ENS 44618
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
16:52 Oct 31, 2008 | |
Title | Manual Reactor Trip Due to Rod Control Malfunction |
Event Description | Initial conditions: Low Power Physics Testing after outage. Performing Dynamic Rod Worth measurements. Single dropped rod (K-2) on Control Bank B occurred after movement disagreement between rod groups. Entered AP-14, 'Rod Control Malfunction'. Performed a manual reactor trip and manual start of Auxiliary Feedwater as directed by Normal Operating Procedures for unit shutdown. Feedwater isolation occurred due to Low T-Ave concurrent with reactor trip.
All control rods were fully inserted. Licensee has notified NRC Resident Inspector. |
Where | |
---|---|
Mcguire North Carolina (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+-3.12 h-0.13 days <br />-0.0186 weeks <br />-0.00427 months <br />) | |
Opened: | Michael Richardson 13:45 Oct 31, 2008 |
NRC Officer: | John Knoke |
Last Updated: | Oct 31, 2008 |
44618 - NRC Website | |
Unit 1 | |
---|---|
Reactor critical | Not Critical |
Scram | Yes, Manual Scram |
Before | Hot Standby (0 %) |
After | Hot Standby (0 %) |
WEEKMONTHYEARENS 568022023-10-18T15:16:00018 October 2023 15:16:00
[Table view]10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Actuation of Auxiliary Feedwater System ENS 564512023-04-02T07:52:0002 April 2023 07:52:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Actuation of Auxiliary Feedwater Motor Driven Pumps ENS 557482022-02-18T09:59:00018 February 2022 09:59:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip and System Actuation ENS 554582021-09-13T04:11:00013 September 2021 04:11:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Specified System Actuation ENS 540472019-05-03T19:54:0003 May 2019 19:54:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip on Over Temperature Delta Temperature ENS 532172018-02-16T15:14:00016 February 2018 15:14:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip During Solid State Protection System Testing ENS 514742015-10-07T10:55:0007 October 2015 10:55:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unplanned Afw Actuation During Refueling Outage Testing ENS 495382013-11-14T18:13:00014 November 2013 18:13:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Indication of Dropped Control Rods ENS 487752013-02-21T14:57:00021 February 2013 14:57:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Turbine Trip on Loss of Both Main Feed Pumps ENS 485492012-12-02T04:17:0002 December 2012 04:17:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Amsac Actuated at Lower than Expected Turbine Inlet Pressure ENS 467092011-03-30T04:10:00030 March 2011 04:10:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Control Rod Malfunction During Rod Testing Results in Operators Manually Opening Trip Breakers ENS 465592011-01-20T20:18:00020 January 2011 20:18:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Loss of Both Main Feed Pumps During Shutdown ENS 460032010-06-12T10:44:00012 June 2010 10:44:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to a Control Rod Drop Indication ENS 448692009-02-23T09:06:00023 February 2009 09:06:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Inadvertent Actuation of the Turbine Driven Auxiliary Feedwater Pump ENS 446242008-11-03T07:07:0003 November 2008 07:07:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manually Opened Reactor Trip Circuit Breakers to Insert Control Bank "B ENS 446182008-10-31T16:52:00031 October 2008 16:52:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Rod Control Malfunction ENS 443182008-06-26T21:32:00026 June 2008 21:32:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Trip Due to Loss of 1B Reactor Coolant Pump ENS 422112005-12-17T08:11:00017 December 2005 08:11:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip from Full Power Due to a Failed Feed Flow Channel ENS 415782005-04-08T19:43:0008 April 2005 19:43:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Main Steamline Isolation Valves Closed on Valid Signal ENS 414572005-03-02T21:29:0002 March 2005 21:29:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Actuation of Motor Driven Afw Pumps During Outage 2023-04-02T07:52:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_44618&oldid=426135"