ENS 54449
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
00:29 Dec 18, 2019 | |
Title | Technical Specification Required Shutdown |
Event Description | At 1929 EST, on 12/17/19, Millstone Unit 3 began preparations for shutting down the reactor as the 'A' Emergency Diesel Generator (EDG) could not be restored to operable status within the 14-day outage time, requiring a Technical Specification (Tech Spec) shutdown.
Per Tech Spec 3.8.1.1., the reactor must be in Hot Standby in six (6) hours, and Cold Shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Hot Standby is estimated by midnight, and Cold Shutdown by 1800 EST on 12/18/19. All other safety and shutdown systems are operable. Decay heat removal will be through the Shut Down Cooling and Residual Heat Removal systems. There was no impact to Unit 2. There was no impact to the health and safety of the public or plant personnel. The licensee notified the state of Connecticut, Waterford County, and the NRC Resident Inspector. |
Where | |
---|---|
Millstone Connecticut (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown | |
Time - Person (Reporting Time:+-3.32 h-0.138 days <br />-0.0198 weeks <br />-0.00455 months <br />) | |
Opened: | Donald Haynes 21:10 Dec 17, 2019 |
NRC Officer: | Bethany Cecere |
Last Updated: | Dec 17, 2019 |
54449 - NRC Website | |
Unit 3 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (25 %) |
WEEKMONTHYEARENS 544492019-12-18T00:29:00018 December 2019 00:29:00
[Table view]10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown ENS 503132014-07-26T18:11:00026 July 2014 18:11:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Turbine Driven Afw Pump Failure ENS 498602014-02-27T13:09:00027 February 2014 13:09:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Plant Shutdown Required by Technical Specification ENS 497792014-01-31T08:30:00031 January 2014 08:30:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Degradation of the Pressurizer Proportional Heaters Group 1 ENS 520002013-06-13T00:13:00013 June 2013 00:13:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown and Reactor Trip ENS 481812012-08-12T04:44:00012 August 2012 04:44:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Ultimate Heat Sink Exceeding Temperature Limit ENS 472392011-09-03T19:30:0003 September 2011 19:30:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to "a" Train Service Water Leak ENS 424632006-04-01T03:20:0001 April 2006 03:20:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Inoperable Afw Turbine 2019-12-18T00:29:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_54449&oldid=2281153"