAL: * * *

. EAL FG1: Loss of ANY two ba.uiers ANC lo:;;~ or potential : loss. :ofthird *" ~ ) . ; -

barrier.

Ths: EOF will parform offsite m::itificatlcms to lot.al, Slate and Fedl';lrnl a1;1encies for lhe I GENERAL EMERGENCY claMlflcallon. which will iriclude specific Prolctlve Action Recommendallons (PARs) for the general public within the 10-niil~; Enie*rgency Planning :Zone (EPZ} as follows: * * .

  • I PARN0.1
  • Evacuate 2-mUe radius and 2*5 mil es downwind *

.c':*

remaifl i11doo~: .

I 1i:OO

  • Remainder of the EPZ pqpulation to The Dose Assessment T~am {DAT) in the EOF and the RP Otmite Monitoring Teams dispatched from the EOF will continua tQ monitor.th~ radiological reylaaSl:I and track the monitor I C.3... l, t

projectecf patnway of the rar.Oological pl1,1me and will and r~port offsiti:t radiation lewels back to the Offsite Te~m CoqrdinatOr (OTC) in the. EOF. _The RadiologiGal Ass~sr:oont Coordinator (RAC) in the EQF\vill maEritairi an update ofoffstte radiolcgical

  • c0ndttions and continus to communicats this fnfo'rin.ation to thi;i Emsryem:y Director and I 8 I

I 48 I

Unclassified ,

Radiological Emergency Preparedness Program (REP)

I After Action Report/Improvement Plan Arkansas Nuclear One I

2016 Emergency Preparedness Exercise (REX-16) I

,.~, lne Ark.ansa-\> Departrr'lent of Health staff personnel who w111 be collocated \l\'ith ANO in t_J u,e EOF. : . -

1:2:30-13: 15 Atter'. the, Sp~ay ~.!Jmp Is reslatted or the cont al nOJenl pen..etretlon Is repaire<J, I

temiinationfminimizalion._.iill occur. Dose Assessment arY.f Offsite Monitoring T£tams will report' that a reduction In dose readings offs.ite is oc:curr1 ng, the Lead Dr1ll Contra lier will tei rminate the :e:-:ercioo (- 13 30 ). I I

I l.'

I I

.'~

~~ .

I I

I I

I

~ '

I 4 I I

49 I

I

~

/"'.  !~ >

._, j

\ . ;./ g.

2016 NRC Exercise°"': Scenario Timeline =

.g0 a

.§'

EJc::JEJ ~ [:] ~~00 ~ ~ C!l 0715 1* I a<

I ~

8 I l l l  ! i l "

g.

'"Cl Si" CR Tomlldo Alert 'D' R.Cfl ERO SAE fillled lllel

a: =

Crew W<1rnin9 Dci;lared Shaft F";!dlities DEdared

  • OCX:Ur.il Chara Ina Takes IS8ued Sh~i- Site due t:o Staffed ~ 6;'

Watch RX Ewcu11tion delayed Trips i:loesn't petformed read:Dr ""'

o*

0 tl"fp. trip (IQ Fi'

'A'Qrw;: Tr.imado SAE e:.

PUmpT,lp k- D11mCJ9f!'til c11terla '. i tT1 3

E<:P Suctlcn ml!lt i "

(' ail Valve f " 0 i =

01 Alert Criwizi Met C'l

=

'"Cl -

~

0 [* .g ~.

i* ~  ;>

l

""' =-

=

~

'"Cl a

[][] ~ [;_[] c::J I .~

<"130()

0 (I I ,, ... § 3

l l l

J 3

.... 200011pm LfXA1 'B' *

  • Tei-n'jnate .. ..

Con);j!inm!l!nt Offsit!:; B.clca:m .,,.Dflll

.,.3oa, C!Yding Fallura 1s rectuald br " '*

'A' Ctintalnmtinl Spr:rv S'Jlrnv Pumo .-8'0rlrig .a Pt.Imp Falls to start fi!li '.

