ENS 54449

From kanterella
Jump to navigation Jump to search
ENS 54449 +/-
Where
Millstone Dominion icon.png
Connecticut (NRC Region 1)
Reporting
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown
Time - Person (Reporting Time:+-3.32 h-0.138 days <br />-0.0198 weeks <br />-0.00455 months <br />)
Opened: Donald Haynes
21:10 Dec 17, 2019
NRC Officer: Bethany Cecere
Last Updated: Dec 17, 2019
54449 - NRC Website