§! amtai nment Damage in electrical 5Dl'av 1;n1ml! or conlillnment peneti"iiliDJl m l!lls:il.!r&i:I lli!pairof U NEPR d~ ti;i f<iult OFFSrrE ~m~J;ralion GE alterla met P'AR

1Unclassified Radiological* Emergency Preparedness Program (REP)

I After Action Report/Improvement Plan Arkansas Nuclear One I

I

() PEIAILED DESCRIPTION OE EvENIS Ttiis section ~-Qritaips. ;:i 'chronological listing rirmajar scenario events and anti~ipated I

responses and IS Intended for the effective placement of controller!i, evaluators, and observers. The anticipated resp.onse5 liste:d in this section do not necessarily include all of the ao:epta bl e a.ctioi;is by players and .stioLJld nol:. l;Je used as a basis fct petfotma nee I

evaluatlons. Evciluatiori5 of player doosioris,~ould be.based on appropriate of implementaticiri

~ .

the Emergency Plan and. procedu~s.

I Inttlal Conditions I

  • 1oo0to: power, no apparent problems
  • llnitl*

. ' I.,

I

  • T.he pJant *has been operating for the past 160 days at 1000/o po*~r: and ts at t'ne rnlddle of core life~

-;~; .

  • I

() *

  • The 2P--36B ctlarging Pl.I r11 p Is 01,Jt of service for an ol I baffle repack. Work

, l:legar\ at 06:00 this morning,

_., drali1~ oil.

The estimate'd completion of the PM is lD:JO

.~* today,:: The oil h;;f~ been drained and the crew i? exiting the pl;;int ..:.ith the I

I

.. ~; ,_

I

~~;

. f, I

I I

I I

.51 I

I

0 DETAILED SCENARIO Note: All sc&nario times am annroxirt'lat<l'.

.. , _ _ _ _....,:!.~~~~~~~!!!:!:=.::::.:.:i::c:.;=:=~~-------~-------

  • TIME I MESSAGE# 1 I Comments

~

4 Simulator 1 Tumovar i

1

  • From Booth Operator
l. Evel'lt i l'he crei.v receives a shift turnover ft'()m the Simulator' staff Onitial
Canditions). -
  • 0045- 0715. 2 :~_ - .................. O ; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . p 0 ** *i .................... -*- ~- - --*--- ............ ------ .. ,......... - -*-**--H-~ *--- ****~ * --
  • 0 * * <<** * ** .. ~~ '..
  • O' - - - * * ...... - - O * * * - - - 0 << .... ..: _ _ _ _ _ .. ..
  • l 3

- .: Control Room i.' E:xpected *.i The crew wm assume the watcll at ~0715.

J

To l Staff j R1r.tpans&  ;
~ Simulator
  • i NOAA Weath~r Radio broadcasts message for S~vere
  • 4 : From
  • Booth
  • E:v*m l Thunderstorm Warnltl!J fur Pops County. *
. . Opsrator 1 , ..

0725  !--- --;-- **- *--l * -.. -.. ** *1 **-- *----- ** ---T ~~t~~i-R~~-;~.:;~~~~~; ,_-h~~ci:;~;;~*;; *w;;~i~~*b;~pi~~1* P;;~~~;1--**

i Tc l Control Room ! E:l!:p9Cted !and Trai11ing Centeir m1Br the PA system. COPD-24, "Risk * ,:*:
  • Slaff i R1r1;,ian~o : Assessment Guidelines" and 1203.02$~ "Natural *c.mergericies" will be

' '. l f rn11iewi3cf for actjcms associ~ted wilh a'Severe Ttiunderstc;i,rm Wa~ing.

:  ; Simula.lo( *  : NOAA Wt!alher Radio bro~dca.sts massage for Tornado W~rningJar
  • 5  ! From Btioth l Evef'll ~ Pope County. " -* --

. Ope raror .  ; "* ~ ., ~: ~ ~;-i (l733 I ' ' * * ' ' . , ' . ~

-:*** **-:! ** ** .. ** ** rec;~i~i"R~~-1 ~;:*~~*--:~ c;;,:;;1i.ii~i;~*~~ii~~~ "i.i\w*ap~*1203.025.-:N~i~~iem ~;g-~~~i~~:;~:-::-* ---*

'I'D j Staff i RHponse !' - -_ ~' * ' *-- "

Simulator i Security report f~at a tornado is south of the firing range with tlying From Booth Event  !:debris arid that access to Flatwood drive is blooked.' :No damage to.

i the Protected Area _**  : *

  • _*_ ..  :*

0738 6 .......... ---- -- ~--- -

' Control F!oom Operator

................................ . ...,,, * * .e .. " .............

Exrieeted Ol:O ' * . . . . . . . . . . . . . . . . . . . . . ., . . * - .. -. - - - - - - - - - - - - - - - - _ _ _ ,, -

!A~lmowtedge message

- ....... ;.. . . . . - - --4 --.. ___ :_ ... ------ ______.__ ~ *---~ .......... -* ...... .

TO R~3ponse Staff  !

1

-J

+>

CJ  ;

  • ~

) ()

g.

s

- .g 0 TIME

  • 1 MESSAGE# Comments ~

.. I "Cl

§'

A Circ Wate~ Pump wilt trtp due to watar ingrnss inta the motor a<

1eITTi1na1 6ri~: -* .* :* * * "3 0740 er~ ~iii~~t";;~~-~r c~~rj~-~:~~;*v;~~~-~-AE~p-*:*****. ,......... ,-~----~---,. ":;?. .

"tl

-; )*".  ::s

  • $Tmuia1or ' -Secu rify raporf'of damage ta th.~ ECP ~uct;i6n _val11~ aric! inslrument-
  • Bvoth l Event p_a r:iei 9rid thafthetoi~ada *il] g~re:a n~J.~ 9*~c:irn,\ is_ c1l~ip~fin9 , . . ..  ::0.

~

Operator * {Alert CrlterJa mat) * ** ** * *

  • Il 0741 7 , , o' 10 **-----------*******"'***-****** ........ *****------- 0
.* Contro I Room ~.* Expected OQ

! Crew ~ould assess EAL call criteria~ . c;*

i To e:..

Starr ~ RllSpD nsD j*.

tI1

! 3 NLO.irwestlgatkin of 2*PJA; Circ Puf"flp, ~reaker o<l"

From NLO Controller

.J~~~~~~ _'. _, _ _ .* -*

  • _ _ :~*----'-~ . . . . . . *. :..'.: . ;. . . . .*.'. * ***- - -*- :. *. ~L .. -...:*______ -- *- __.,.

I g

() =

~

J '< . ..,

-0741 fl NLO rssponds to breaker deck. and delivers the following information .., "'

"tl -

i NLO

ElCp&ekld 1Re1!ipio11s11 t.o the CR. . . .

"A" CirG Pump br~ ki:ir ls trlppE!d.J*:he MotOr.differenlial,rel~y has drnpped ror A" Clrc. Pump.~ * *

  • 1 *. ., ..

Il l

"Cl"

~ ~

~

~*

"'"c:i.

s

!Jl

"O i From Even1 NLO fElectrician 2P*3A, Circ Purnp lnvestlgallo11 NLO re$ponds 16 breaker deck and deli*Jers the follo!J!ling information

!l ~

8-3.

~*

Tc to the CR

There are black flash ma~s on the motor tennination connections box on the side of the motor: ..

l~

~

1 r

I

~

I "'

s

~

II ()

if 0

s

()

TIME I MESSAGE#

I I Comments NLO i NLO performs Standard Attachment 47

-0745 11 From Controller l* cv<int

- * " ' " ' .... ._ . . . . . . . . . . . . . . . .

  • t . . . '"~*Ml ............ ----- L.. -- *- ** * * ** ** * * ***~ --* * * * * * * * * * **
  • To NLO j Exp!!etecl  ! Perform SA-4 7 and report results to the control room_

~ ~e:!lplll'lS!!-

1 '.From j Ale rt Oe ~Iara.lion.

.... .. .. .. .. .. -- -- ---1-- -- ----*- ---- --:-The.*S hift M~~-~~~~ *~li-~ie~l~-r~ -~~ Al;rt~;d*~-~- ih~-f~ii~ ~g-- -*-* ..........

!r Emergency. Action Level {EAL):.

~ EAL 1-!A.S- Nat\Jral or. destructive- phenomuna- afrectl ng VlTAL AREAS:  :

. 2. Tcfna.dO.sttiklttg orw[ndz > 67 m J)h (2. minute avorageJ rili:.ultlng In
. . VISIBLE DAMAGE to thci Ull IP~;ite Heat
Sinic {Emer1}ency Coolo!{t Pond~.

07-50 ..

! Bcpecti!d

Reaponaa 1The Shirt Man.agerwill direct1he Conlrol Room Communic.atorto notif>;.

i UJe ERO and Plant Management of the Alert classification. event.

~ Thfl ~hift Mar;agerwill direcl lhe Control Room Communicatorto notify

offsita autliorilies oftM*Alert declaration .

. *~

State and local authmitiss Will be advised ~hat there are no protective
actions re¢ommandedfor th~ geneiai PIJ~lic at this tl~1e.' '* *1 ...

~ * ' . * * * * . '. *~ ' * . . \ * ; - t * . : ..... * * ".. - * ~ ~ * * * * * ** '

  • ; ....... **..... i Contingency Mess<tgtf-Variable

TIME MESSAGE# Comments l From J&C Contrullar 1Event l&C Investigation ofECP damage


-- - --~ --- " -. - -. -. - -

' ' ** - * - -* - * - - - - - * -* - - - - - - - - ..... - - - * - - - - - - - - -- - - - - - * - - - - - - - * - - ........... - * ....... "" ** > ......... " ** ~" ~. *~ "'" ............... --------~ ............ ..

..'.()750 12 ; i E..;~ctad

~Ill l&C Tsch i Re!ipon!ll!! ~:. 'i t -

'  :~.:
  • - ~ ** <. ' ' * *'
  • r* NLO NLO investigation of ECP sucUon val\le area i F'rom Contro lier

! E'a'unt . :~.

14 *;c* "" -* ,.,. __ ,., .... ,...........~~~'+'-=-'--"'-'"--'-~~~~-*-r-,.;:;;__. ___ ,.:, *** ~-~** ***. "., ......... ~-*---*--~_,.,.,."=*--=-..~-~---~-~-,!!-

E>cpom1cl Ra port tioo in gs
fo NLO i Respome

.iFrom Dose Dose Assessment T earn obtains cu rret1t weather forecast.

. Assassmant Controller Event

..'I' . . .. . .

Variable ~-. - - *---**-*- _ _ _ ._ ------- _ _ ,.. _ _ _ _ _ _ _ _ _ _ _ _ , .................4 ~ . . . . . . -~*.;.., . . . . _~_ . . . . . . ~ .........

          • ~ ............. *"-' ..................... - ......... ----*~---

di Oi After ERO activation 13 ;

. DMe Controll ar provides the drill weather forecast to the Dose Assessment Team when' a Ii actual forecast has been'oblained using Procedure l fo Asse-Mmenl 1 Q04.002;**0ffsita Dose Projeclions".

  • Team Vibration alann reoolv6d on D Rasctor Caolc!nt Pump. Vibrations increase rapidfy and result in oi 2P*32D shaft shear (coupling fatlure)

Tha automatic trip of rhe reactor daes nol actuate. Ttie RPS manual

.j From Event trip of the reactor does notfuncnon. DSS does not function and the reactor trip will have to be pertormed in the Control Room by de-energizing 48011 buses*2s;.7 and 2B-8. (SAE criteria rnet) 0845 15 ;. .................. -------*** *** ******-********** ....... ,. .**.._.. ** **"' *** ""' ** **** ..., ... -------**-*c---....... --*-*-** ****-- * ***:-****-------*

  • i i Crew wlll open the feMerbreak-ersfor2B-7 arld 28-B to mp Iha reactor.

()

TIME MESSAGE#  ! comments

. EOFITSCl ~-

From : Communicator ; Ever'lt l SAE Declaration.

  • Controller ~ '

.,~r~r*~* .. ~r~------ .... 5 ............... ,., * * *f.~..,~~**"'""'**'"*".,..,~ .. --------.. *--* ........... *-~----- *-*-** ** *-*- ....... , *. * ** * ***-*-------*-***-*---------------....... ..

~ ) The Shift Manager wilt! declare an SAE based on the following

!  ! Emergency Action Level (EAL):

j EAL..§,S: 1.<1 -An E1Utomat!t: ttlp fallcxl to shutdown the reHC.kir !t!!! U1 -.

. Ma1Jual 3citons takon al parHll Cll~ (Unlt 1l iir panelis 2CQ3l.
IC14
tUnit.2)do ngtzl'IL.lldown tl'lere-actor aa imll~atad by reactor J)QW6t > 53, .

ED '

ogoo . E The Shift Managerwill direcl1h~ Gqntrol Room Communicator to

EOF Offsite :E ti ~notify the ERO and Plant f\itanagement oftt1e SAE classificatkin 1'1enL T[l  : Communicator : xpoctQ
. 1Rc:tpon:se

~ Tt1e Shift Managerwill direct the Con1ro1 Room Com.municatorto 01  : EPM  : ~ notify otfsite !Uthoritles of lhe SAE *declaration.* * '* *

  • m 1Stat0 and local authorities wil I be ad vised that them a re no proteolive

.[actions rarommended for the generar public at this time .

... Continmmcy Mes sage Lead Dril I i ... .

From

  • Contmller ** --~ E'l'c_rt~. If.tr~ Shilt Manager has nol yel declared.the SAE within .t5 minutes.of

.*, the EAL criteria being rnet, Issue th is me s.sagi;:i.

0000 2c; -* *- **-* -j ________:___:_:*.":: .....;~.- .......:......... [:)~1~;*~-~-sAE:-~~;~;g~~~;;-~i~-~~ifi~~ii~~~.. -* .. -..

  • . .. * ..  : £)(1X!Ctllrl*
  • To Shift Manager ~ Relilpol'L9e

( ......\

.....__,./

TIME I MESSAGE#

I r i lnilial Acoountabilify Comrnants

. . TSC Laad Controller I

  • Fmm S ec:u ri ty

, Evarrt 0900 "113  : Controller  : * .

> - * * ** * - ~ * * * - - - * - - - - - - - * * - - * - * * ( '

  • _ _ ...... 4 * *.O . . . . . . . . : M........ ""' ~* J* 9* ..... ;..,.,. . . . . . . . . . . . .- * - * * - * " - * * * * * * * - - * --~-* * ~ k * * * "* * "* *-*-* *M---*****--*-* __ .. _____ ............. *
: EPM f  :  ; Ensure EPM has mocked up forms. When initial accountability report

. l Tc  : Security  !::::e i is obtained, conlroller will removs those names that are exempt

~-:--

-- .;**4** ....L. -** Offlcar ... ; ...,. ** .............. ***.. ....... - . * ... ** ... *-- ***** _.............,,....... ,,

. i '  ; *Em~rgeney R~lilpcmse *Faeintles sratted

: The TSC;o,.osc. ~nd.EOF shq.uld ~e sraffed ~nd operatk?n.a.I with the
F~om l j J:OF ED assuming Eb&c from the U2 ShiffManager. The EOF, TSC i and ..OSC are ~quii:etl to ba staffed 1operational within 00-90 minutes i Evellt

..,;,.09_00

1  :  : of !h~ declarafeon of the ALERT em~rooncy class..The .JIC must .be l  !

!-****** "** .i,. ** ..... .-*. -

.. C** ****~** ** ...... _

l staffed i oF)erauonal within 120 minutes of the Alert emergenay class.

..... ; .......... * . . . . . . . . . . . . . . . . . . . . -- ..... - --**********-- **** ** **<-******o** ""'"" * ***** * * *--****

  • -  ; .  : .E;tp6ctii!d  :  :. .* . ...

{ro i  : R.9E~MO *. . -*- . - .. .. .. "

' The Failed Fual Iodine Radi;;ition Monitor 2RITS-4806B in the. U-2 Control Room will indicoite 1.3E5 counts per minute (cpmJ. Thi:s value t

c ..

I Will ltldicate thatfueh::lad degradatlan is greater than Technical I' .* :Specification allowable limits. Ir ribt already reque-st!iKi, the U-2 * *

~From ' Event Control- Room will. n~quest 1hat Chemistry PerfQrm RCS -~ mpling to 0915 .

determine RCS aciivity levels. ** *

.. -........ ----!M

' .. " *W* WM W-- <M" ~< '. ..- ---* -- ". --- ---- ------ ---- - -------- ............................. "'" ...................... "' .....,. ...............;,,------** ............................. ,. ............ ~

Expected 110
: R-espons&

"  : Frnm " Evacuation  : i=vM1t Release or evacuees bad\ to normal work dutie5 viioable

' 1e

  • -***----~;-*---*--*
Controller ... :--..---*--------*
  • -----------~~-----*---*-****-****** ................................. ~------*----*-*--*******----*

Site peirson.ool v.111 evai:::uatg to the west parking l{)t outside of the.* *** *

.': T1;1  ! Drill  !~:Pe:~:~ MAC8. After acc:ountaoilily is*oomplatad, they can be released back Evsooeas Into the plant

Tl.ME. I M~SSAGE#

I I Commeqts lnltl al N;oo 11nfa.bility complete

[

TSC Lead . I

-09:30 17 From Controller .

J Eva11t  ! .

I

-- -- -- -- --~----- .. _____ -- -- -- ----- -!- - ... - - .. * ' - - ~. -- - - ... -- -- ~- _., -- -- - - -- -- - - - - 't"' - - - - -- - - ---:- - - - - - * ................. .. 4 ............ . . . . . . . . . . . . . ~ . . . . . . . . . . . . . . . . . . . - * * - .. ..

I t:vacuatia n j Expected . lnforrn the Evacuation CQ ntroiler when aaoountablllty Ls oomplete and l'o

Contra lier ~ Re
sp1;1 n:!;le  ! 111al e.-.iacuated per.sor:mel can return to thei~ nmmal duiies.

I '~ * *. . . * '

  • ** r t From  : f E.,.ultt l 2P*36A chargirig pump trips*due to a failed under*voltage relay. .

093{) i

...... *'P .. ._ .... - .. --*-* *-**-*** **-* -* **** ~ *- *- ** -* *** ** ** * ..

~ exp~wo i
  • * * *-* , , * "" "' * *" ""' ****""'""A_..,._ f* ..... *-***.*I-:*-**'***---+**-~---*------* ............... ~ ......... If~***!"*'"'"'

10  : ~ .i::te:spo n~e . -~* ** ,..*-- * ',

  • . I .>' '~-* ;_. *-

01

From NLO ~ EvfirYI . . i *A' CHARGING PUMP breaker invastigatron OJ
: Cont~lle-r t  : .

r** ------ --r-* -----* *- ...........1~ ............ "' [' ir :c~~t~l:R~;;~~~~;~*~~-~ri* ~La*t~ '.r~:.;;ti~~t~'A: C1~1*~i~o-;;~;,:;p**--;-- --

Variable :2.0  : *  ! breakerreportthe.following: *- :: . . . . . * .... ** . ,_ -..

~0930 "*.  : NLO i Expected ~ . -* . . ...

To  ; i Respanse f 'The breaker is ~l~sed and ha~ ioc:al ligl:il indication._ I see ~otlliO,g
[wro.ngwlt~ijlebr!laker;':,*: . :_;:.*: * * * * * *

'i' -j Pump is capable of remote start* .. '

    • .c . .~.

P}

~-

---~-----,-------*-

TIME l MESSAGE#

! I Comments f'ram  ; l&C Controller; Event  : l&C lnvestig;:ilion of A CHARGING PUMP

    • .,., ... ,. ". ,. t* .o'" * * ~ ~ ~_.. .,.,. ** *~* ,..., ** ** ,.; ,.,. .,..*_. .-.:. **-..... ~- .... ; * ,._. ... **'"*a *:s" *'" * * ** * * "* * ., "'" * ~ * ..--.-*,. ......... * *----* - *-*-* * * * .... -* * ... -* * * - ** -* * ~ * *
  • Variable  :.!!:~

~

o l&C Teer I l: Expeci.acl

~~GpOOS{I i Implement oorrecti1.'e actions Electrical El~ctr.lcal-R-epairtearn at 'A' Char9ing Pump Breaker r-rom

  • Controller Vari<1ble 21 . Relay
Expeeletl An asse~ sme nl of the pump bre.a l<er 1.11.ril I indicate that the relay must To be replac~d to restore. the re.mote ~rt cap~bility qJ ttie pump. f1~mP

'" ' - . /Electrician

~ R<lsi:ionse Is capable of remote st~rt at tha, breaker * .. ., .

f'(Ot"rl Event :worJ'gprn LOCA on D RCS Cold LBg

                  • *****"** ......... - - *** - - - - - - - - - - - - , - - - _ _ _ ... - - . . . . . . . . . . . . . . . . . . . . . . . . . . . . . " ' - " " ~. ~- .......... ""'~""' ....................... ~" .... - - : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . & ............. ,,_~ .... ,, ................... - - -

1015* -*  ; -** Exp~lM i Car.tainmentHi Range Rarff'\lkinitorswill trend 1,1p and Fuel Clad

-~ .,

To Retipun:~Ht  : Failure will rise to 3%

bi

  • Chemistry l i 2TCD-19 rises to 1700 mRJhr c.o 2J From ~ RP Co ntr-oOer Evant

.... ~* . . . . . . . : ................... + .. - - - - - - - - - .. -- ----- - -- *- --!- ~- -- -- - - -- -. ~ -. -- --- ' - ..

5C To Chemist I HP Expected  ! Rsport this reading lo the CR and ED RGu:rionsa .i From

~olaintenance Ev!!rat

! 'A' Containment Spray Pump will fail to start on t~e SIAS actuation Controner

~ .._ ..... ___ ,, ... ____ ... --

~101B 26 TQ Repair team

TIME MESSAGE# Comments I I

During SIAS ac!Uatlon, 2CV->3850-2 receives a clo:sad ~(gnal and lhe
cabling for 2CV-3850-2 faults ln the CNThH pi:Jnetration (2WR-4-0-2).
The .WOV MCC braakern (28-63~1 ~nd 2B*63F2.) do not open as
designed. The 2B-63 bus will lock out as a result of the breakers not
opening. The CNTMT penetration is damaged and is now raleasfng From [ fvetlt i radiation in the Upper North Elecirir:al Pflnetm!ian Room. As a r~sult
of 26-63 loclling out, Ifie service waler valves For the green train

-1018 '

! containment coolers and the CNTMT coolers 2vsi;.1 CID will lose

.  ; power

-- ~A --

      • ~ ** * * ,. . . . . _ .. ,. " " ..... _ .

~~. * ...... ~ * ~ .. 0 " " ......... -~ .. -- *--- * * ------ ------- **-* -- * ,._' - * * * . , . _ .* * --~n,_ ** *** ***

0) ~  :  : Corrective actions developsd/prioriti:zed 0  : Expemed To  ?*Res;pcnse Aft;sr SEAS sctuation, the *s* Spray pump will run for 5 mlnutes end then fail.* An electrical {and pQssibly mechanical) malritenance team ftram Event

\l\~ll be dispatched* by.the osc to investigate the pmblem arid will determine 1hat the motor needs "to be, replaGed due ~o shortad nptor windings. * ** * ' ** * ,--' ,,' "

CorractiVtl aclions developedlimplememed-.

..1020 To-'*

0

! Time Message# j Comments I

- t II ..

, . ,_, '!: .. ~ '"'* ~ *-"- ""'*1*

l EAi..f~t ~* t.:~S' of *ANV *Two Barriers AND Loss or Potential* Loss

-~

l. .*:..<<" .' p( Third Barrl~r

-1030-1040 : 24 f

.~To Emergency j !i~~O(f i .t{Bs'p~nMI li autt:iortti9s..

Tile. EDF ED wiil direci-Ule EOF Co mmu n'icator to* notify 'offsite . ,.;,

...-. _ ;:* ... . -. _ _.: _;: ::;;\.',

birecb:ir *

./ ~ :* '*: **~ -*- I State: and local' a(Jli[ofitie~ are' &d~ised b(the fult{l~1ing j Protedive A.ciitln Recomm0hdation (PAF{):

.t ~ :*-*

~

~ Evacuate.2*mll~ raidius and 2*5 rnlle~ down\11/ind- ... _..

.~

i* '

~ ,*-':

J :

.

  • Remainder of lhe-EPZ population to remain- indoors l:-*--*

From

-~ ~- -~ -~

CO ntrollsr

...-*- *- -.. ~-...... .

l E!viaot l 28-t33~in\1stlgatk>n-

... < K"" ...... : ~

-~ ~ r* ** ""' "'" _____ ..........

variable

4 0 0 .. ,. * - - ... . . . . * - - - . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _ _ _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -" . . . . . . . . . . . . . . . .._ . . . . . . ............ .... ,& . . . . .
15 : ~ NLO!Repair 1 Expected  : Investigate and report findings to CR. **** * *

! i To

  • Team '

j Re.iponse l

f Investigation or- LJNEPR - - -*

L~~---:.----~~!~?-'~~-~-- .. :. _~~~t. .. .:*. - ----- -*- ------------ ----~-- .,: _____ . ---- .... -_ . ___ :_,. __ ............................ ....... ............................ - ......... .

._.: ,, ~ ..,

Variable  :, 26 *** NLQI_ Repair l f:;11pP:(:ted  ; Report findings

  • i f To T ~am i Resp1;m~ r Variable NLO  : up 1NLO'racking 4160vbreaker In breaker lab after repair{lfcam roller

~ from. *1

~-" .,_ ** "'~

Corifroller - !- E!vont. -hcl'simulate 'r'epair af Spray pump breaker arv:Hts ra1um to

._... ~*"'" *** '"'" ** """"""" ""' ,..,,.,. ... *'****** ** ...... ..,,.,.,..,A_ ... _ ...... * .................................................. ~* ..... ,.. ..... -~ ......... ., .... *,.* * & ' ............._ -* *

&erv~

-. ': i E!xpcc;tcd ; * * '
To * . NLO *:

I RC<iSpons<t !

- _J y

(j TIME MESSAGE# Comments 1

' , Contingency Megsaae

  • : EOFteed *: - -

-1045-1055 j Fl'Om Controller i E1lurit lftt).e EOF ED has nat yet deolared lne GE classification wirhin 15

~!. .

minutes of rnssting thEl EAL criteria, issue this tnes~ge.

--- ..... __ ... _... ~- ...... ~ .............. '., .... -~ .....:,.., ......... ---------- .. ------ -~-~--: ........ -. -- -*- -. -

0

...... -. -*. --. -** -- -~ ---- -- -- __ ..__ ____ ---- .............................. ""' **~- .... . .

  • j To . ED i* EzJH1cted Declare a GENE~AL EMERGENCY olassificalion.

, ' i Roopon69

From  ! NLO  ; Evi.rnt lnvesllgatloo of 'B' Containment Spray Pump
; Controllers  :

Vartable 30 :-**-*'"'"i"'"'"' .. "' *"'°°°~'° "°"""********* ************** ******* ***** "" " ' " . * * *** * ** * * *** * ** """""" * * * * - * * ** **** * * - * * * * * * * * ** ****** *****

ia ' NLOs
Eio:pec.tecl Tasting of motor with required equipment.
: ~ Response Elecrn*cal  : 2B-63 rep-air From f l:Y!Qrlt en I\.) Vartable 31

' Controller 1---+-----*****f*n~-----------*--*-*-*-******

t lo

' Electrical  : E:io:pecte<l i Develop and imp!Grnenl ;;:orrecti'IJe acllons.

F'..epair Team - Resporise  !  :

fr-om Flffid T earn 1Evant  : Fiatd T eiam Contfo lie rs wUI prm1ide o!Tuite radiol09ii::a I data ta the Corrtrotle~  ! Offsite Moniloring Te.ams p-eC' Scer1aiio Book, Appendix. E data. *-----*# ** ** ** ** -* ** ** **--' *

-- ------ -* -* - ... << * * * * * ..... ~

  • _.,.. ~,.' ,.,,. * ~""""'~" *,. r.- ..... -. ------ ___ ,.. ...... ~-*"'* * * * ...... .,., * *- .... ~ *' "" "'" "¥ *' -* .. ,. ,..,. **-**- ~- -**~~ ~'

-- -- ---- ~  : Offsite Monitorinq Te.ams will begin to detect radiological .

1000-1400 29- ,Qffsile '  ; measi.ire[l1ents. offsit!3 and will pm\'ide r'ediolcigica( information la the TQ Moriiloring ~ Eio:p11ciecl  ; offsite Team Coordlnatbr°{OTC)'located in the EOF, Tut:l CTC iMll Team '. ResJ)Dns~  : communicate field i~m radiological data to the Dose AssesE1ment Personnel

  • i TeaJIJ in the .EOF. * * * * ... _ ...
. ~I .*

ME~-S-A_G_E_#~~--..1~~~-..---,-

~----~--*-

TIME Comments Lead Drill  : Crew attempting to perform a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> shutdown

, From _,  : E\lcnt  ;

Variable ' 4C !------_____;___.:-_~~~-'!~: . *.;..... *----***---~---------*--*--*--*----** --* -* * -** *------* ------ - ----------------* ****** .............. ***

!  : Conlrol Room i Ex.~utect i Dire ct thB crBw to perfom1 a 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> shutdown i Tll

~

~

Staff

.; Res>>0aw  ;

,' Frcm Drill Lead Evant j *The drlll ls tenninated".
Controller
32. ~----*------~------- .. *- ---- - .. - - . - *-*- -- ___ !' ________ ------- ___ ... __ ........... ~ .. ~ ....... ,.,. .. ,, ........... ., .,. .................. - - ---- -- -- *-* -- -- -- -- ... ' -- - . -- . '.

1300*1315 1To  ! All Facilities E;i:pi;icted RB5ponJSE1 j Aftar a short break, facil]ly critiques will begin in each of the l Emergeni;:y R:espons.e Faclli!Jes (ERFs)-

Ir

~

l If.

I r

f

I Unclassified Radiological 'Emergenc)I Preparedness Progran'r (REP)

After Action Report/Improvement Plan Arkansas Nuclear One I

This page is intentionally blank.

I I

I I

I I

I I .!'

I I

I .'~*

I I

I I

I 64 I